1.

In enterprises, the management of hazardous solid waste must comply with regulations, specifically:

a)

allowed to be recycled.

b)

sold to units with purchasing needs.

c)

used as raw materials for other production processes.

d)

must contract with units that have the function of transporting and processing according to regulations.

2.

What factors need to be considered when assessing the economic feasibility of a clean production plan?

a)

No requirements for energy, training workers, not affecting production.

b)

Reduce the number of workers serving production, reduce energy consumption, reduce production costs.

c)

Reduce production service costs, reduce waste treatment costs, reduce product cost, short payback time.

d)

Reduce waste treatment costs, reduce production service costs, low investment capital, reduce product cost, low pollutant load.

3.

Clean production is implemented through a process with:

a)

05 steps, 18 tasks.

b)

05 steps, 12 tasks.

c)

06 steps, 18 tasks.

d)

06 steps, 12 tasks.

4.

Thành phần điển hình của một nhóm công tác SXSH nên bao gồm đại diện?

a)

Cấp lãnh đạo đơn vị, bộ phận sản xuất, tài chính kế toán và vật tư, đại diện các nhà thầu cung cấp vật tư cho nhà máy

b)

Cấp lãnh đạo, sản xuất, vật tư, kế toán, chuyên gia môi trường, đại diện cơ quan quản lý nhà nước về môi trường

c)

Cấp lãnh đạo, sản xuất, vật tư, kế toán, môi trường&an toàn, chuyên gia SXSH (nếu cần thiết)

d)

Tất cả đều sai

5.

In which year was the term Cleaner Production officially used in the 'International Declaration on Cleaner Production' of UNEP?

a)

1995

b)

1996

c)

1997

d)

1998

6.

Turning off water valves or shutting down equipment when not in use to avoid energy loss belongs to which group of solutions?

a)

Changing technology.

b)

Good housekeeping

c)

Optimizing the production process.

d)

All three answers are incorrect.

7.

Cleaner Production is the continuous application of an integrated, preventive environmental strategy towards ………………………. in order to increase overall efficiency and reduce damage and risks for humans and the environment. (Fill in the blank)

a)

processes, products and services.

b)

sustainable development.

c)

production processes.

d)

economic benefits.

8.

Industrial ecology is an industrial production system that is cyclical, leading to all outputs of this production process becoming inputs for other production processes to....................

a)

maximize production efficiency.

b)

increase the company's profits.

c)

minimize waste.

d)

protect the environment.

9.

Which barrier to cleaner production belongs to the internal barriers of the enterprise?

a)

Low environmental awareness.

b)

Weakness of the legal framework.

c)

Difficulties in accessing cleaner production technology.

d)

Difficulties in accessing external financial resources.

10.

A cement plant invests in a steam recycling system for the Clinker furnace to save energy. The investment cost for the steam recycling system is $153,000. The plant saves $53,500 annually. How many years will it take for the plant to break even if the discount rate is 12%?

a)

Year 2,7

b)

Year 3,7

c)

Year 4,7

d)

Year 5,7