Engineering May Quiz - MOC (May)

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What is the primary goal of the Management of Change (MOC) process?

a)

To track maintenance schedules and spare part inventory

b)

To evaluate financial cost before making business decisions

c)

To assess risks and control impacts before implementing changes

d)

To reduce project approval timeliness

2.

While the cost is not much and no capital is required, moving the Injection Molding machine from the end of the line to the middle of the line in the same building does not require an MOC.

a)

True

b)

False

3.

What is the purpose of checking that all safety equipment, such as fire extinguishers, safety showers, and eyewash stations, are installed and accessible in a Pre-Start EHS Review (PSER) in the MOC process?

a)

To finalize the project budget

b)

To confirm that the change has considered potential impacts and required mitigating steps before full implementation

c)

To train new employees

d)

To document minor changes in procedures

4.

All of the following are valid reasons to trigger a Management of Change review for a chemical change, EXCEPT:

a)

A solvent is switched to reduce flammability risks

b)

A cleaning agent is changed to comply with VOC limits

c)

A colorant is reformulated with similar chemical for cosmetic enhancement

d)

A new additive is introduced, require updated emissions permitting

5.

Procedure changes affecting how a hazardous material is handled must go through MOC even if the material itself is unchanged.

a)

True

b)

False

6.

Who is the primary responsible person to approve MOC request:

a)

The initiator of the MOC

b)

EHS department head

c)

Site Engineering Lead

d)

Site Operations Lead

7.

When the site does not have a Site Engineer Lead, the Site Operations Lead shall assume the approval process?

a)

True

b)

False

8.

Which of the following facility modification is LEAST likely to require MOC:

a)

Installing an additional access door in controlled access equipment room

b)

Modifying the production layout affecting operator access

c)

Replacing wall paint with wooden panel wall for decorative purposes

d)

Landscaping or exterior building painting that does not affect operations or utilities

9.

Replacing a pump with a newer, more energy-efficient model of the flow rate and pressure rating does not require a MOC process if the function remains the same.

a)

True

b)

False

10.

Which of the following statements about the type of changes under MOC process is most accurate:

a)

Emergency changes do not require documentation if resolved quickly

b)

Temporary changes must follow the same review and approval process as permanent changes

c)

Temporary changes can remain in place indefinitely if no issues are reported

d)

Emergency changes should bypass MOC entirely to avoid delays