WorksheetsSPP and Architectural Practice
Total questions: 89
Worksheet time: 45mins
UAP Doc 200
Code of Ethical Conduct
Pre-Design Services
Specialized Allied Services
Construction Services
SPP Doc 201
Code of Ethical Conduct
Pre-Design Services
Specialized Allied Services
Construction Services
SPP Doc 202
Design Services
Pre-Design Services
Post-Construction Services
Construction Services
SPP Doc 203
Design Services
Pre-Design Services
Specialized Allied Services
Construction Services
SPP Doc 204-A
Design Services
Pre-Design Services
Specialized Allied Services
Fulltime Supervision Services
SPP Doc 205
Design Services
Post-Construction Services
Specialized Allied Services
Construction Services
SPP Doc 206
Design Services
Comprehensive Architectural Services
Specialized Allied Services
Construction Services
SPP Doc 207
Design-Build Services
Comprehensive Architectural Services
Specialized Allied Services
Construction Services
SPP Doc 208
Design-Build Services
Comprehensive Architectural Services
Architectural Design Competition
Construction Services
SPP Doc 209
Design-Build Services
Comprehensive Architectural Services
Professional Architectural Consulting Services (PACS)
Construction Services
UAP-IAPOA Doc 210
Design-Build Services
Comprehensive Architectural Services
Architect's Guidelines for Standards of Professional Practice Compliances
Construction Services
SPP Doc 204-B
Design-Build Services
Comprehensive Architectural Services
Construction Management Services
Construction Services
What doe CoR stand for?
Credit of Registry
Certificate of Registration
Certificate of Registry
Copy of Registration
Article V Section 41 of RA 9266
Standards of Professional Practice
SPP 200
Methods of Compensation
Architectural Fines and Violations
Every when is the renewal for the architectural license?
3 years
5 years
10 years
2 years
When is it best to use Direct Selection?
For relatively small project, based on reputation or personal recommendations
Conducted by committees of institutions, corporations, or agencies
When it is for commercial use by the private sector
For a residential project in a highly urbanized city
When is it best to use Architectural Design Competition (ADC) as a method of selection?
For civic or monumental projects
For committees or large institutions, corporation or public agencies
When the client is a well-known and first class individual
For international clients
Arrange the process of Comparative Selection.
i. Pre-qualification
ii. Invitation
iii. Interview
iv. Verification
v. Negotiation
vi. Evaluation and Ranking
ii., i., iii., iv., vi., v.
i., ii., iii., iv., v., vi.
iii., ii., iv., v., vi., i.
ii., iii., iv., v., vi., i.
What is the advantage of hosting an Architectural Design Competition?
Open to RLAs and AFs
Helps the clients decide better
Results are based on skill and not just branding
Good for starting architects
Who are the participants of an Architectural Design Competition?
i. Sponsor/Client
ii. Competitors (RLAs and foreign architects)
iii. Professional Advisers (RLA and IAPOA members)
iv. Jury
v. Firm Marketers
vi. Contractors
All of the Above
i., ii., iii., iv. only
ii. only
i. and ii. only
Expanding services of architect and involving architects in the earliest stages of the project.
SPP 200
SPP 201
SPP 203
SPP 202
True or False:
Consultation and Pre-feasibility Studies both fall under SPP 201.
True
False
True or False:
Site Selection and Site Planning both fall under SPP 202.
True
False
When does the architect submit proposals for the pre-design services?
After the initial meeting with the Client
Immediately after finishing the proposals
The second meeting with the Client
After seeing the site
Method of Compensation that is applicable to only non-creative works.
Multiple of Direct Personnel Expenses
Professional Fee and Expenses
Lump Sum or Fixed Fee
Per Diem
The Method of Compensation frequently used in continuous series of projects.
Professional Fee and Expenses
Multiple of Direct Personnel Expenses
Lump Sum
Fixed Fee
What Method of Compensation is usually used for government projects due to paperwork and its time-consuming process?
Lump Sum
Multiple of Direct Personnel Expenses
Per Diem
All of the Above
When is the Method of Compensation Per Diem, Honorarium and Reimbursable Expenses?
Ocular or Site Visits
Small fit-outs not over 20sqm.
Lunch break allowance
All of the Above
What does Per Diem payment mean?
Per Day
Voluntary payment
Out-of-pocket expenses
All of the Above
Which group of professionals is SPP 202 applicable to?
i. Individual RLAs or group practice
ii. Foreign Architects
iii. BPOs
iv. Unlicensed Junior Architects
i. and ii. only
All of the Above
i., ii., and iii. only
i., ii., iii., and iv. only
True or False:
Bidding or Negotiation Phase can be found in SPP 201.
