wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Understanding RA 9266

Total questions: 50

Worksheet time: 37mins

Name
Class
Date
1.

What are the qualifications required to take the licensure exam under RA 9266?

a)

A degree in architecture, two years of practical training, and passing the required examinations.

b)

A degree in engineering and completion of a project management course.

c)

A master's degree in architecture and a portfolio review.

d)

A high school diploma and five years of experience in construction.

2.

Who manages a project construction team?

a)

Manager

b)

Contractor

c)

Site Engineer

d)

Foreman

3.

They are in charge of making sure the day-to-day needs of a project are carried out correctly. They are responsible for maintaining the schedule and organizing resources, monitoring the budget, making purchasing, invoicing, design and drawing development, project documentation and file management, tracking approvals and authorizations, contracts and other legal matters, and coordination between parties.

a)

Project Managers

b)

Superintendents

c)

C-Level Executives

d)

Contractors

4.

SPP Document 205 contains the standards for:

a)

Specialized allied Services

b)

Regular Design Services

c)

Post-Design Services

d)

Post-Contruction Services

5.

SPP Document 203 contains the standards for:

a)

Specialized Architectural Services

b)

Specialized Allied Services

c)

Regular Design Services

d)

Post-Construction Services

6.

The construction management service is covered by which SPP Document?

a)

SPP 203

b)

SPP 204-a

c)

SPP 204-b

d)

SPP 205

7.

Design Build Services is in what SPP Document?

a)

205

b)

207

c)

206

d)

208

8.

directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans, specifications and contract documents he/she has signed and sealed

a)

Architect of Record

b)

Consulting Architect

c)

Board Member

d)

Architect-in-charge of Construction

9.

who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture

a)

Architect of Record

b)

Consulting Architect

c)

Board Member

d)

Architect-in-charge of Construction

10.

It guarantees the compensation and scope of services rendered by an Architect

a)

Sign and Seal

b)

CoR and PIC

c)

Service Agreement

d)

Per square meter

11.

The following are the qualifications for the regulatory board member except

a)

Citizen and Resident of the Philippines

b)

Not be an Elective officer of IAPO or other Organization of Architects

c)

a faculty or member of a review institution. Completely teaching for 5 years.

d)

Never been committed a crime of moral turpitude

12.

As per Article 2 Section 7 : the following are the powers and function of the board except

a)

Prescribe and/or adopt the Code of Ethical Conduct and Standards of Professional Practice

b)

Administer oaths in connection with the administration of R.A. No. 9266

c)

Monitor the conditions affecting the national building code

d)

Hear and decide administrative cases involving violations of R.A. No. 9266

13.

Based on the Civil Code of the Philippines, how long is the mandated civil liability of the design professionals?

a)

3 years

b)

10 years

c)

15 years

d)

10 months

14.

Architectural and Engineering detailed drawings are all included in one contract with the owner.

a)

DADS

b)

DADA

c)

DEADS

d)

DAEDS

15.

Architect performing this type of service assumes the professional responsibility and civil liability for both the design and the

construction of the project.

a)

Architect of Record

b)

Architect-in-charge of Construction

c)

Design-Build

d)

Post-Construction Management

16.

The people appointed by the Owner to assess the entries to the Architectural Design competition.

a)

Consulting Architect

b)

Professional Advisor

c)

Jury

d)

Competition Secretariat

17.

To be qualified as having passed the licensure examination for architects, a candidate must obtain no grade lower than

a)

60%

b)

50%

c)

70%

d)

75%

18.

To be qualified as having passed the licensure examination for architects, a candidate must obtain a weighted general average of

a)

50%

b)

70%

c)

75%

d)

80%

19.

registered and licensed architect or permitted to practice under RA9266, who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture.

a)

Architect

b)

AoR

c)

AiCC

d)

CA

20.

registered and licensed architect who is directly and professionally responsible and liable for the construction supervision of the project.

a)

Architect

b)

AoR

c)

AiCC

d)

CA

21.

(Responsibilities in Relation to)

The Architect shall explain the conditional character of estimates

other than estimates submitted in the form of actual proposals by contractors

and in no case shall be guarantee any estimates or cost of the work.

a)

Contractor

b)

People

c)

Client

d)

Colleagues and Subordinates

22.

(Responsibility in Relation to)

Architect shall promote the interest of his professional

organization and do his full part of the work to enhance the objectives

and services of the organization.

a)

Contractor

b)

Colleagues and Subordinates

c)

Clients

d)

People

23.

This section of RA 9266 can usually be found in title blocks of project plans or blueprints.

a)

Section 30

b)

Section 31

c)

Section 32

d)

Section 33

24.

How many sets of plans/documents are to be given/submitted to the owner under Regular Design Services?

a)

7

b)

4

c)

6

d)

5

25.

