What is the concept of quality understood as?

a)

Complete technical requirement fulfillment

b)

Satisfaction of reasonable customer expectations

c)

Manufacturer's control

d)

Lowest price

2.

According to Professor Juran, what is quality?

a)

Meeting customer expectations

b)

Conformance to certain requirements

c)

Conformance to needs

d)

Minimizing production costs

3.

Which chart is used to identify the main cause of a problem?

a)

Pareto chart

b)

Control chart

c)

Scatter plot

d)

Cause-and-effect diagram

4.

What is the main purpose of the Pareto chart?

a)

Identify the relationship between two variables

b)

Classify causes by their level of importance

c)

Control product quality

d)

Store information

5.

What is the control chart typically used for?

a)

Collecting and storing data

b)

Identifying the relationship between two factors

c)

Calculating correlation coefficient

d)

Measuring dispersion

6.

In the histogram, what does the horizontal axis represent?

a)

Frequency of occurrence of the issue

b)

Amount of collected data

c)

Data values

d)

Width of the intervals between classes

7.

What is the first step in the process of drawing a Pareto chart?

a)

Draw the chart

b)

List activities and count occurrences

c)

Calculate total occurrences

d)

Analyze results

8.

Flow charts are used to:

a)

Identify the cause of a problem

b)

Monitor the distribution of parameters

c)

Represent a sequence of necessary steps

d)

Control product quality

9.

What components does a control chart include?

a)

Central control line, upper and lower limits

b)

Central line and standard deviation

c)

Trend line and central line

d)

Frequency and standard deviation

10.

What does a scatter plot signify in quality analysis?

a)

Measuring the variation of characteristics

b)

Indicating

11.

What does a scatter plot signify in quality analysis?

a)

Measuring changes in characteristics

b)

Indicating the relationship between two variables

c)

Classifying data by frequency

d)

Evaluating the distribution of parameters

12.

Which chart shows the distribution of product parameters during production?

a)

Pareto chart

b)

Scatter plot

c)

Histogram

d)

Control chart

13.

What is the goal of quality management?

a)

Meeting the needs of the producer

b)

Meeting and exceeding customer expectations

c)

Optimizing the company's profits

d)

Minimizing financial risks

14.

Which chart is used to check the stability of a process?

a)

Control chart

b)

Causal chart

c)

Pareto chart

d)

Scatter plot

15.

What principle is the Pareto chart based on?

a)

90 - 10

b)

70 - 30

c)

80 - 20

d)

60 - 40

16.

What is the benefit of using a control chart?

a)

Optimizing the production process

b)

Systematically tracking and storing data

c)

Evaluating supplier capabilities

d)

Controlling product price levels

17.

Which of the following causes can lead to a control chart indicating an unstable process?

a)

Data outside the control limits

b)

Data points within the control limits

c)

Data concentrated around the center line

d)

Data trends evenly

18.

When is a flowchart typically applied?

a)

When needing to summarize frequency data

b)

When needing to optimize costs

c)

When a team is working on a process improvement

d)

When analyzing data distribution

19.

Which chart shows the relationship between costs and revenues in a company?

a)

Pareto chart

b)

Scatter plot

c)

Control chart

d)

Density chart

20.

Which chart shows the relationship between cost and revenue in a company?

a)

Pareto chart

b)

Scatter plot

c)

Control chart

d)

Density distribution chart

21.

What is the first step when building a control chart?

a)

Calculate the average value

b)

Collect data

c)

Find the maximum and minimum values

d)

Determine the control line

22.

What causes can be identified through an Ishikawa chart?

a)

Sub-causes of a quality issue

b)

Distribution of products in the market

c)

Frequency of production errors

d)

Relationship between cost and profit

23.

Which chart shows the distribution of data across different frequency classes?

a)

Pareto chart

b)

Density distribution chart (Histogram)

c)

Control chart

d)

Scatter plot

24.

What is one of the benefits of the 7 statistical tools in quality management?

a)

Increase production costs

b)

Detect and eliminate errors before mass production

c)

Conduct comprehensive checks on final products

d)

Minimize customer requirements

25.

When should a scatter plot be used?

a)

When needing to identify the main cause of an issue

b)

When wanting to examine the relationship between two variables

c)

When needing to classify errors by severity

d)

When wanting to store test data

26.

