FDRP2

Total questions: 20

Worksheet time: 20mins

Name
Class
Date
1.

When initially discussing the work involved in fault finding with the client, an area of consideration should be?

a)

access arrangements

b)

availability of parts required

c)

total cost

d)

materials required

2.

A fault has been reported on an unfamiliar machine. Which information would be of most use in fault finding?

a)

The Electrical Installation Certificate

b)

Maintenance records

c)

The workers using the equipment when it went wrong

d)

The manufacturers instructions

3.

When preparing to work on a three-phase pillar drill, the number of tests required to prove isolation has been correctly completed is?

a)

3

b)

9

c)

10

d)

12

4.

Which of the following information is not required when diagnosing a fault on a circuit that has no previous certificates in place?

a)

The existing Electrical Installation Certificate

b)

Events leading up to the fault

c)

Maintenance records

d)

The manufacturers instructions

5.

A component has been identified as the cause of the fault but is not a stock item and requires ordering. What information should be given to the client?

a)

The supplier’s phone number to chase delivery

b)

The expected delivery/repair date

c)

The part number of the item ordered

d)

The way to bypass the faulty part, although safety will be impaired

6.

An upgraded piece of equipment has been installed but repeatedly after 25 minutes of running, it trips out the circuit breaker. What is the most likely fault?

a)

A short circuit

b)

An overload

c)

An undervoltage

d)

A fault to earth

7.

A customer has had new USB sockets fitted in the kitchen but can now hear a crackling noise. What is the most likely cause?

a)

An insulation resistance fault between neutral and earth

b)

An overvoltage outside the specification of the socket installed

c)

A loose connection

d)

Overloading the socket

8.

An area in a factory has been subjected to a flood and you are working with two other colleagues to replace damaged equipment. To ensure the supply is safely isolated, which of the following should you do?

a)

Isolate the supply and keep the key yourself, as you are the senior electrician on site

b)

Isolate the supply and put the key somewhere you can all access it in case any of you need to re-energise the supply

c)

Fit a lock with multiple keys so you can all re-energise the supply

d)

Fit a multi-lock adaptor and all fit individual locks and retain your own keys

9.

After diagnosing a fault as a damaged length of cable between two socket outlets, a new length of cable is installed. What documentation should be completed?

a)

A minor works certificate

b)

An Electrical Installation Certificate

c)

A condition report

d)

A schedule of test results

10.

An RCD is tripping out. What is the cause of the fault?

a)

A fault to earth

b)

A short circuit between line and neutral

c)

An overload of the circuit

d)

Undervoltage

11.

A test has been completed on a circuit that has tripped out the circuit breaker, and a reading was found of 0.7MΩ between line and neutral. What is the most likely cause of this reading?

a)

A short circuit between the conductors

b)

A wire has become disconnected for an accessory

c)

Something is still connected, such as a neon indicator

d)

Nothing is wrong – 0.7MΩ is usual and acceptable

12.

The test instruments used for fault diagnosis should be?

a)

a multi-meter that allows a range of tests to be completed

b)

approved by the client as suitable to be used on their installation

c)

less than 12 months old

d)

calibrated and checked prior to use

13.

The client informs you that the supply to a piece of equipment cannot be isolated as it will affect other machinery and you should work on it live. What should you do?

a)

Report the client to the HSE for suggesting an unsafe work procedure

b)

Make arrangements for isolating the supply at a mutually convenient time, such as out-of-hours

c)

Work live anyway

d)

Tell the client to find someone else to work on the equipment

14.

A client has had a relative fit a new light fitting, purchased from the local DIY store. However, every time the light is switched on, the circuit trips out. What is the most likely cause?

a)

The connections have been incorrectly made and a short circuit occurs when the switch is turned on

b)

The light fitting is faulty

c)

The circuit is now overloaded

d)

The light fitting is not designed for a domestic installation

15.

What is the final test to be completed after rectification of a fault?

a)

Insulation resistance

b)

RCD test

c)

Functional test

d)

Circuit breaker operating current test

16.

An earth fault loop impedance test has been completed on a circuit and the reading is found to be 2.34Ω. GN3 tells you the maximum reading should be 1.8Ω. What is the implication of this?

a)

The equipment will not operate correctly

b)

The equipment will operate but the manufacturer’s warranty is now invalid

c)

The equipment will intermittently trip out

d)

The protective device will not operate quickly enough to comply with BS 7671 in the event of an earth fault

17.

When lone working, others should be aware of your location, the time the activity is likely to take and what else?

a)

Ensure the bill for the client is correct for the time taken

b)

Enable the office to plan your next job knowing where you are and when you will finish

c)

Ensure your health and safety and check up on you

d)

Make sure you haven’t gone home

18.

An item of equipment you have isolated has a notice stating also supplied from a UPS. UPS stands for?

a)

untested portable supply

b)

uninterruptible power supply

c)

unified power supply

d)

underground power supply

19.

An RCD protecting sockets in a computer suite intermittently operates when busy. What is a possible cause?

a)

A cumulative effect of earth leakage from multiple PCs

b)

An intermittent fault on one PC

c)

An overload when too many PCs are turned on

d)

Inrush current due to the power supplies in the PCs turning on together

20.

When communicating with a client, information should always be

a)

written

b)

verbal

c)

technical

d)

clear and courteous