NEW
Font size
WorksheetsProject Flexibility, Illustration of Exam 2022
Total questions: 10
Worksheet time: 5mins
Project success factors, as described in project management literature
Indicator we use to measure project success after project
Factors that should be in place to secure project success
Time, cost, quality
none of the above
Definitiion of uncertainty, based on Galbraith
Lack of information
Probability multiplied by consequences
Difference between available and needed information
Known unknowns
Basic idea of bonded rationality
to optimize project value
maximize shareholder value
emerging strategies
Satisficing decisions
Mintzberg intended and realized strategies
Realized = Deliberate + emergent strategy
Intended = Realized strategy
Deliverable strategy = realized - intended strategy
none of the above
"School book" project owner responsibilities
Time, cost, quality
Cost and benefits
Project business case
All of the above
Flexibility in the process
Sequence of decisions in a project
Characteristics of the project delivery
Project supply chain management
Ease of rebuilding a construction
Purpose of project models related to flexibility
to minimize flexiblity
Use flexibility in early phases, and to manage it in later phases
secure flexibility in a sustainability perspective with special focus on climate
none of the above
Approach of high flexibility in product and low flexiblity in process
Robust concept
Flexibility maximization
no flexibility preparations
Incremental decisions
Meaning of the "lagom"
Pragmatic approach to problem solving
Maximize or minimize, depending on situation
Reduce conflicts
Optimal in a pragmatic way
Example of service prodiving users, as used by Olsson et al. 2021
School teachers
School pupils
Parents of school pupils
School project manager