In a control chart, what does the center line represent?

a)

Maximum limit line

b)

Minimum limit line

c)

Average value of the process

d)

Average value of the errors that occur

27.

What is the main goal of using statistical tools in quality management?

a)

Increase production output

b)

Reduce labor costs

c)

Improve and ensure product quality

d)

Enhance profits

28.

What is statistical control in quality management?

a)

Increase production output

b)

Reduce labor costs

c)

Improve and ensure product quality

d)

Increase profits

29.

Which symbol is commonly used in flowcharts to represent a decision point?

a)

Rectangle

b)

Circle

c)

Diamond

d)

Arrow

30.

In a Pareto chart, which factor should be focused on?

a)

The factor with the lowest frequency

b)

The factor with the least impact on quality

c)

The factor with the highest frequency

d)

The factor with the highest cost

31.

Which chart uses bars to illustrate phenomena and causes by frequency?

a)

Control chart

b)

Cause-and-effect chart

c)

Pareto chart

d)

Control sheet

32.

What is the first requirement for building an X-R control chart?

a)

Calculate the standard deviation

b)

Find the centerline

c)

Collect representative data for the process

d)

Count the number of defects

33.

When data in a scatter plot shows an inverse relationship, what does this mean?

a)

X increases, Y increases

b)

X increases, Y decreases

c)

Y is independent of X

d)

X decreases, Y increases

34.

What is the main purpose of a control chart?

a)

To identify the cause of quality issues

b)

To control the stability of the production process

c)

To classify defects by importance

d)

To monitor production costs

35.

What is the final step when constructing a Pareto chart?

a)

Calculate the total occurrences of defects

b)

Sort defects by frequency

c)

Analyze results and identify defects to prioritize

d)

Draw the chart

36.

Which chart allows for the analysis of data dispersion around the mean?

a)

Control chart

b)

Density distribution chart (Histogram)

c)

Cause-and-effect chart

d)

Scatter plot

37.

Which data is not suitable for collection through a control sheet?

a)

Frequency of product defects

b)

Customer feedback information

38.

Which data below is not suitable for collection through a control chart?

a)

Frequency of product defects

b)

Customer feedback information

c)

Shipping time

d)

Production cost

39.

What does the 'bell' shape of the density distribution chart represent?

a)

A process with many fluctuations

b)

A stable process

c)

Unevenly distributed data

d)

No uniformity in the process

40.

In the Ishikawa diagram, what is 'Materials'?

a)

A result

b)

A main cause

c)

A secondary cause

d)

A control tool

41.

What tool is used to assess the conformity of the production process to technical standards?

a)

Control chart

b)

Pareto chart

c)

Scatter plot

d)

Flowchart

42.

What is the benefit of using a scatter plot?

a)

Classifying defects by frequency

b)

Controlling the stability of the process

c)

Identifying the relationship between two variables

d)

Storing customer information

43.

Which type of chart can help detect data points outside control limits?

a)

Causal diagram

b)

Control chart

c)

Density distribution chart

d)

Control sheet

44.

In a Pareto chart, what does the cumulative curve represent?

a)

Number of production defects

b)

Frequency of defects over time

c)

Cumulative percentage of defects

d)

Cumulative percentage of production costs

45.

What is another name for the causal diagram?

a)

Pareto chart

b)

Fishbone diagram

c)

Scatter plot

d)

Control chart

46.

When data in a control chart is outside the upper limit, what does this mean?

a)

Stable process

b)

Abnormal process

c)

Data is faulty

d)

Increase frequency of checks

47.

In a Pareto chart, what does group A represent?

4 lines
48.

What does this mean?

a)

Stable process

b)

Abnormal process

c)

Data error

d)

Increase inspection frequency

49.

In the Pareto chart, what does group A represent?

a)

Less important factors

b)

Factors that account for 80% of importance

c)

Factors that do not need much attention

d)

Factors that account for 20% of importance

50.

What does the scatter plot help determine between two variables?

a)

Data classification

b)

Frequency distribution

c)

Dependent relationship

d)

Standard deviation

51.

