wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

CNC EDM Die Sinker Basics Quiz

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What is the first step in mounting the electrode holder on a CNC EDM Die Sinker machine?

a)

Press the CLAMP button

b)

Insert the electrode holder into the slot

c)

Hold the electrode and bring the holder close to the mounting mechanism

d)

Press the ACK button

2.

What sound indicates that the chuck mechanism is released?

a)

A beep

b)

A click

c)

A buzz

d)

A ring

3.

After inserting the electrode holder into the designated slot, which button should be pressed to lock it in place?

a)

ACK button

b)

CLAMP button

c)

Z- button

d)

MFR 3 button

4.

Which axis movements are possible using the remote control pendant on a CNC EDM Die Sinker machine?

a)

X and Y only

b)

Z only

c)

X, Y, and Z

d)

Y and Z only

5.

What is the fastest Manual Feed Rate (MFR) available on the machine?

a)

MFR 0

b)

MFR 1

c)

MFR 2

d)

MFR 3

6.

Which button would you press to move the electrode in the positive Z direction?

a)

Z+

b)

Z-

c)

Y+

d)

X+

7.

What should be ensured before proceeding after mounting the electrode holder?

a)

The machine is turned off

b)

The electrode holder is securely mounted

c)

The feed rate is set to MFR 0

d)

The ACK button is pressed again

8.

What is the purpose of adjusting the feed rate on the CNC EDM Die Sinker machine?

a)

To change the electrode size

b)

For smooth and accurate positioning

c)

To increase the machine's power

d)

To release the chuck mechanism

9.

Which hand should be used to hold the electrode holder securely during mounting?

a)

Right hand

b)

Left hand

c)

Both hands

d)

Either hand

10.

What is the function of the CLAMP button on the remote control pendant?

a)

To release the chuck mechanism

b)

To lock the electrode holder in place

c)

To adjust the feed rate

d)

To move the electrode