LB I Commissioning Gas Installations Quiz

Total questions: 50

Worksheet time: 25mins

Name
Class
Date
1.

What is a legal requirement for gas installations before further use?

a)

They must be painted.

b)

They must be left in a safe condition.

c)

They must be used immediately.

d)

They must be stored in a warehouse.

2.

Which of the following is NOT part of the commissioning process for gas installations?

a)

Checking the tightness of the gas pipework.

b)

Inspecting the effectiveness of the flue.

c)

Painting the gas appliances.

d)

Ensuring safe functioning of controls.

3.

What should be checked to ensure the adequacy of ventilation for combustion air?

a)

The color of the gas pipework.

b)

The length of the flue.

c)

The provision of ventilation.

d)

The type of gas used.

4.

What is included in the relighting check for each appliance?

a)

Checking the color of the appliance.

b)

Checking burner pressure and/or gas rate.

c)

Checking the size of the appliance.

d)

Checking the brand of the appliance.

5.

What are the types of central heating boilers ?

a)

Open flued, Room sealed - natural draught, Room sealed - fan assisted - non-condensing, Room sealed - fan assisted - condensing

b)

Open flued, Closed flued, Room sealed - natural draught, Room sealed - fan assisted

c)

Open flued, Room sealed - natural draught, Room sealed - fan assisted - condensing, Closed flued

d)

Open flued, Closed flued, Room sealed - fan assisted - non-condensing, Room sealed - fan assisted - condensing

6.

According to the document, which British Standard covers the installation and maintenance of gas-fired boilers?

a)

BS 6798

b)

BS 5678

c)

BS 7896

d)

BS 8765

7.

What is one of the major limiting factors for installing boilers in kitchens ?

a)

Lack of space

b)

Getting the chimney routed to outside

c)

High installation cost

d)

Insufficient lighting

8.

What is the maximum input rating for open flued boilers to be fitted in a bedroom ?

a)

14kW

b)

12kW

c)

10kW

d)

16kW

9.

Which of the following is NOT a requirement for installing a boiler in a loft space according to BS 6798?

a)

Adequate illumination with fixed lighting

b)

A permanent means of access

c)

A guard rail around the boiler

d)

A water drainage system

10.

What is required for a boiler installed in an external cupboard according to BS 6798?

a)

A frost protection thermostat

b)

A solar panel

c)

A water filter

d)

A gas detector

11.

What must be ensured if a boiler is installed in an airing cupboard?

a)

The boiler must be painted

b)

The boiler must be separated by a non-combustible partition

c)

The boiler must be connected to a water supply

d)

The boiler must be installed on the floor

12.

What is the minimum distance required between a gas appliance and any combustible material in a compartment?

a)

50mm

b)

75mm

c)

100mm

d)

125mm

13.

What type of enclosure is required for external installations of boilers?

a)

A glass enclosure

b)

A weatherproof enclosure

c)

A metal enclosure

d)

A plastic enclosure

14.

What is one of the main advantages of condensing boilers compared to conventional boilers?

a)

They are cheaper to install.

b)

They are more efficient in recovering heat.

c)

They require less maintenance.

d)

They produce no condensation.

15.

What is a disadvantage of condensing boilers?

a)

They are more expensive to operate.

b)

They produce a plume of condensation.

c)

They require more space.

d)

They are less efficient in cold weather.

16.

What should be considered when positioning the terminal of a condensing boiler?

a)

It should be within 1 meter of a boundary wall.

b)

It should not be within 2.5m of a facing boundary.

c)

It should be above 3 meters from the ground.

d)

It should be directly under a window.

17.

What is a requirement for the condensate line when discharging into a stack pipe?

a)

It must be made of copper.

b)

It should include a 75mm trap.

c)

It should be insulated with fiberglass.

d)

It must be at least 1 meter long.

18.

What is the minimum internal diameter required for the pipe when condensate discharges into waste upstream of a sink, basin, bath, or shower?

a)

10mm

b)

19mm

c)

30mm

d)

50mm

19.

What is the minimum distance required for the visible air break at the plughole when condensate discharges into waste upstream?

a)

50mm

b)

75mm

c)

100mm

d)

125mm

20.

What is the minimum internal diameter required for the pipe when condensate drainage is downstream of a sink, basin, bath, or shower waste trap?

a)

10mm

b)

19mm

c)

30mm

d)

50mm

21.

What is the minimum distance required for the pipe to be installed externally when condensate drainage is downstream?

a)

100mm

b)

125mm

c)

150mm

d)

200mm

22.

What is the minimum internal diameter required for the pipe discharging condensate to external soil and vent stack?

a)

10mm

b)

19mm

c)

25mm

d)

30mm

23.

What is the minimum internal diameter required for the pipe discharging condensate into a drain, gully, or rainwater hopper?

a)

10mm

b)

19mm

c)

25mm

d)

30mm

24.

What is the minimum height required for the air break in the condensate discharge to external soil and vent stack?

a)

50mm

b)

75mm

c)

100mm

d)

125mm

25.

