Health and Safety Quiz

Total questions: 8

Worksheet time: 4mins

Name
Class
Date
1.

Which of the following is NOT a detail required in an F10 document?

a)

Address of the site

b)

Number of operatives working

c)

Environmental impact assessment

d)

Details of principal designer

2.

Who is responsible for ensuring the health and safety during the operation of designed items?

a)

The construction workers

b)

The local authority

c)

The designers and manufacturers

d)

The project manager

3.

What does the HSE stand for?

a)

Health and Safety Evaluation

b)

Health and Safety Executive

c)

Health and Safety Examination

d)

Health and Safety Enforcement

4.

What percentage of construction accidents could have been prevented at the design stage according to the CDM Regulations 2015?

a)

25%

b)

50%

c)

35%

d)

40%

5.

Who is responsible for setting up the construction phase health and safety plan?

a)

The client

b)

The principal designer

c)

The principal contractor

d)

The design team

6.

What does the term "site induction" refer to?

a)

The process of hiring new workers.

b)

The presentation that makes new visitors or workers aware of site rules and hazards.

c)

The financial induction of the project.

d)

The introduction of new construction materials.

7.

What must the principal designer assist the client with?

a)

Designing the building layout

b)

Identifying and collating pre-construction information

c)

Hiring construction workers

d)

Supervising the construction site

8.

What is the key term used to describe the adequacy of facilities provided on a construction site?

a)

Efficient and effective

b)

Suitable and sufficient

c)

Adequate and ample

d)

Proper and plentiful