Testing and Decommissioning

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

The first step in soundness testing of rigid pipes is:

a)

Visual inspection

b)

Hydrostatic testing

c)

Ultrasonic testing

d)

Pressure testing

2.

After filling the system with water, you should:

a)

Check for leaks

b)

Start the engine

c)

Drain the water

d)

Add more water

3.

Fill in the blank: Pump system up to 1.5 times the _______ pressure.

a)

maximum

b)

minimum

c)

average

d)

standard

4.

What should be done if there is a pressure drop during testing?

a)

Increase the pressure immediately

b)

Stop the test and check for leaks

c)

Ignore the pressure drop

d)

Continue testing at lower pressure

5.

What is the first step in the soundness testing of plastic pipes (polybutylene)?

a)

Pump system to 1bar

b)

Slowly fill the system with water

c)

Increase pressure to 1.5 times working pressure

d)

Walk around system and check for leaks

6.

During Test B, after how many minutes should you inspect the pressure loss initially?

a)

15 minutes

b)

30 minutes

c)

60 minutes

d)

120 minutes

7.

Fill in the blank: After re-filling the system, open the kitchen tap and allow water to run until clear of ________.

a)

debris/colour

b)

air bubbles

c)

rust

d)

sediment

8.

What is the first step in the flushing and disinfecting process?

a)

Identify the area to be disinfected

b)

Prepare disinfectant solution

c)

Flush the system with water

d)

Inspect the equipment

9.

Pressure is checked according to the instructions by:

a)

using a pressure gauge

b)

listening for air leaks

c)

feeling for vibrations

d)

observing the pressure indicator

10.

Fill in the blank: Open ends must be _______ during the decommissioning process.

a)

sealed

b)

opened

c)

ignored

d)

painted