wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

g11- Planning and Installing Systems Quiz

Total questions: 9

Worksheet time: 5mins

Name
Class
Date
1.

What are the four alternatives that could ease the process of implementing/installing a new system?

a)

Direct changeover

b)

Parallel running

c)

Pilot running

d)

Phased conversion

2.

What is the advantage of direct changeover?

a)

Minimal time and effort, new system is available immediately

b)

If the new system fails, the old systems runs a backup

c)

All features are fully trialled

d)

Allows people to get used to the new system

3.

What is a disadvantage of parallel running?

a)

Running two systems is costly in terms of time and money

b)

If the new system fails, there is no fall back

c)

Only a small part of the organisation suffers

d)

Training of staff can be done in stages

4.

What is the method of pilot running?

a)

The new system is stopped and new system is started

b)

The new system is started, but the old system is kept running alongside it

c)

The new system is piloted with a small subset of the organisation

d)

The new system is introduced in phases

5.

What is a disadvantage of phased conversion?

a)

If the new system fails, there is no fall back for that part of the system

b)

Running two systems is costly in terms of time and money

c)

Only part of the data will be at the destination

d)

The rules that are set up by programmers can be different

6.

What can cause problems in data migration?

a)

Incompatible file formats

b)

Incomplete data transfers

c)

Validation rules

d)

All of the above

7.

What is the importance of testing in a computerized system?

a)

It ensures that the system works as expected

b)

It reduces productivity

c)

It increases end user dissatisfaction

d)

It is not important

8.

What is the difference between alpha and beta testing?

a)

Alpha testing is performed by internal employees, beta testing by clients

b)

Alpha testing is performed at client location, beta testing at developer's site

c)

Alpha testing is less important than beta testing

d)

There is no difference

9.

What does black-box testing treat software as?

a)

A black-box without knowing its internals

b)

A white-box with full knowledge of its internals

c)

A system that is not tested

d)

An outdated software