wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

WJEC Level 1-2 Engineering Unit 1: Planning Manufacture

Total questions: 5

Worksheet time: 3mins

Name
Class
Date
1.

A manufacturing plan should include:

a)

only the production schedule.

b)

the production schedule, resources, and quality control measures.

c)

just the list of raw materials.

d)

only the budget allocation.

2.

Which of the following is a tool used in the production of an engineered outcome?

a)

Scriber

b)

Hammer

c)

Paintbrush

d)

Screwdriver

3.

Fill in the blank: Equipment should be classed as any powered machinery that will be used in the production of an ________ outcome.

a)

engineered

b)

unexpected

c)

random

d)

unplanned

4.

The purpose of contingency planning in manufacturing is to:

a)

ensure smooth operations during unexpected events

b)

increase production speed

c)

reduce labor costs

d)

improve product quality

5.

Which chart is used to present plans for manufacture in a way that is easy to find key information at a glance?

a)

Gantt Chart

b)

Pie Chart

c)

Bar Chart

d)

Line Chart