How does the Pareto chart assist quality management?

a)

Helps identify specific product defects

b)

Helps identify important defects to prioritize

c)

Analyzes the rate of compliant products

d)

Enhances stability in production

52.

What factors does a control chart typically include?

a)

Error name, cause, corrective action

b)

Error code, number of errors, inspection date

c)

Inspection location, supervisor, production result

d)

Cost, time, efficiency

53.

What characteristic does the X-R control chart monitor?

a)

Frequency of errors

b)

Size and variability of the process

c)

Production speed

d)

Production time

54.

Which of the following is not a benefit of a Flow Chart?

a)

Simplifying the workflow

b)

Helping employees understand the process

c)

Monitoring production costs

d)

Achieving consistency in the process

55.

What does the 'sawtooth' shape of the density distribution chart indicate?

a)

Stable process

b)

Unevenly distributed data

c)

Perfect production process

d)

Data concentrated around the central value

56.

What is the first step in building a flowchart?

a)

Check the current process

b)

List activities in order

c)

Draw steps in order

d)

Identify the process goal

57.

Which chart helps identify important factors?

4 lines
58.

What is a flowchart?

a)

Check the current process

b)

List activities in order

c)

Draw steps in order

d)

Identify the goals of the process

59.

Which chart helps identify important factors in product quality?

a)

Scatter plot

b)

Pareto chart

c)

Density distribution chart

d)

Control chart

60.

What is one of the main causes in the fishbone diagram?

a)

Result

b)

Product

c)

Raw materials

d)

Market

61.

What issue does the control chart help detect in production?

a)

Changes in product quality

b)

High production costs

c)

Increased labor productivity

d)

Reduced production costs

62.

What is the first step before analyzing the density distribution chart?

a)

Determine the average value

b)

Identify the minimum and maximum values of the data

c)

Calculate the correlation coefficient

d)

Draw the control line

63.

What is the significance of using control charts in quality management?

a)

Control the level of product variability

b)

Classify product defects

c)

Increase the number of compliant products

d)

Reduce the frequency of product inspections

64.

What does the Pareto chart focus on?

a)

The least important factor

b)

The most important factor to improve

c)

The least frequent factor

d)

The least impactful factor on quality

65.

What does the density distribution chart show about the measured values of the production process?

a)

Frequency of occurrence of measured values

b)

Causes of incidents

c)

Relationships between factors

d)

Percentage of production errors

66.

What is the main goal of the Ishikawa diagram?

a)

Analyze production costs

b)

Identify the causes of quality issues

c)

Control variability in production

d)

Monitor production progress

67.

What is the first step in building a density distribution chart?

4 lines
68.

What is the first step in building a distribution density chart?

a)

Collect data through checklists

b)

Draw control limits

c)

Analyze the average value

d)

Identify the factors causing errors

69.

What lines does the X-R control chart include?

a)

Center line and control limits

b)

Frequency line and variation line

c)

Error line and control line

d)

Boundary line and variation line

70.

What is the significance of the Pareto chart in quality management?

a)

Enhance product stability

b)

Identify the least common errors

c)

Help focus on the most important factors

d)

Analyze the degree of data dispersion

71.

A scatter plot shows the relationship between two variables X and Y. When X increases, Y decreases. What is this relationship?

a)

Direct relationship

b)

Inverse relationship

c)

No relationship

d)

Random relationship

72.

In a flowchart, what does the rectangular symbol represent?

a)

Decision point

b)

Start or end point

c)

Step in the process

d)

Transition between steps

73.

What does the control chart help identify?

a)

Frequency of product errors

b)

Stability of the process

c)

Production costs

d)

Changes in customer demand

74.

What does the 'skewed to one side' shape of the distribution density chart indicate?

a)

Stable process

b)

Even dispersion

c)

Abnormal issues in the process

d)

All measured values meet standards

75.

What is the last step in building a control chart?

a)

Draw the chart and note necessary information

b)

Calculate the standard deviation

c)

Sum the values

d)

Check values outside control limits

76.

What is the purpose of building a control chart?

a)

Draw the chart and note the necessary information

b)

Calculate the standard deviation

c)

Calculate the total value

d)

Check the out-of-control values

77.

