Spesifikasi Teknis Pekerjaan Konstruksi 1

Total questions: 12

Worksheet time: 12mins

Name
Class
Date
1.

What must construction work follow according to the RKS document?

a)

Cost estimates

b)

Standards Quality

c)

Time schedules

d)

Material lists

2.

What is the maximum thickness for each layer of soil during compaction?

a)

10 cm

b)

15 cm

c)

20 cm

d)

25 cm

3.

What is the required quality of concrete unless specified otherwise in the drawings?

a)

fc'30 Mpa

b)

fc'35 Mpa

c)

fc'20 Mpa

d)

fc'25 Mpa

4.

What is the minimum thickness for the layer of sirtu during construction?

a)

10 cm

b)

25 cm

c)

15 cm

d)

20 cm

5.

What should be done if the foundation excavation has roots or loose soil?

a)

Excavate and refill with sand

b)

Fill it with gravel

c)

Cover it with concrete

d)

Leave it as is

6.

What is the required mixture for the Trassram mortar used in brick walls?

a)

1 PC: 5 Sand

b)

1 PC: 4 Sand

c)

1 PC: 3 Sand

d)

1 PC: 2 Sand

7.

What is the minimum thickness for plastering walls?

a)

1 cm

b)

2 cm

c)

0.5 cm

d)

1.5 cm

8.

What must be done before installing the ceiling?

a)

Finish the exterior

b)

Lay the flooring

c)

Install electrical systems

d)

Paint the walls

9.

What is the purpose of the specifications in the RKS document?

a)

To outline project costs

b)

To ensure quality construction

c)

To schedule project timelines

d)

To select construction materials

10.

What is the maximum depth for the layer of loose soil during compaction?

a)

15 cm

b)

10 cm

c)

20 cm

d)

25 cm

11.

What should be done to areas with water accumulation during construction?

a)

Create temporary drainage

b)

Fill them with concrete

c)

Ignore them

d)

Cover them with tarps

12.

What is the required ratio of PC to sand for ceramic tile adhesive?

a)

1:4

b)

1:2

c)

1:3

d)

1:1