wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Construction info & data Quiz PPT 3

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

What is a common feature of both work order management systems and CMMS?

a)

They both focus on sales

b)

They both use dashboards

c)

They both create new software

d)

They both manage human resources

2.

What should a full redesign of the replacement system ensure?

a)

It is cheaper than the original

b)

It meets current British Standards

c)

It uses outdated technology

d)

It is smaller in size

3.

Which factor is NOT mentioned as a reason for system replacement?

a)

Non-availability of spare parts

b)

Building grants

c)

Increase in building height

d)

Investment in buildings

4.

What should be considered during the redesign of a replacement system?

a)

The color of the building

b)

Existing data collected on the building

c)

The number of windows

d)

The type of flooring

5.

When are building services engineering systems truly tested against client expectations?

a)

During the design phase

b)

After handover and in operation

c)

Before construction begins

d)

During the initial planning stage

6.

Why is it important that buildings are not handed over in a poor state of operational readiness?

a)

It increases construction costs

b)

It can lead to legal disputes

c)

It can be a risk due to programme delays

d)

It affects the building's aesthetic appeal

7.

What is the main goal of establishing a baseline in POE?

a)

To make comparisons after project completion

b)

To design the building

c)

To calculate costs

d)

To hire contractors

8.

Which type of data can explain the reasons behind the numbers?

a)

Qualitative data

b)

Quantitative data

c)

Numerical data

d)

Statistical data

9.

What is the role of 'Performance monitoring' in the building services engineering process?

a)

To assess the building's performance after occupancy

b)

To design the building layout

c)

To construct the building

d)

To demolish the building

10.

Which stage involves 'Decommissioning or demolition' in the building services engineering process?

a)

Building occupancy

b)

Building construction

c)

Adapting final design

d)

Concept design

11.

What is an advantage of occupant consultation questionnaires?

a)

Requires few staff resources

b)

Obtains broad-based opinion

c)

Can be time consuming

d)

Viewpoint can be biased

12.

Which method obtains detailed data?

a)

Observations

b)

Occupant consultation interviews

c)

Occupant consultation questionnaires

d)

Energy walkabouts

13.

What is a disadvantage of using audits in POE?

a)

Takes minimal management time

b)

Not always easy to locate

c)

Data is already collated

d)

Issues can be explored by the group

14.

Which method in POE can involve fewer staff?

a)

Audits

b)

Workshops/discussions

c)

Organisational performance measures

d)

Calibration

15.

Which method in POE requires high-level data?

a)

Audits

b)

Workshops/discussions

c)

Organisational performance measures

d)

Calibration