True
False
True or False:
Schematic Design Phase and Project Definition Phase can be found in SPP 202.
True
False
True or False:
The Construction Phase can be found in SPP 204-B.
True
False
It is the preparation of drawings from approved schematics and conceptual plans.
Design Development Phase
Schematic Phase
Contract Document Phase
Bidding Phase
It is when the owner defines the project requirements; architects inform about the technical requirements and professional fees.
Project Definition Phase
Schematic Design Phase
Initial Meeting
Contract Document Phase
It is between the architect and owner with sub-consultancy contracts between the architect and other allied professionals.
Single Contract
Separate Contract
Separate contracts among engineers, architects, and allied professionals and the owner.
Single Contract
Separate Contract
Based on the classification found in SPP 202, what is the description of Group 1 projects?
Moderate complexity of plan or design
Simplest Utilization and Character
Exceptional Character and Complexity
Residences
Based on the classification found in SPP 202, what is an example of a Group 2 project?
Bakeries
Call Centers
3-storey Houses
Aquariums
Based on the classification found in SPP 202, what Group is a housing project under?
Group 4
Group 7
Group 6
Group 5
Who pays for the extra sets of contract documents?
Architect
Contractor
Client
Depends who requests
Architectural Interiors, Acoustic Design, Architectural Lighting, and Layout Design are all under which service?
Specialized Architectural Services
Physical Planning Service
Comprehensive Development Planning Services
None of the Above
The orderly arrangement of vertical structures, horizontal developments like ROWs, open spaces and activity spaces, considering the immediate surroundings, interrelationship of structures and the impact on the neighboring area.
Physical Planning
Urban Planning
Urban Development and Layout
All of the Above
The scientific study on the built environment's well-being.
Architecture
Forensic Architecture
Site Development Plan
Site Feasibility Study
What does CSG stand for?
Construction Supervision Group
Contractor's Standards and Guidelines
Construction Standards and Guidelines
Civil Structure Group
What are the scope of services found in SPP 204-A?
i. Quality Control
ii. Evaluation of Construction Work
iii. Preparation of Daily Inspection Reports
iv. Filing of Documents
v. Purchasing of Construction Materials
i., ii., iii., iv. only
All of the Above
i. and ii. only
i., ii., and iii. only
Who is allowed to be a Construction Manager?
Member of the staff of the Owner
Independent individual
Firm hired by the Owner
All of the Above
True of False:
Project Management is under SPP 206.
True
False
How is the Project Manager compensated?
Percentage basis
Per project phase
Based on visual progress
All of the Above
The people appointed by the Owner to assess the entries of the competition.
Jury
Judges
Architects
None of the Above
An architect appointed by the Owner and approved by IAPOA to organize the ADC on behalf of the Owner.
Professional Advisor
Head Jury
Head Architect
Officer-in-Charge
Specialist personnel who may be consulted by the Jurors during the conduct of the ADC on behalf of the Owner.
Technical Advisor
Compensation Secretariat
Compensation Advisor
Technical Secretary
Body formed by the Owner and approved by the Professional Advisor to assist the Professional Advisor and the Jury in the administrative conduct of the ADC.
Professional Body
Competition Secretariat
Secretariat Body
Administrative Committee
True of False:
Anonymity of the competitors should be maintained until the final judgment of the competition.
True
False
Who supervises the ADC?
Professional Advisor
The Jury
Owner
All of the Above
True or False:
All drawings and plans, other than those who won the competition or won prizes or have been purchased by the Owner, shall be destroyed after the public exhibition unless provisions are made.
True
False
There is no such rule
Holistic and progressive growth and advancement of community, province, region, and nation inclusive of their respective economic, social, physical, environmental, and institutional sectors.
Comprehensive Development
Consortium
Consulting Architectural Firm
Architectural Development
Refers to a coalition of purely Filipino professional consultants or consulting firms collaborating with authorized foreign professional consultants or firms.
Consortium
Foreign Agreement
Foreign Consultancy Collaboration (FCC)
Combined Development
What does FPCA stand for?
Foreign and Philippine Consortium Architecture
Filipino Professional Consulting Architect
Filipino Practitioners of Civil Architects
Foreign Passport Consortium Architecture
Refers to a factor which compensates the PCS for the following: overhead office cost, fringe benefits and social charges, fee for contingencies, interest on capital reserves, and profit.
Multiplier
Professional Fee
Lump Sum
Mixed Compensation
Used when PCA services are expected to be required at intervals over a period of time; assures that the services will be available when required.
