WorksheetsTransformation plan
Total questions: 5
Worksheet time: 3mins
Name
Class
Date
1.
1. What is the percentage scope of piping assets covered in the 2025 plan?
a)
50%
b)
100%
c)
30%
d)
75%
2.
Which of the following is a requirement for the tank RBI assessment?
a)
GE-APM Upgrade to API 579
b)
Pipeline Inspection Procedure
c)
GE-APM Upgrade to API 581
d)
Structural Integrity Module
3.
What is the expected number of Relief Valves (RVs) to be assessed?
a)
1,800
b)
18,000
c)
180
d)
800
4.
What type of personnel is primarily responsible for gathering design and process data across assets in 2025?
a)
RBI Engineer
b)
Contract Inspector
c)
Technical Clerk
d)
Operator
5.
Which of the following assets is listed as outside the RBI transformation scope?
a)
Boilers
b)
Dead legs
c)
Tanks
d)
Cross-country pipelines
100 %