Job Safety Analysis Quiz

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

Who develops and signs JSA Levels 1 and 2?

a)

Area Authority (AA)

b)

Permit Issuer (PI)

c)

Performing Authority (PA)

d)

Job Performer (JP)

2.

True or False: You can choose the right PPE, Life-Saving Rules, and Hazard Controls in JSA 1.

a)

True

b)

False

3.

When do we use a Formal Risk Assessment (FRA)?

a)

With all Hot Work Permits

b)

With all Critical Work Permits

c)

When the Work Categorization Chart (WCC) says so

d)

When the IWAP Team says so

4.

Complete the sentence: When the Area Authority (AA) chooses the Prerequisite Controls, _____.

a)

The controls must be done by the Permit Issuer (PI)

b)

The controls are more important

c)

The Permit Issuer (PI) will check the controls during Permit Issue

d)

The controls must be checked and working before the Area Authority (AA) gives permission

5.

Match the Permit with the JSA Level:

  1. 1-Hot Work Permit

2-General Work Permit

3-Critical Work Permit

A. JSA Level 1

B. JSA Level 2

a)

1A-2C-3B

b)

1B-2A-3C

c)

1B-2B-3A

d)

1B-2A-3B

6.

Why do we do a Job Safety Analysis (JSA)?

a)

To clearly describe the job and where it will be done

b)

To find possible dangers at the worksite

c)

To make sure we have safety measures to reduce risks

d)

All answers are correct

7.

True or False: The Risk Assessment Team Leader must lead the Formal Risk Assessment and make sure all risks and controls are identified.

a)

True

b)

False

8.

The Asset Approval Authority (AAA) gets their authority from:

a)

Asset Owner

b)

Area Authority (AA)

c)

Performing Authority (PA)

d)

Senior Vice President (SVP)

9.

The work scope on the FRA should include:

a)

Description of the activity and sub-tasks

b)

The location of the work and other affected areas

c)

The equipment or system used

d)

All answers are correct

10.

What does SHCF stand for?

a)

Standard Hazard Control Form

b)

Safety and Health Control Form

c)

Standard Hazard Control File

d)

None of the above

11.

After finishing a new JSA, who must approve it before the standard library is updated?

a)

Asset Owner Representative

b)

Area Authority Representative

c)

Performing Authority Representative

d)

None of the above

12.

True or False: Before starting any work, we must do a Health, Safety, and Environment (HSE) check for employees, contractors, and equipment.

a)

True

b)

False

13.

Why do we need to do a Job Safety Analysis (JSA)?

a)

To make sure the job and its location are clearly defined

b)

To identify possible dangers

c)

To make sure control measures are in place

d)

All answers are correct

14.

Who is responsible for managing the Risk Assessment Process?

a)

Performing Authority (PA)

b)

Asset Approval Authority (AAA)

c)

Risk Assessment Team Leader

d)

Risk Assessment Team Member

15.

True or False: In the first Job Safety Analysis done in the IWAP, the type of permit decides the JSA level.

a)

True

b)

False

16.

When writing JSA 1, what should the Performing Authority (PA) identify?

a)

Personal Protective Equipment (PPE) needed

b)

Life-Saving Rules (LSRs)

c)

Dangers and control measures

d)

All answers are correct

17.

How often should we review a Formal Risk Assessment?

a)

Every 1 year

b)

Every 2 years

c)

Every 3 years

d)

Every 6 months

18.

Who approves the updated version of the JSA?

a)

Isolating Operator (ISO)

b)

Asset Owner Representative

c)

Job Performer

d)

Permit Endorser (PE)

19.

When evaluating a hazard, the Risk Assessment Team looks at:

a)

Recovery measures and elimination

b)

The hierarchy and level of JSA

c)

Hazard severity and the likelihood it will happen

d)

None of the above

20.

True or False: If the Risk Assessment Team finds the risks are too complex, a new team must be set up to assess them further.

a)

True

b)

False