EIM Q2 Review

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

What is the primary reason for installing pull boxes in conduit runs?

a)

A. To connect conduits of different diameters

b)

B. To make it easier to pull wires through the conduits

c)

C. To protect the conduits from damage

d)

D. To reduce the length of the conduit

2.

What tool is most commonly used to ensure that conduits are properly aligned along walls and ceilings?

a)

A. Cable puller

b)

B. Level

c)

C. Multimeter

d)

D. Pipe cutter

3.

According to standard electrical codes, what is the maximum number of 90-degree bends allowed in a single conduit run without a pull box?

a)

A. One

b)

B. Two

c)

C. Three

d)

D. Four

4.

What is the primary purpose of the service disconnect switch?

a)

A. To isolate the entire electrical system for maintenance or emergencies

b)

B. To monitor the electricity usage

c)

C. To prevent power surges

d)

D. To regulate the current entering the house

5.

Which component must be installed outside the house for the utility company to measure electricity usage?

a)

A. Grounding electrode

b)

B. Main breaker panel

c)

C. Meter base

d)

D. Service disconnect switch

6.

What is the primary function of grounding in a service entrance installation?

a)

A. To give excess electrical charges a safe place to go

b)

B. To prevent corrosion of the wires

c)

C. To secure the conduits in place

d)

D. To support the weight of the conductors

7.

Which of the following must be considered when running service entrance conductors?

a)

A. Ensuring proper clearances from windows and doors

b)

B. Running wires directly on the ground without conduits

c)

C. Selecting the wire color to match the house exterior

d)

D. Using uninsulated wires for easier installation

8.

What is a key advantage of using PVC conduits in residential installations?

a)

A. High heat resistance

b)

B. Corrosion resistance and lightweight design

c)

C. Ability to withstand mechanical impacts

d)

D. Increased conductivity for wires

9.

Why are non-metallic conduits are not suited for outdoor installations exposed to direct sunlight?

a)

A. Non-metallic conduits cannot conduct electricity efficiently, making them unsuitable for outdoor installations requiring grounding.

b)

B. Non-metallic conduits deteriorate when exposed to ultraviolet radiation, leading to brittleness and cracking, which compromises their protective function over time.

c)

C. Non-metallic conduits fade in color and become less visually appealing when exposed to direct sunlight.

d)

D. Non-metallic conduits retain excessive heat, which can cause internal wiring to overheat and fail in outdoor installations.

10.

From the center mark of an elbow bend, there should be marks in the left and right side to determine which area should the heat be applied to perform the bend. How much distance should you move from the left and right side of the center mark?

a)

A. 100 MM

b)

B. 150 MM

c)

C. 200 MM

d)

D. 250 MM

11.

What is the primary advantage of using Rigid Metal Conduit (RMC) in outdoor installations?

a)

A. It is lightweight and flexible

b)

B. It offers high resistance to mechanical damage

c)

C. It is less expensive than other metallic conduits

d)

D. It eliminates the need for grounding

12.

Which metallic conduit is most commonly used for indoor wiring in walls and ceilings due to its lightweight design?

a)

A. Electrical Metallic Tubing (EMT)

b)

B. Flexible Metal Conduit (FMC)

c)

C. Intermediate Metal Conduit (IMC)

d)

D. Rigid Metal Conduit (RMC)

13.

What is a key difference between EMT and RMC?

a)

A. EMT is light and easier to install, while RMC is heavier and more durable

b)

B. EMT is requiring a separate grounding wire, while RMC does not

c)

C. RMC is only used for indoor applications while EMT is used for both indoor and outdoor

d)

D. RMC is threaded, while EMT is unthreaded

14.

What is a code requirement when installing metallic conduits?

a)

A. Metallic conduits must all be painted to prevent rust

b)

B. Metallic conduits must be securely bonded to the grounding system

c)

C. Metallic conduits must be insulated to prevent electric shock

d)

D. Metallic conduits must only be used in outdoor installations

15.

What is the first step when preparing to create an elbow bend in a rigid non-metallic conduit?

a)

Cut the conduit into smaller sections

b)

Heat the conduit immediately

c)

Mark the conduit at the point where the bend will begin

d)

Secure the conduit in place

16.

What is the recommended action after bending the conduit to the desired angle?

a)

Apply additional heat to smooth the bend

b)

Hold it in position until it cools and hardens

c)

Immediately secure it with clamps

d)

Place it in water to accelerate hardening

17.

Which of the following is crucial to check after completing the bend?

a)

The bend exceeds 120 degrees for flexibility

b)

The bend has a smooth and even curve without kinks

c)

The conduit is painted to prevent damage

d)

The conduit is thicker at the bend

18.

Which type of bend is used to cross over an object while keeping the conduit aligned?

a)

Elbow

b)

Offset

c)

Three-point Saddle

d)

U-bend

19.

When designing an electrical system with conduits running across uneven surfaces and sharp corners, how would you strategically use conduit fittings to maintain safety and compliance?

a)

Combine bushings to protect wires and elbows for directional changes

b)

Focus on using locknuts exclusively to secure conduits

c)

Use couplings to navigate uneven surfaces and elbows for sharp corners

d)

Utilize a mix of connectors, elbows, and bushings for a comprehensive solution

20.

What is the primary purpose of wireways in electrical installations?

a)

To distribute high-current power

b)

To enclose and protect wires with easy access for maintenance

c)

To provide structural support for cables

d)

To route cables under raised floors

21.

How would you integrate cable bridges and cable trays in a single installation to optimize wire management in a large manufacturing plant?

a)

Use cable bridges for short spans and cable trays for concealed wiring

b)

Combine cable trays for supporting cables along walls and cable bridges for long overhead spans

c)

Install cable bridges for vibration resistance and cable trays for aesthetic purposes

d)

Use cable trays for high-current distribution and cable bridges for low-voltage wires

22.

In a high-rise commercial building with diverse power and data requirements, which raceways would you choose to ensure both system flexibility and safety, and why?

a)

Bus ducts and cable trays for high-current capacity and cable organization

b)

Cable bridges and wireways for overhead wiring and maintenance access

c)

Floor-mounted raceways and cable trays for underfloor and overhead pathways

d)

Wireways and floor-mounted raceways to provide accessibility and hidden wiring solutions

23.

What kind of box is used to house a special purpose outlet?

a)

Metallic junction box

b)

Metallic utility box

c)

Non-metallic junction box

d)

Non-metallic utility box

24.

What is the key difference between a special-purpose outlet and a convenience outlet?

a)

A convenience outlet is for outdoor use only, while a special-purpose outlet is for indoor use only.

b)

A convenience outlet is larger in size compared to a special-purpose outlet.

c)

A special-purpose outlet is designed for specific equipment, while convenience outlet is for general use.

d)

A special-purpose outlet is for general use, while a convenience outlet is for specific appliances.

25.

You are assigned to do the lay outing of the different electrical devices given by the figure above. How would you create an efficient process to lessen the excess waste produced during the lay out process?

a)

Estimate material needs and purchase extra supplies for unforeseen errors.

b)

Follow the layout plan, measure accurately, and minimize cutting errors.

c)

Rely on trial and error to fit the materials as the layout progresses.

d)

Use pre-cut materials regardless of the specific layout requirements.