When should a fishbone diagram (Ishikawa diagram) be used?

a)

When determining the degree of data dispersion

b)

When identifying the cause of a problem

c)

When monitoring the frequency of errors

d)

When controlling production costs

78.

What is the main objective of a control chart?

a)

Check the standard deviation of the product

b)

Classify errors by severity

c)

Collect and store data on product errors

d)

Measure the degree of data dispersion

79.

Which chart helps evaluate whether a process complies with control limits?

a)

Causal diagram

b)

Pareto chart

c)

Control chart

d)

Density distribution chart

80.

What is the first step in creating a scatter plot?

a)

Collect pairs of data for two variables

b)

Calculate the correlation coefficient

c)

Plot the points on the chart

d)

Determine the average value of the data

81.

What is the significance of the Pareto chart in quality management?

a)

Enhance product stability

b)

Identify the least common errors

c)

Help focus on the most important factors

d)

Analyze the degree of data dispersion

82.

A scatter plot shows the relationship between two variables X and Y. When X increases, Y decreases. What type of relationship is this?

a)

Direct relationship

b)

Inverse relationship

c)

No relationship

d)

Random relationship

83.

In a flowchart, what does a rectangular symbol represent?

a)

Decision point

b)

Start or end point

c)

Step in the process

d)

Transition between steps

84.

What does a control chart help identify?

a)

Frequency of product errors

b)

Stability of the process

85.

What does the control chart help to determine?

a)

Product defect frequency

b)

Process stability

c)

Production cost

d)

Changes in customer demand

86.

What does the 'one-sided slope' shape of the density distribution chart indicate?

a)

Stable process

b)

Uniform dispersion

c)

Abnormal issues in the process

d)

All measured values meet standards

87.

What is the final step when constructing a control chart?

a)

Draw the chart and note necessary information

b)

Calculate the standard deviation

c)

Sum the values

d)

Check values outside control limits

88.

When should a fishbone diagram (Ishikawa diagram) be used?

a)

When determining data dispersion

b)

When identifying the cause of a problem

c)

When monitoring defect frequency

d)

When controlling production costs

89.

What is the main objective of a control sheet?

a)

Check the standard deviation of products

b)

Classify defects by severity

c)

Collect and store data on product defects

d)

Measure data dispersion

90.

Which chart helps evaluate whether a process adheres to control limits?

a)

Causal diagram

b)

Pareto chart

c)

Control chart

d)

Density distribution chart

91.

What is the first step in creating a scatter plot?

a)

Collect pairs of data for two variables

b)

Calculate the correlation coefficient

c)

Plot points on the chart

d)

Determine the average value of the data

92.

What does the density distribution chart (Histogram) help to identify?

a)

Cause of the problem

b)

Data distribution by frequency classes

c)

Production cost

d)

Relationship between two variables

93.

Correlation coefficient

4 lines
94.

What does a density distribution chart (Histogram) help identify?

a)

Cause of the problem

b)

Distribution of data across frequency classes

c)

Production cost

d)

Relationship between two variables

95.

What does the correlation coefficient in a scatter plot signify?

a)

Assessing the stability of the process

b)

Determining production costs

c)

Showing the degree of dependence between two variables

d)

Classifying data by frequency

96.

In the Ishikawa diagram, what is the factor 'Human' considered?

a)

Minor cause

b)

Main cause

c)

Result

d)

Solution

97.

When is the Pareto chart typically applied?

a)

When analyzing the relationship between two variables

b)

When focusing on the most important causes

c)

When assessing the stability of the process

d)

When measuring the degree of variation in data

98.

What process does a flowchart assist with?

a)

Controlling product quality

b)

Evaluating error frequency

c)

Analyzing work processes

d)

Enhancing product stability

99.

What does it indicate when a control chart has points outside the limits?

a)

Stable process

b)

Process with issues that need resolution

c)

Absolute stability of the process

d)

No changes in the process

100.

In quality management, which of the following is a primary goal of control charts?

a)

Monitoring production costs

b)

Reducing production time

c)

Identifying when to adjust the process

d)

Increasing product inspection frequency

101.

What does a scatter diagram help analyze?

a)

Stability of a process

b)

Error rate in production

c)

Relationship between two variables

d)

Production cost

102.

