wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Adv GATE_B12&13_23.10

Total questions: 14

Worksheet time: 28mins

Name
Class
Date
1.

A sanitary landfill is provided with High-Density Poly Ethylene (HDPE) lining along the ground surface. This is provided primarily to prevent

a)

Bleaching

b)

Leaching

c)

Rodents

d)

Plant growth

2.

Super-elevation of a road with a pre-determined radius of curvature is primarily dependent on

a)

Altitude

b)

Traffic volume

c)

Soil bearing capacity

d)

Design traffic speed

3.
a)

A

b)

B

c)

C

d)

D

4.
a)

A

b)

B

c)

C

d)

D

5.
a)

A

b)

B

c)

C

d)

D

6.
a)

A

b)

B

c)

C

d)

D

7.
a)

A

b)

B

c)

C

d)

D

8.

The solar protection system consists of fixed slats or grids, outside a building façade in
front of openings is known as

a)

Brise-soleil

b)

Malqaf

c)

Solarium

d)

Trombe wall

9.
a)

A

b)

B

c)

C

d)

D

10.
a)

A

b)

B

c)

C

d)

D

11.

Which of the following processes is NOT adopted in solid waste management?

a)

Incineration

b)

Pyrolysis

c)

Flocculation

d)

Sanitary landfill

12.

'Segregation at source' is a concept associated with

a)

Solid waste management

b)

Traffic management

c)

Disaster management

d)

Water management

13.
a)

A

b)

B

c)

C

d)

D

14.
a)

A

b)

B

c)

C

d)

D