wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Teamwork and Concurrent Engineering Assessment NEGH

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

Engineers are doers, they make things happen.

a)

True

b)

False

2.

Project management and teamwork was originally developed to manage defense contracts.

a)

True

b)

False

3.

Great teams need great leadership.

a)

True

b)

False

4.

A Flat Model for leadership sees leaders as equals, not above.

a)

True

b)

False

5.

The use of teams accompanied by new technologies has changed the process of engineering.

a)

True

b)

False

6.

Averaging a decision gets everyone’s opinion before the leader comes to a final decision.

a)

True

b)

False

7.

Attendance, dependability, responsibility for tasks, abilities to meet purpose, creativity, and energy are attributes for success for:

a)

None of these

b)

Leaders

c)

All Team Members

d)

Teams

8.

Leadership model in which a leader is positioned closely to all members of the team and has short, direct communication:

a)

Traditional

b)

Participative

c)

Flat

d)

Consultant

9.

Leadership model where a strong leader directs the actions:

a)

Consultant

b)

Flat

c)

Participative

d)

Traditional

10.

The total time needed to plan, prototype, and procure materials and to create marketing strategies, devise tooling, begin production and bring new product to the market is the definition of:

a)

Time to Market

b)

Speed

c)

Concurrent Engineering

d)

All of these are correct

11.

What should not be compromised when trying to meet standards and deadlines?

a)

Speed

b)

None of these are correct

c)

All of these are correct

d)

Quality

12.

The Forming stage is when:

a)

All of these are correct

b)

Feelings of cooperation develop

c)

Team members become acquainted

d)

Members pitch in to help one another

13.

Common goal or purpose, leadership among every member, effective communication, harmonious relationships, and effective planning and use of resources are attributes for success for:

a)

Leaders

b)

Individual Team Members

c)

All of these are correct

d)

Teams

14.

Everyone works together (parallel operation) with marketing, manufacturing, and procurement personnel involved from the design of a product:

a)

International Tactics

b)

Traditional Engineering Practice

c)

Time to Market

d)

Concurrent Engineering

15.

The solutions to modern design problems come from:

a)

None of these are correct

b)

Engineers brainstorming individually

c)

Traditional Management personnel

d)

Specialists acting in teams