What is the significance of the 'bimodal' shape in a density distribution chart?

a)

All products meet standards

b)

Data from multiple processes are mixed

c)

None

103.

What does the shape 'two peaks' in a density distribution chart signify?

a)

All products meet standards

b)

Data from multiple processes are mixed

c)

There are no defective products

d)

The production process is stable

104.

When analyzing an Ishikawa diagram, which step is crucial to identify the root cause of the problem?

a)

List all possible causes

b)

Calculate the frequency of errors

c)

Draw a scatter plot

d)

Identify important data pairs

105.

In a control chart, when all points are within control limits but show a trend of increasing or decreasing, what does this indicate?

a)

Stable process

b)

Unstable process

c)

There is a trend in the process

d)

Product does not meet requirements

106.

What is the purpose of using a density distribution chart?

a)

Identify relationships between variables

b)

Analyze the frequency of errors

c)

Monitor the distribution of product parameters

d)

Identify the causes of a problem

107.

What is the first step in building an Ishikawa diagram?

a)

Identify the problem to be solved

b)

Determine the average value of the data

c)

Collect data

d)

Check the production process

108.

From what percentage of main causes do most product defects typically arise in a Pareto chart?

a)

90%

b)

70%

c)

80%

d)

20%

109.

What is the data collected from control sheets typically used for?

a)

Calculate production costs

b)

Analyze the severity of errors

c)

Input into other analytical tools like Pareto charts

d)

Increase the frequency of product checks

110.

What is one of the benefits of a Pareto chart?

a)

Check the stability of the production process

b)

Increase the frequency of product checks

c)

Focus on important factors for improvement

d)

Ensure quality control

111.

What is one of the benefits of the Pareto chart?

a)

Check the stability of the production process

b)

Increase the frequency of product checks

c)

Focus on important factors for improvement

d)

Ensure all products meet standards

112.

What is the purpose of a control chart with upper and lower limits?

a)

Determine the frequency of product defects

b)

Ensure products meet quality standards

c)

Evaluate the stability of the process

d)

Monitor the dispersion of data

113.

When constructing a scatter plot, how many data pairs should be analyzed at least?

a)

10

b)

20

c)

30

d)

40

114.

What does the Ishikawa diagram help to identify in a production process?

a)

The relationship between two variables

b)

The causes of quality issues

c)

The frequency of product defects

d)

The rate of compliant products

115.

In quality management, what is the English name for the control chart?

a)

Pareto chart

b)

Control chart

c)

Cause-and-effect diagram

d)

Scatter plot

116.

Which chart is used to identify trends and patterns in data over time?

a)

Control chart

b)

Pareto chart

c)

Density distribution chart

d)

Control sheet

117.

What is one of the main characteristics of quality?

a)

Quality is always fixed

b)

Quality does not change over time

c)

Quality is always variable

d)

Quality does not depend on customer demand

118.

What type of information does a control sheet help to store?

a)

Frequency and type of errors occurring

b)

Production costs of each product

c)

Dispersion frequency of data

d)

Relationship between costs and profits

119.

In a flowchart, what does a diamond shape represent?

a)

Start or end of a process

b)

Execution step

c)

Decision point

d)

Transition between steps

120.

In a flowchart, what does a diamond shape represent?

a)

Start or end of a process

b)

Step to be performed

c)

Decision point

d)

Transition between steps

121.

Which chart uses vertical bars to show the frequency of each type of error?

a)

Control chart

b)

Pareto chart

c)

Scatter plot

d)

Ishikawa chart

122.

When all points in a control chart are within control limits, what does this indicate?

a)

The process is completely stable

b)

The process needs to be rechecked

c)

Errors are increasing

d)

The process is not meeting requirements

123.

Flowcharts often help clarify what in the production process?

a)

The relationship between causes of errors

b)

Each step of the process

c)

The frequency of each product error

d)

The distribution of data across frequency layers

124.

What does the 'peak' shape of a density distribution chart signify?

a)

The process is completely stable

b)

There is mixing from multiple different processes

c)

All data is within control limits

d)

There is no difference between measured values

125.

What is the most important step when analyzing an Ishikawa chart?

a)

Identify all potential causes

b)

Draw a control chart

c)

Measure the degree of process variation

d)

Calculate the frequency of product errors