1.

Concrete pavement distribute load over wide , therefore , the pressure given on the subgrade is high.

a)

True

b)

False

2.

I am one of the materials used in the

surface finish for rigid pavements.

(a)  

3.

AASHTO 1993 Pavement Design Guideline was developed using _____________________ method.

a)

mechanistic empirical

b)

empirical

c)

precedent

d)

statistical

4.

The CBR method was developed by _____________

a)

KENHA

b)

Canada Paving Association

c)

California division of highway

d)

KURA

e)

California state

5.

What does ESAL stand for?

a)

Equal Single Axle Load

b)

Equivalent Single Axel Load

c)

Equivalent Single Axle Load

d)

Extra Single Axle Load

6.

Illustrate a section through a reinforced beam

7.

The following are used as surface finish. Which ne is not?

a)

Surface dressing

b)

Surface seal

c)

Surface marking

d)

Retread

8.

A flexible pavement is characterised by,..............................................

a)
  • Lower initial construction cost compared to rigid pavements.

b)
  • Higher maintenance costs over the long term.

c)
  • Thickness can be increased to handle higher loads.

d)
  • Easier and quicker to repair.

e)
  • All the above

9.

Which is the right sequence?

a)

SURFACE

BINDER

SUBGRADE

SUB-BASE

BASE

b)

SUBGRADE

SUB-BASE

BASE

BINDER

SURFACE

c)

SURFACE

BINDER

BASE

SUB-BASS

SUBGRADE

d)

SURFACE

BASE

BINDER

SUB-BASE

SUBGRADE

e)

SURFACE

BINDER

BASE

SUB-BASE

SUBGRADE

10.

In pavements, reinforcements is commonly done in,.......................

a)

FLEXIBLE

b)

RIGID

c)

BOTH FLEXIBLE AND RIGID

d)

COPOSITE

11.

In a rigid pavement, the main reinforcements are placed at the bottom

a)

FALSE

b)

TRUE

12.

The forces exerted on the pavement structure by vehicles, including trucks, buses, and other vehicles.

(a)  

13.

Concrete,..............................

a)

Is a composite mixture of water, sand, cement and concrete

b)

is a composite mixture of cement, fine and course aggregates

c)

is a composite mixture of water, cement, fine and course aggregates

d)

is a composite mixture of water, sand, cement, fine and course aggregates

e)

is a composite mixture of cement, soil, fine and course aggregates and water

14.

The Subgrade is compacted to a specified density to provide a stable platform

a)

TRUE

b)

FALSE

c)

NONE OF THE ABOVE

15.

For instance you find that the top surface of the construction site you are tasked to carry out engineering works comprises of black cotton soil, and it covers

a great depth. What would be the best practice?

a)

scrap off the top surface and start the construction

b)

introduce deep foundations like rafts and start the construction

c)

introduce deep foundations like piles and start the construction