wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Green Engineering

Total questions: 20

Worksheet time: 22mins

Name
Class
Date
1.

Which one is not include in 7 Radical Innovation ....

a)

Automation

b)

Artificial Intelligent

c)

Internet

d)

Energy

2.

A smart building or intelligent building, is a building that uses technology to (a)   and integrate its systems. The goal is to make the building more efficient, comfortable, and environmentally friendly

3.

What time is the computerization era ....

a)

1500-1560

b)

2000-2020

c)

1970-1990

d)

1950-1970

4.

Which one is not an Automatic Lightning System ....

a)

Heat Transfer

b)

Addaptive Dimming

c)

BMS Integration

d)

Light and Motion Sensing

5.

What picture is this ?

a)

Solar Plat

b)

Batery Panel

c)

Sun Protector

d)

Solar Panel

6.

Average reduction in overall building energy consumption after full system implementation is (a)   %

7.

Energy storage sollution, except ....

a)

Flow Battery Syst

b)

Photovoltaic

c)

Lithium Ion Tech

d)

Night Time Utilization

8.

Data Collection is (a)   track occupancy patterns and energy usage

9.

What picture is this ....

a)

Pyramid

b)

Stairs

c)

Installation Req

d)

Triangle

10.

Type of smart material, except ....

a)

Thermochromic

b)

Photovoltaic

c)

Rubber

d)

Piezoelectric

11.

Process layout is production layout for mass production

a)

True

b)

False

12.

Which one is thermochromic material ?

a)

b)

c)

13.

Smart materials are (a)   to smart building development

14.

Please draw a graph of managing quality and cost

15.

Examples of Automation Tech .... except ....

a)

Drones

b)

Robot Installer

c)

3D Printing

d)

Manual Book

16.

What is this picture ?

a)

Lean Construction

b)

Prefabrication

c)

Construction

d)

Use of BIM

17.

The application of lean concepts, prefabrication and efficient factory layouts play an important (a)   in accelerating construction, reducing costs and improving the quality of smart buildings

18.

Automation in smart construction, except ....

a)

Improve work safety

b)

Improve efficiency and accuracy

c)

Reduce construction time and cost

d)

Reduce cost production

19.

This is a ....

a)

Airplane

b)

Drone

c)

Robot

d)

Flying vehicle

20.

What is this thing ....

a)

Robotic Arm

b)

Crane

c)

Forklift

d)

Spray Paint