wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

306 Hot water systems 3 Quiz

Total questions: 18

Worksheet time: 14mins

Name
Class
Date
1.

Which of the following cylinder types is a direct cylinder?

a)

A

b)

B

c)

C

2.

State the minimum size of open vent pipe which terminates over a cold water storage cistern that is allowed under the Water Regulations for a secondary domestic hot water system.

a)

15mm

b)

22mm

c)

28mm

d)

32mm

3.

What is the recommended temperature setting for the thermostat to an immersion heater in a hot water storage cylinder?

a)

90°C

b)

70°C

c)

60°C

d)

50°C

4.

Which type of hot water storage cylinder is shown in this diagram?

a)

Direct cylinder

b)

Combination unit

c)

Double feed indirect cylinder

d)

Single feed indirect cylinder

5.

A hot water storage cylinder heated by an immersion heater only is considered to be what type of hot water storage system?

a)

Direct

b)

Indirect

c)

Electrolytic

d)

Instantaneous

6.

When water is heated in a hot water storage cylinder, stratification will occur. Which of the following best describes stratification?

a)

The hottest water is in the middle of the cylinder; the coldest water is at the top and bottom of the cylinder

b)

The coldest water is at the top of the cylinder and the hottest water is at the bottom of the cylinder

c)

The coldest water is in the middle of the cylinder; the hottest water is at the top and bottom of the cylinder

d)

The hottest water is at the top of the cylinder and the coldest water is at the bottom of the cylinder

7.

The recommended minimum size of primary circulation pipework between a small (under 35kW) solid fuel boiler serving a direct hot water cylinder only is:

a)

15mm

b)

22mm

c)

28mm

d)

35mm

8.

What is the electrical power rating of a typical domestic immersion heater?

a)

3kW

b)

3.7kW

c)

4kW

d)

10kW

9.

The difference between a single feed and a double feed indirect cylinder is:

a)

the single feed cylinder requires a booster pump

b)

the single feed cylinder does not need a separate feed and expansion cistern

c)

the single feed cylinder requires a twin port motorised valve arrangement

d)

the single feed cylinder does not require an open vent pipe to the secondary storage cistern

10.

The following diagram shows an indirect hot water system. Which section of pipe is missing from the diagram?

a)

Primary cold feed pipe

b)

Primary open vent pipe

c)

Secondary cold feed pipe

d)

Secondary open vent pipe

11.

What type of cylinder is shown below?

a)

Single feed indirect cylinder

b)

Direct cylinder

c)

Combination cylinder

d)

Unvented cylinder

12.

Where should the primary open vent pipe in a double feed indirect hot water system terminate?

a)

Over the cold water storage cistern

b)

Over the feed and expansion cistern

c)

To the outside of the property

d)

In an expansion relief valve

13.

An unvented cylinder has a range of safety controls to prevent hot water reaching which temperature?

a)

85°C

b)

90°C

c)

95°C

d)

100°C

14.

Which system works in a similar way to an indirect cylinder, except in reverse?

a)

Unvented cylinder

b)

Thermal store unit

c)

Direct cylinder

d)

Combination unit

15.

What type of boiler provides instantaneous hot water to multiple outlets, as well as central heating, and is known as a hot water priority system?

a)

Condensing boiler

b)

Electric boiler

c)

Combination boiler

d)

Combination cylinder

16.

Name the hot water appliance which is commonly used to provide hot water to a remote basin/sink, which is located too far away from a DHW storage vessel.

a)

Gas or electric single point heater

b)

Smaller DHW storage vessel

c)

Combination cylinder

d)

Secondary circulator

17.

A plastic feed and expansion cistern must be:

a)

fully supported across its entire base

b)

supported on a single beam

c)

supported on at least two beams

d)

rested on a first-floor plasterboard ceiling

18.

Select the correct name for the pipework's labelled 1–4 in the diagram below.

a)

1 primary open vented pipe, 2 Primary cold feedpipe,

3 Secondary Open vent pipe,

4 Secondary cold feed pipe

b)

1 Secondary open vent pipe

2 Secondary cold feed pipe

3 Primary open vent pipe

4 Primary cold feed pipe

c)

1 Primary Return pipe

2 primary flow pipe

3 Secondary Return pipe

4 Secondary flow pipe

d)

1 Secondary Return pipe

2 Secondary Flow pipe

3 Primary return pipe

4 Primary flow pipe