WorksheetsSDLC Models
Total questions: 15
Worksheet time: 14mins
Which SDLC model is best suited for projects with well-defined requirements that are unlikely to change?
Agile
Waterfall
Spiral
Incremental
In the Agile methodology, which of the following is used to plan and track work progress?
Gantt Charts
Burndown Charts
Entity-Relationship Diagrams
Use Case Diagrams
The Spiral Model combines features of which two SDLC models?
Waterfall and Agile
Incremental and Waterfall
Waterfall and Iterative
Iterative and Agile
What is the main focus of the "Testing" phase in SDLC?
Gathering requirements
Ensuring the system works as expected
Writing the code for the software
Installing the software on the client’s system
Which SDLC model emphasizes risk assessment during development?
V-Model
Spiral Model
Agile
Prototype Model
The V-Model is also known as the Verification and Validation Model. (True/False)
(a)
The Agile model follows a strict sequential process without iteration. (True/False)
(a)
In the Waterfall model, once a phase is completed, it is difficult to go back to the previous phase. (True/False)
(a)
The Prototype Model is used when detailed requirements are not initially available. (True/False)
(a)
Incremental development delivers the entire software product at once. (True/False)
(a)
The (a) model focuses on iterative delivery of small functional modules.
In Agile, a unit of work is often referred to as a (a) .
The (a) phase in SDLC involves fixing defects and adding new features after deployment.
The (a) model emphasizes creating a working model of the system before the actual development begins.
In the Spiral Model, each loop is called a (a) .