Retainer
Per Diem
Lump Sum
Salary Cost
How long until payments will be entitled to interest?
More than 30 days from billing day
More than 7 working days from billing day
More than 14 working days from billing day
Depends on the architect
When can PCAs sign and seal architectural documents?
Only if they also act as the Architect-of-Record
Any kind of architect is allowed to sign and seal as long as they are licensed
Only when they are the principal architect of the firm
Depends on the Client
What does ADR stand for?
Alternative Dispute Resolution
Architectural Design Revision
Archived Design Renders
Architectural Diminutive Review
The globally common Method of Compensation.
Percentage-based
Lump Sum
Per Diem
Mixed Compensation
What is the most common contract for architectural design services?
Detailed Architectural and Engineering Design Services
Detailed Architectural Design Services
Design and Build Service
Design, Manage, and Build Services
True or False:
DAEDS is a Design-Build Service
False
True
Upon signing of the Service Agreement, what percentage of the Professional Fee should be paid?
5%
10%
25%
40%
Upon completion and submission of the Schematic Design Phase, what percentage of the Professional Fee should be paid EXCLUDING the previous payment?
15%
20%
25%
40%
Upon completion and submission of the Design Development Phase, what percentage of the Professional Fee should be paid EXCLUDING the previous payment?
15%
20%
25%
40%
Upon completion and submission of the Contract Documents Phase, what percentage of the Professional Fee should be paid EXCLUDING the previous payment?
60%
30%
25%
50%
Where does the remaining 10% payment of the Project go?
Construction Phase
Finishing Phase
Mobilization and Overhead
Contractor's Fee
How is the Construction Phase payment divided?
5% for Architect's Liability and 5% for Periodic Construction Supervision
10% for Architectural Supervision and 10% for Contractor's Fee
5% for Site Visit Mobilization and 5% for Overhead
None of the Above
This may involve certification and documentation costs such as LEED, GREEN, or BERDE.
Third Party Certification
Green Building Certification
IAPOA Certification
International Sustainable Standard Certification
The CM will be paid in fixed fee which is not affected by variations in estimates, bids, or change in order unless the Owner initiates an increase in scope.
Firm Fixed Price
Fixed Price Incentive
Cost + Fixed Fee
Fixed Fee
The CM will be paid in fixed fee which is adjusted according to the difference between the final allowable costs and the target costs.
Fixed Price Incentive
Firm Fixed Price
Cost + Incentive Fee
Cost + Fixed Fee
Cost reimbursement contracts with provisions for a fee that is adjusted by "sharing formulas" applied to the difference between final allowable costs and the target costs.
Cost + Incentive Fee (CPIF)
Cost + Adjusted Fee (CPAF)
None of the Above
All of the Above
CM will be paid with fixed fee plus reimbursement expenses incurred in the services.
Cost + Fixed Fee
Firm Fixed Fee
Fixed Price Incentive
Fixed Fee
What is the recommended Professional Fee for Construction Managers?
1.5% to 3% of the PCC
3.5% to 7% of the PCC
1% to 2% of the PCC
2% to 4% of the PCC
If the PM is also the architect for the design service, how are they compensated?
Separately
Included in the DAEDs PF
Included in the DADs PF
Included in the last 10% of the percentage Method of Compensation
What is the recommended PF of the PM?
2% to 5% of PCC
1% to 3% of PCC
10% of PCC
1.5% of PCC
What is the timeline of when the Owner should pay the 1st Prize Winner of an ADC?
Within 1 month after the official ADC announcement
Within 1 week after the official ADC announcement
Within 3 weeks after the ADC announcement
Within 30 days after the ADC annonouncement
Total cost of fixtures and accessories for architectural interiors, acoustics, lighting works, site development civil works, etc. designed, specified or produced by the Specialist Architect.
CoW
AF
RLA
CoA
Refers to the Architect commissioned by the Owner/Client to plan and design the building/structure and all its utilities.
Prime Professional
Architect-of-Record
Construction Manager
Project Manager
Means a duly notarized written contract or equivalent public instrument stipulating the scope of services and guaranteeing compensation of such services to be rendered by an architect registered and licensed by the PRC-PRBoA.
Service Agreement
Design Agreement
Professional Agreement
Official Notary
Intellectual Code of the Philippines
RA 8293
RA 9184
RA 9266
RA 9285
Government Procurement Act of 2003
RA 8293
RA 9184
RA 9266
RA 9285
Architecture Act of 2004
RA 8293
RA 9184
RA 9266
RA 9285
Alternative Dispute Resolution Act of 2004
RA 8293
RA 9184
RA 9266
RA 9285
