1.

When are lines considered de energized

a)

When they are disconnected

b)

When they are tested

c)

When they are disconnected, tested, and observed

d)

When they are disconnected, tested, and properly grounded

2.

How much amperage does it take to burn the skin and organs

a)

1 amp

b)

1-5 milliamps

c)

16-100 milliamps

d)

100-700 milliamps

3.

A piece of equipment that has been disconnected from all normal sources of energy

a)

Switch

b)

Clearance

c)

Open point

d)

Breaker

4.

What is the first objective of clearing lines

a)

Ensure the safety of all employees and the public

b)

Minimize negative impact on the electrical system

c)

Minimize the number of customers who will be out of service

d)

Protect switches

5.

What is the first step of a clearance procedure

a)

Establish and issue clearance

b)

Request clearance in writing

c)

Create clearance plan and confirm detail

d)

Return system to neutral

6.

What is the last step of a clearance procedure

a)

Establish and issue clearance

b)

Request clearance in writing

c)

Create clearance plan and confirm detai

d)

Return system to neutral

7.

OSHA requires all devices that are used as a clearance point to be ______ when in use

a)

Open

b)

Closed

c)

Locked out

d)

Tagged out

8.

What occurs when a nearby energy source such as a transmission line electrifies a disconnected lines

a)

Convection

b)

Induced voltage

c)

Radiated voltage

d)

Forced voltage

9.

Equipment designed to store voltage may retain a charge long after being disconnected

a)

Induced voltage

b)

Convection

c)

Capacitance

d)

Static charge

10.

OSHA requires waiting how long before installing grounds on a disconnected capacitor

a)

10 minutes

b)

15 minutes

c)

5 minutes

d)

You don’t need to wait

11.

Introduces enormously high levels of voltage into a work site

a)

Static charge

b)

Lighting up to 100million volts

c)

Lighting up to 500 million volts

d)

Capacitance

12.

Warm winds blowing across the surface of conductors can create what?

a)

Capacitance

b)

Lighting

c)

Static charge

d)

Convection

13.

When current travels backwards through a conductor

a)

Static charge

b)

Back feed

c)

Capacitance

d)

Induction

14.

What is the first step in the grounding process

a)

Disconnect

b)

Test

c)

Identify

d)

Ground

15.

The line is not officially de-energized until

a)

Your Forman says it is

b)

Your safety director says it is

c)

It is disconnected

d)

You test and ground it

16.

Screw type ground rod placed deep into the earth to provide an effective path for current to fl

a)

Guy wire

b)

Ground grid

c)

Temporary ground rod

d)

System neutral

17.

This conductor is installed on transmission lines above the phase conductors for the purpose of intercepting lighting

a)

System neutral

b)

Lighting wire

c)

Static/shield wires

d)

Ground/shield wires

18.

Protective grounds act as a direct low-resistance path to ground in order to?

a)

Minimize the time it takes to trip the circuit

b)

Protect the conductor

c)

Define the resistan

d)

Quantify the path to ground

19.

Protective grounds act as a direct low-resistance path to ground in order to?

a)

Protect the fault current

b)

Protect the conductor

c)

Define the resistan

d)

Limit the current flow and voltage drop across the line workers bo

20.

—————- provides, at the structure that is being worked on, a low resistance short circuited connection to ground source

a)

Bracket ground

b)

Equipotential zone

c)

System neutral

d)

B phase

21.

Used primarily to trip the line’s protection devices as quickly as possible

a)

Bracket grounding

b)

Equipotential zone

c)

System neutral

d)

B phase

22.

————must be installed to protect each employee

a)

Equipotential zone

b)

Cluster bracket

c)

Bracket grounding

d)

Protective grounds

23.

Connect to ground source first, then to conductor or equipment. Remove from conductor first, then remove from neutral

a)

Golden rule of grounding

b)

Law of grounding

c)

Phase to phase fir

d)

Bracket grounds

24.

Ground cables should be

a)

Free of broken strands

b)

Eye screw of the ground clamp should be bent

c)

Should have cracks and warping

d)

Should have some free play

25.

What/who can determine the resistance of the clamps and cable

a)

Visual inspection is adequate

b)

Only testing

c)

Your safety supervisor

d)

Your foreman

26.

Any equipment that was subject to fault current…..

a)

Must be removed from use immediately for testing

b)

Must be thrown out

c)

Inspected and returned to service

d)

Will burn up

27.

Grounding plan: creation of EPZ, grounding cable size, grounding cable placement, and__________

a)

Test

b)

Identify

c)

Fault current

d)

Clean

28.

Uninterrupted flow of current

a)

Resistance

b)

Back feed

c)

Continuity

d)

Convection

29.

Conductive mats that help provide an EPZ between the work surface and the equipment

a)

Grounding spike clamp

b)

Dead end cap

c)

Feed through bushing

d)

EPZ Mat

30.

The first step in the grounding process on an underground system

a)

Test voltage

b)

Review circuit maps and work order prints

c)

Install protective grounds

d)

Disconnect the cables to be cleared