wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

PEISS

Total questions: 15

Worksheet time: 17mins

Name
Class
Date
1.

Select the top two answers from the options provided that are most relevant to the statement.

“No permits and/or clearances issued by other National Government Agencies and Local  Government Units shall be required in the processing of ECC or CNC applications.”

a)

DENR Memo Circular No. 2007-08

b)

DAO 2003-30

c)

Issued November 2, 2002

d)

Issued on July 13, 2007

2.

Select the top two answers from the options provided that are most relevant to the statement.

The Act governs all mining operations and related rights in the Philippines, specifically exploration, development, and utilization of natural resources conservation through a partnership of the government and private sector.

a)

Philippine Fisheries Code

b)

RA 7942

c)

RA 7586

d)

Philippine Mining Act

3.

Select the top two answers from the options provided that are most relevant to the statement.

An Act providing for the establishment and management of national integrated protected areas system, defining its scope and coverage, and for other purposes.

a)

RA 7586

b)

RA 8550

c)

National Integrated Protected Areas System

d)

Philippine Fisheries Code

4.

Select the top two answers from the options provided that are most relevant to the statement.

Environment Critical projects

a)

Category B

b)

Category A

c)

Secure ECC

d)

Secure CNC

5.

Select the top two answers from the options provided that are most relevant to the statement.

A process a proponent undertakes before an ECC is issued

a)

Environmental Impact Assessment

b)

Planning tool

c)

Technical basis

d)

Project Description Report

6.

Select the top two answers from the options provided that are most relevant to the statement.

Projects that are unlikely to cause adverse environmental impacts

a)

Secure ECC

b)

Category C

c)

Category D

d)

Secure CNC

7.

Select the top two answers from the options provided that are most relevant to the statement.

Defining the scope of the EIS System

a)

PD 1586

b)

Presidential Proclamation No. 2146

c)

Establishing an Environmental Impact Statement System

d)

ECA/ECP

8.

Select the top two answers from the options provided that are most relevant to the statement.

Projects located in Environmentally Critical Areas

a)

Category B

b)

Category C

c)

Secure ECC

d)

Secure CNC

9.

Select the top two answers from the options provided that are most relevant to the statement.

All persons, partnerships or corporations are required to secure an. Environmental Compliance Certificate (ECC) before undertaking

a)

DAO 2003-30

b)

Establishing an Environmental Impact Statement System

c)

PD 1586

d)

All small-scale projects/undertakings

10.

Select the top two answers from the options provided that are most relevant to the statement.

Projects enhancing environmental quality or address existing environmental problems

a)

Category D

b)

Category C

c)

Secure CNC

d)

Secure ECC

11.

Select the top two answers from the options provided that are most relevant to the statement.

Implementing Rules and Regulations (IRR) for the Philippine Environmental Impact  Statement (EIS) System

a)

DAO 2003-30

b)

DAO 2001-08

c)

issued on July 13, 2007

d)

Issued November 2, 2002

12.

Select the top two answers from the options provided that are most relevant to the statement.

Contains provision for the management and conservation of fisheries and aquaculture in the Philippines and the reconstitution or establishment of fisheries institutions both at the national and local level.

a)

Philippine Fisheries Code

b)

RA 7942

c)

RA 8550

d)

Philippine Marine Habitat Protection Act

13.

Select the top two answers from the options provided that are most relevant to the statement.

A decision document issued after thorough review of the EIA Report, certifying  that the proponent has complied with all the requirements of the EIS system

a)

Certificate of Non-Coverage

b)

Environmental Compliance Certificate

c)

Not a permit

d)

Permit

14.

Select the top two answers from the options provided that are most relevant to the statement.

Certain social acceptability determination must be devolved to the local government units concerned;

Issues that are within the preview or mandates of the government agencies shall be resolved exclusively by the agencies concerned

a)

Denial Letter

b)

Primacy of Jurisdiction

c)

Batas Pambasa 220

d)

Streamlining the Philippine EIS System

15.

Select the top two answers from the options provided that are most relevant to the statement.

It is at this stage when the formal EIA Study for ECC application is initiated.

a)

Detailed Engineering and Design

b)

Feasibility Study

c)

Conceptualization / Inception

d)

Project Cycle