Font size
WorksheetsSoftware Engineering U3 - L5
Total questions: 30
Worksheet time: 20mins
What is the first step in a complete software engineering project? / 一个完整的软件工程项目的第一步是什么?
Project demonstration / 项目论证
Project review / 项目审核
Project initiation / 项目立项
Project approval / 项目批准
What does the feasibility study evaluate? / 可行性研究评估什么?
Project funding / 项目资金
Completion of the project with given resources / 在特定资源下项目的完成
Team dynamics / 团队动态
Marketing strategies / 市场策略
Which type of feasibility focuses on system functionality and performance? / 哪种可行性关注系统的功能和性能?
Operational feasibility / 操作可行性
Technical feasibility / 技术可行性
Economic feasibility / 经济可行性
Social feasibility / 社会可行性
What is a key component of economic feasibility studies? / 经济可行性研究的关键组成部分是什么?
Software debugging / 软件调试
Cost-benefit analysis / 成本效益分析
User training / 用户培训
Market research / 市场研究
Which of the following is an example of a social benefit? / 以下哪项是社会效益的例子?
Direct income from the system / 系统带来的直接收入
Improved user satisfaction / 提高用户满意度
Increased software costs / 增加软件成本
Reduced personnel training / 减少人员培训
Which of the following is a potential drawback of a project? / 以下哪项是项目的潜在缺点?
Increased efficiency / 提高效率
Higher operational costs / 更高的运营成本
Enhanced user experience / 增强用户体验
Improved data security / 改善数据安全性
What is typically included in a feasibility study report? / 可行性研究报告通常包括什么?
Project timeline / 项目时间表
Risk assessment / 风险评估
Team member roles / 团队成员角色
Marketing plan / 市场计划
During a feasibility study, analysts visit personnel, review documents, and identify the core problems users need to solve. Which step does this describe? / 在可行性研究中,分析人员访问相关人员、审阅文件并确认用户需要解决的核心问题。这描述的是哪个步骤?
Writing the feasibility study report / 撰写可行性研究报告
Designing a high-level logical model / 设计高层逻辑模型
Analyzing and studying the current system / 分析研究现行系统
Clearly defining system objectives / 明确系统目标
Which of the following tools is used to describe a system's organizational structure during the analysis of the current system? / 在分析现行系统的组织结构时,使用以下哪种工具进行描述?
Data flow diagram / 数据流图
System flowchart / 系统流程图
Organizational chart / 组织结构图
Gantt chart / 甘特图
Which of the following perspectives are considered when evaluating feasibility solutions? (Select ALL that apply) / 在评估可行性方案时,需要从哪些角度进行考量?(选择所有正确答案)
Technical feasibility / 技术可行性
Economic feasibility / 经济可行性
Personal preference of the developer / 开发人员的个人偏好
Operational feasibility / 操作可行性
Which of the following is NOT a typical component of a project development plan? / 以下哪项通常不是项目开发计划的组成部分?
Personnel organization and division of labor / 人员组织及分工
Feasibility study conclusions / 可行性研究结论
Implementation plan with timeline / 带时间表的实施计划
Delivery deadline / 交付期限
When proposing multiple solutions during a feasibility study, what must developers consider for each option? / 在可行性研究中提出多个方案时,开发人员对每个方案必须考虑什么?
The marketing budget only / 仅考虑营销预算
Technical and economic feasibility among other factors / 技术和经济可行性等因素
The personal background of team members / 团队成员的个人背景
The number of competitors in the market / 市场上竞争者的数量
What is the primary purpose of conducting a feasibility study? / 进行可行性研究的主要目的是什么?
To assess project risks / 评估项目风险
To determine project viability / 确定项目可行性
To allocate project resources / 分配项目资源
To finalize project design / 确定项目设计
Which aspect is NOT typically assessed in a technical feasibility study? / 技术可行性研究中通常不评估哪个方面?
Software compatibility / 软件兼容性
Market demand / 市场需求
Hardware requirements / 硬件要求
System performance / 系统性能
What is a common method for gathering data during a feasibility study? / 在可行性研究中收集数据的常用方法是什么?
Code reviews / 代码审查
System testing / 系统测试
Surveys and interviews / 调查和访谈
Focus groups / 焦点小组
Which of the following best describes the purpose of a risk assessment in a feasibility study? / 以下哪项最能描述可行性研究中风险评估的目的?
To identify potential project delays / 识别潜在的项目延误
To analyze market trends / 分析市场趋势
To evaluate team performance / 评估团队表现
To determine user satisfaction levels / 确定用户满意度
Which of the following is a common challenge faced during a feasibility study? / 在可行性研究中常见的挑战是什么?
All of these / 所有这些
Stakeholder disagreements / 利益相关者之间的分歧
Insufficient data collection / 数据收集不足
Overly optimistic projections / 过于乐观的预测
What is the main focus of operational feasibility studies? / 操作可行性研究的主要关注点是什么?
Cost analysis / 成本分析
System performance / 系统性能
User acceptance / 用户接受度
Technical requirements / 技术要求
What is the significance of stakeholder analysis in a feasibility study? / 利益相关者分析在可行性研究中的重要性是什么?
All of these / 所有这些
To understand user needs / 理解用户需求
To identify potential risks / 识别潜在风险
To ensure project alignment with business goals / 确保项目与业务目标一致
What is a critical factor to consider when assessing economic feasibility? / 评估经济可行性时需要考虑的关键因素是什么?
Project team experience / 项目团队经验
User interface design / 用户界面设计
Technical specifications / 技术规格
Return on investment / 投资回报率
A feasibility study can only be concluded in one of two ways: the project is feasible, or it is not feasible. / 可行性研究只能得出两种结论:项目可行或不可行。
The project demonstration phase and the feasibility study phase refer to the same process. / 项目论证阶段和可行性研究阶段指的是同一过程。
The new system developed during a software project should completely ignore the functions of the existing system and start from scratch. / 软件项目开发的新系统应完全忽略现有系统的功能,从零开始。
True
False
Risk feasibility is one of the dimensions that must be evaluated during a feasibility study. / 风险可行性是可行性研究中必须评估的维度之一。
A project development plan must be created regardless of whether the feasibility study concludes the project is worth developing. / 无论可行性研究的结论是否认为项目值得开发,都必须制定项目开发计划。
Developers compare several solutions and choose the most (a) one.
Task division and responsible persons are included in the (a) plan.
The new system should improve problems found in the (a) system.
During feasibility analysis, analysts must identify the resources needed to achieve system (a) .
Before software development begins, the project must pass the feasibility (a) .