1.

The distance from the street to the front of a structure is called a(n) _____.

a)

front setback

b)

right of way

c)

foundation easement

d)

greenway

2.

Section drawings are used in both architectural and _____.

a)

structural plans

b)

roof plans

c)

floor plans

d)

site plans

3.

In a finish schedule, each room is identified by its _____.

a)

name and number

b)

primary purpose

c)

overall square feet

d)

scheduled completion date

4.

Submittal drawings are usually prepared by _____.

a)

contractors

b)

supervisors

c)

equipment manufacturers

d)

architects

5.

The material symbol shown in Figure RQ01 represents _____.

a)

loose fill or batts

b)

common brick

c)

rubble

d)

concrete

6.

The plumbing symbol shown in Figure RQ02 represents a(n) _____.

a)

shower

b)

lavatory

c)

recessed radiator

d)

water heater

7.

If a line on a drawing measures 4" in length and the drawing scale is ¼" = 1'-0", the line represents an item that is _____.

a)

4' long

b)

8' long

c)

12' long

d)

16' long

8.

The most commonly used specifications format in North America is called the

a)

IRC®

b)

NFPA 5000®

c)

MasterFormat™

d)

ANSI specifications

9.

Once adopted by a local jurisdiction, model building codes (a)   .

10.

An important general rule about codes is that in almost every situation the most ____.

a)

recently adopted codes take precedence

b)

adopted codes take precedence

c)

stringent local codes take precedence

d)

often cited codes take precedence