What is the minimum internal diameter required for the pipe connected to the boiler?

a)

10mm

b)

19mm

c)

25mm

d)

30mm

26.

At what angle should the pipe be cut for proper installation?

a)

30 degrees

b)

45 degrees

c)

60 degrees

d)

90 degrees

27.

What is the minimum internal diameter required for the pipe from the boiler in a condensing boiler system?

a)

19mm

b)

25mm

c)

30mm

d)

35mm

28.

What is the minimum hole dimension for the soakaway in a condensing boiler system?

a)

300mm deep x 400mm diameter

b)

400mm deep x 300mm diameter

c)

400mm deep x 500mm diameter

d)

500mm deep x 300mm diameter

29.

What is the minimum diameter required for the plastic tube in the condensing boiler system?

a)

50mm

b)

75mm

c)

100mm

d)

125mm

30.

What is the primary function of the Stirling Engine in a Micro Combined Heat and Power (CHP) unit?

a)

To provide cooling

b)

To generate electricity and heat

c)

To supply water

d)

To reduce noise

31.

What type of gas is used in the Stirling engine's cylinders?

a)

Oxygen

b)

Nitrogen or helium

c)

Carbon dioxide

d)

Hydrogen

32.

What is a requirement for the installation of a Stirling Engine Micro CHP unit?

a)

Solar panel integration

b)

Adequate gas and water supplies

c)

Wind turbine connection

d)

Geothermal support

33.

What is the primary benefit of a Stirling engine micro-cogeneration system?

a)

It operates more frequently than a conventional boiler.

b)

It provides electricity more efficiently than other systems.

c)

It runs for longer periods and cycles on and off less frequently.

d)

It requires no maintenance.

34.

What is required for operatives carrying out gas work on Stirling engine micro-cogeneration appliances?

a)

A degree in engineering.

b)

ACS assessments CCN1 + CENWAT + CPA1 or equivalent.

c)

A license from the local government.

d)

No specific qualifications are needed.

35.

What is a common issue with replacing old boilers with new ones of the same input?

a)

New boilers are always more efficient.

b)

New boilers are often over-sized, leading to inefficient operation.

c)

New boilers are cheaper to operate.

d)

New boilers require less maintenance.

36.

According to the document, what should be checked for signs of corrosion in a boiler?

a)

The boiler casing/combustion chamber.

b)

The electrical wiring.

c)

The water pipes.

d)

The thermostat.

37.

What should be checked and cleaned for condensing appliances during boiler servicing?

a)

Heat input

b)

Condense sump

c)

Operating pressure

d)

Flame picture

38.

What is a legal requirement when re-assembling a boiler?

a)

Check tubes from fan

b)

Clean condense sump

c)

Check heat input and operating pressure

d)

Adjust thermostats

39.

What is the main disadvantage of Thermostatic Radiator Valves (TRV's)?

a)

They are non-electrical

b)

They can close off the flow to each radiator

c)

They are fitted to individual radiators

d)

They respond to room temperature

40.

What is the purpose of the S Plan in central heating systems?

a)

To use a single motorised valve

b)

To split the feed to the cylinder and radiators

c)

To increase boiler pressure

d)

To reduce thermostat usage

41.

What is one way to avoid inadequate flow rate through a boiler?

a)

Increase the water temperature

b)

Fit a by-pass across the flow and return pipes

c)

Use a larger boiler

d)

Decrease the water pressure

42.

What do eTRVs use to adjust the temperature remotely?

a)

Manual dials

b)

Electronic actuator

c)

Mechanical switches

d)

Pressure sensors

43.

How many times a day can conventional heating system programmers typically turn the heating on and off?

a)

1 or 2 times

b)

2, 4, or 6 times

c)

2, 4, or 8 times

d)

2, 4, or 10 times

44.

Which of the following is NOT a Boiler Plus energy saving option?

a)

Weather compensation

b)

Load compensation

c)

Smart thermostat with automation

d)

Increased water pressure

45.

What does load compensation adjust in a heating system?

a)

Boiler size

b)

Radiator circulating temperature

c)

Water pressure

d)

Gas flow rate

46.

What is a possible cause for a pilot not lighting in a central heating boiler?

a)

Thermocouple burnt out

b)

Defective multi-function valve

c)

Condense pipe frozen

d)

Fan bearings are worn

47.

Which of the following is a symptom of a defective spark generator in a central heating boiler?

a)

Pilot not holding

b)

Main burner not lighting

c)

Pilot not lighting

d)

Noisy fan

48.

What could cause a flame rectification defect in a central heating boiler?

a)

Fan running but not closing

b)

Sensing electrode not in flame

c)

Heat exchanger scaled up

d)

Burner over-gassed

49.

What is a possible cause for a noisy fan in a central heating boiler?

a)

Fan bearings are worn and noisy

b)

Reverse polarity on electric supply

c)

Defective pcb/control box

d)

Spark jumping to wrong place

50.

What might cause the main burner not to light in a central heating boiler?

a)

Pilot flame too short

b)

Fan impeller is dirty

c)

No power supply to gas valve

d)

Heat exchanger full of system debris