Chapter 9 Veterinary Center

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

The title page lists all of the key entities involved in a project, such as the structural engineer, civil engineer, construction management firm, landscape architect, and mechanical engineer.

a)

True

b)

False

2.

The Foundation Plan shows both the underground work that needs to be completed at the beginning of the project for storm and sanitary sewer piping and surface paving work to be completed near the end of the project.

a)

True

b)

False

3.

The Grading and Utility Plan includes both the concrete foundation work and the structural steel information for the project.

a)

True

b)

False

4.

All exterior wall and interior partition dimensions are given on the First Floor Plan.

a)

True

b)

False

5.

A different gridline system is used on the Second Floor Plan as the Foundation Plan and the First Floor Plan.

a)

True

b)

False

6.

Light fixtures to be installed around the outside of the building are shown with circles containing letters that relate to the electrical fixture schedule located on Specifications—Electrical, Sheet E-7.

a)

True

b)

False

7.

The roof pitch is 0.9” of rise for every 12” of horizontal run on the lower roof.

a)

True

b)

False

8.

Signage is shown on the exterior elevation drawings.

a)

True

b)

False

9.

Solid lines on the door into the sprinkler room indicate the hinged side of the door.

a)

True

b)

False

10.

An 18K4 bar joist is 18” high.

a)

True

b)

False