wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Gas Meter Installation Quiz

Total questions: 37

Worksheet time: 19mins

Name
Class
Date
1.

What is a key consideration when installing domestic gas meters?

a)

The meter should be painted a bright color.

b)

The meter should be installed in a basement.

c)

The meter should be secure and cannot move.

d)

The meter should be installed near a window.

2.

Which part of BS 6400 covers low pressure installations?

a)

Part 1

b)

Part 2

c)

Part 3

d)

Part 4

3.

What is the maximum capacity for BS 6400 pt1-3 inc meters?

a)

5m³/hr

b)

6m³/hr

c)

7m³/hr

d)

8m³/hr

4.

What type of meter housing is designed to blend into the surroundings?

a)

Surface mounted

b)

Semi-concealed

c)

Built-in meter boxes

d)

Medium pressure (MP) installations

5.

Where should a gas meter be fitted inside a building?

a)

As far as possible from the incoming supply pipe

b)

Close to where the incoming supply pipe enters the building

c)

In the basement

d)

Near the electrical wiring and switchgear

6.

Under what conditions should a domestic gas meter not be fitted?

a)

Where food is stored

b)

In a well-ventilated area

c)

In a dry environment

d)

Away from electrical wiring

7.

What is required for a gas meter installation in a building with two or more storeys above ground floor?

a)

It can be located under the stairs

b)

It should not be located under the stairs if the stairway forms the only means of escape

c)

It must be installed in the basement

d)

It should be placed near the main entrance

8.

What should be done if there is no option other than to fit the meter under stairs?

a)

The meter should be fire resistant

b)

The meter should be painted

c)

The meter should be left exposed

d)

The meter should be placed on the floor

9.

What is a "pliable connection" in the context of gas meter installations?

a)

A rigid pipe

b)

A semi-rigid pipe

c)

A flexible hose

d)

A metal chain

10.

What is the purpose of a semi-rigid connection in gas meter installations?

a)

To allow for continual flexing

b)

To connect multiple meters

c)

To fit between the emergency control valve and the meter inlet

d)

To replace flexible connections

11.

What must be confirmed about the meter installation before proceeding?

a)

It is suitable for the outlet pressure at the ECV

b)

It is painted in a specific color

c)

It is installed by a certified electrician

d)

It is connected to multiple gas lines

12.

What is the minimum flow rate required for the regulator during commissioning?

a)

5.0 m³/h

b)

3.5 m³/h

c)

2.0 m³/h

d)

4.0 m³/h

13.

What should be included on the label of the meter?

a)

The installation date

b)

The user procedure for a gas leak

c)

The manufacturer's logo

d)

The meter's color code

14.

What is the purpose of protective equipotential bonding in gas installations?

a)

To enhance the aesthetic of the installation

b)

To ensure the pipework is electrically safe

c)

To increase the gas flow rate

d)

To reduce installation costs

15.

What is the required size for the protective equipotential bonding conductor according to BS 7671/IET Regulations?

a)

5mm²

b)

8mm²

c)

10mm²

d)

12mm²

16.

What is the maximum pressure drop allowed when a domestic gas meter installation is operating at maximum capacity?

a)

2 mbar

b)

3 mbar

c)

4 mbar

d)

5 mbar

17.

What should be done to the incoming supply pipe when a gas meter is permanently removed?

a)

Leave it open

b)

Cap it off with an appropriate fitting and test for leaks

c)

Connect it to another meter

d)

Ignore it

18.

What is the maximum throughput for a G10 gas meter in m³/h?

a)

6 m³/h

b)

10 m³/h

c)

16 m³/h

d)

20 m³/h

19.

What must be fitted if a meter is to be positioned more than 2m from the ECV?

a)

A new meter

b)

An AECV

c)

A permanent cross bond

d)

A temporary fitting

20.

What is the purpose of sealing the meter box in gas installations?

a)

To prevent gas from escaping into the building

b)

To improve the aesthetic appearance

c)

To increase the gas pressure

d)

To reduce the cost of installation

21.

Why should new washers always be used when meters are reconnected?

a)

To ensure a tight seal and prevent leaks

b)

To save on costs

c)

To improve the appearance of the meter

d)

To increase gas flow

22.

What is the diversity factor for combination boilers ?

a)

1

b)

0.8

c)

0.6

d)

0.4

23.

Why might a diversity factor be applied when calculating gas meter capacity?

a)

To account for the likelihood that not all appliances will operate at full capacity simultaneously

b)

To increase the overall gas supply

c)

To reduce the number of appliances

d)

To simplify the installation process

24.

What is the calculated load (kW) for a combination boiler with a heat input of 38 kW and a diversity factor of 0.8? (The formula to calculate diversified load (also referred to as calculated load or design load) is:

Calculated Load (kW) = Heat Input (kW) × Diversity Factor)

a)

30.4 kW

b)

28.4 kW

c)

32.4 kW

d)

34.4 kW

25.

What is the typical operating pressure range for Medium Pressure (MP) meter installations?

a)

Above 75mbar and up to 2 bar

b)

Above 50mbar and up to 1.5 bar

c)

Above 100mbar and up to 3 bar

d)

Above 60mbar and up to 1 bar

26.

What is the range of operating pressure at the inlet of the meter for flows in the range of 0.5m³/h to the maximum capacity?

a)

15-20 mbar

b)

19-23 mbar

c)

25-30 mbar

d)

10-15 mbar

27.

What should the regulator lock-up pressure at the outlet of the meter not exceed at Maximum Operating Pressure (MOP)?

a)

30 mbar

b)

27.5 mbar

c)

25 mbar

d)

20 mbar

28.

According to the document, what is the minimum relief valve discharge capacity for regulators to PRS 29/E?

a)

1.0 m³/h

b)

1.5 m³/h

c)

1.75 m³/h

d)

2.0 m³/h

29.

What is the minimum proximity distance from a meter box to a building opening for a relief valve discharge capacity of 0 ≤ 1 m³/h?

a)

150 mm

b)

180 mm

c)

200 mm

d)

220 mm

30.

What is the minimum distance the vent pipe needs to be fixed from the outside of the meter box?

a)

10mm

b)

25mm

c)

50mm

d)

100mm

31.

What is the required internal diameter of any vent pipe?

a)

Less than 4mm

b)

Less than 6mm

c)

Less than 8mm

d)

Less than 10mm

32.

Who is authorized to break the seal on a primary meter regulator?

a)

Any person

b)

The gas transporter

c)

A person authorized to act on the transporter’s behalf

d)

The property owner

33.

What is the purpose of positioning the flame trap on the purge hose in a suitable safe location?

a)

To prevent gas leaks

b)

To ensure proper pressure

c)

To avoid fire hazards

d)

To maintain temperature

34.

How long should the re-set lever be held against the spring pressure during the test?

a)

For at least 1 minute

b)

For at least 5 seconds

c)

For at least 10 seconds

d)

For at least 30 seconds

35.

What should be done if the MIV is passing gas during the 1 min let-by test?

a)

Replace the entire system

b)

Depressurize the ECV

c)

Replace the complete regulator assembly and re-test

d)

Increase the pressure

36.

What is the maximum pressure allowed on the regulator during the purge?

a)

22.5 mbar

b)

27.5 mbar

c)

30 mbar

d)

25 mbar

37.

What should be done if the relief valve operates outside the pressure range of 3.5 ± 3.5 mbar?

a)

Increase the pressure

b)

Replace the relief valve

c)

Replace the complete regulator assembly and re-test

d)

Depressurize the system