Under this, the Architect states the project terms of reference (ToR) including the concept, objectives, and other necessary requirements to bid out architectural services (whether public or private)

a)

Value Management

b)

Design Brief Preparation

c)

Promotional Services

d)

Method of Compensation

26.

is based on the Architect’s / architectural firm’s talents, skill, experience, imagination, and on the type and level of professional services provided.

a)

Value Management

b)

Manner of Providing Services

c)

Method of Compensation

d)

Promotional Services

27.

This method of compensation is based on technical hours spent and does not account for creative work since the value of creative design cannot be measured by the length of time the designer has spent on his work.

a)

Multiple of Direct Personnel Expenses

b)

Unit Cost Method

c)

Percentage of Construction Cost

d)

Lump Sum Payment

28.

the owner defines the project requirements; architects inform about the technical requirements and the professional fees

a)

Design Development Phase

b)

Project Definition Phase

c)

Bidding or Negotiation Phase

d)

Schematic Design Phase

29.

Preparation of schematic design studies from project definition phase leading to conceptual plans (meaning schematic and conceptual drawings)

a)


Project Definition Phase

b)

Schematic Design Phase

c)

Design Development Phase

d)

Construction Phase

30.

preparation of drawings from approved schematics and conceptual plans

a)

Project Definition Phase

b)

Schematic Design Phase

c)

Design Development Phase

d)

Contract Document Phase

31.

preparation of drawings from approved Design Development Documents

a)

Project Definition Phase

b)

Design Development Phase

c)

Construction Phase

d)

Contract Document Phase

32.

Which of the following SPP categories encompasses the complete range of architectural services, including problem identification, conceptualization, and the development of various architectural solutions?

a)

SPP 202

b)

SPP 203

c)

SPP 206

d)

SPP 209

33.

Architectural service / phase where the architect and client choose the contractor

a)


Contract document phase

b)

Construction phase

c)

Bidding / negotiation phase

d)

Evaluation phase

34.

Means a document which forms part of the Architects' National Code which contains the norms and principles governing the practice of the profession of architecture in the highest standards of ethical conduct

a)


Code of Ethical Conduct

b)

Professional Identification Card

c)


Contract Document

d)


Standards of Professional Practice

35.

(Responsibility in Relation to)
Architect shall not render professional services without compensation except for small civic projects.

a)

People

b)

Client

c)

Colleagues and Subordinates

d)

Contractor

36.

(Responsibility in Relation to)
Architect shall not knowingly compete with other architects on the basis of difference of professional charges, nor use donation as a device for obtaining competitive advantage except for worthy civic or religious projects.

a)

People

b)

Colleagues and Subordinates

c)

Contractor

d)

Client

37.

(Responsibility in Relation to)
Architect shall not undertake, under a fixed contract sum agreement, the construction of any project based on plans prepared by him.

a)

People

b)

Contractor

c)

Client

d)

Colleagues and Subordinates

38.

(Responsibility in Relation to)
Architect shall not avail or make use of engineering or other technical services offered by manufacturers, or suppliers of building materials or equipment which may be accompanied by an obligation detrimental to the best interest of the client or which may adversely affect the architect's professional opinion

a)

People

b)

Manufacturers, Dealers, and Agents

c)

Colleagues and Subordinates

d)

Client

39.

(Responsibility in Relation to)
Architect shall not at any time receive commissions, discounts, fees, gifts or favors from agents or films handling building materials or equipment which may place him in reciprocal frame of mind

a)

Colleagues and Subordinates

b)

Manufacturers, Dealers, and Agents

c)

Client

d)

Contractor

40.

(Responsibility in Relation to)
Architect shall immediately upon his personal knowledge and inspection, reject, or condemn materials, equipment, or workmanship which are not in conformity with the contract documents in order not to cause unnecessary delay and additional expense to the contractor

a)

People

b)

Contractor

c)

Colleagues and Subordinates

d)

Client

41.

Laundry

a)

Group 5

b)

Group 2

c)

Group 3

d)

Group 4

42.

Mortuary

a)

Group 5

b)

Group 2

c)

Group 3

d)

Group 4

43.

Museum

a)

Group 5

b)

Group 2

c)

Group 3

d)

Group 4

44.

Gymnasium

a)

Group 1

b)

Group 2

c)

Group 3

d)

Group 4

45.

Residential condominiums

a)

Group 1

b)

Group 2

c)

Group 3

d)

Group 4

46.

Simple loft type building

a)

Group 1

b)

Group 2

c)

Group 3

d)

Group 4

47.

Hangars

a)

Group 1

b)

Group 2

c)

Group 3

d)

Group 4

48.

Freight Facilities

a)

Group 1

b)

Group 2

c)

Group 3

d)

Group 4

49.

Armories

a)

Group 1

b)

Group 2

c)

Group 3

d)

Group 4

50.

Bakeries

a)

Group 1

b)

Group 2

c)

Group 3

d)

Group 4