Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Overboard Work Safety Quiz

Total questions: 100

Worksheet time: 50mins

Name
Class
Date
1.

Overboard work such as rust chipping, painting, welding, patching, and repair is usually only carried out when:

a)

Detected and required by the Port State Control inspector

b)

Requested by the shipowner for each specific area

c)

Requested by the cargo owner

d)

Weather conditions are favorable

2.

Crew members assigned to overboard work must be:

a)

Over 18 years old

b)

Over 30 years old

c)

Under 40 years old

d)

Over 16 years old

3.

Seafarers performing overboard work must have a minimum sea service experience of:

a)

At least 30 months

b)

At least 20 months

c)

At least 18 months

d)

Less than 40 months

4.

Before the work is carried out, safety equipment must be inspected by:

a)

Chief Engineer

b)

Master and Chief Engineer

c)

Chief Mate or Bosun

d)

Duty Officer

5.

When working overboard, the seafarer must carry the following equipment:

a)

Lifebuoy and waterproof suit

b)

Life raft and lifebuoy

c)

Life jacket

d)

Lifeboat

6.

When performing overboard work, an additional safety measure that should be rigged beneath the stage is:

a)

Lifeline ladder

b)

Safety boots

c)

Safety harness

d)

Safety net

7.

To access the stage over the ship’s side, the seafarer must use:

a)

Pilot ladder

b)

Rope ladder

c)

Safety ladder

d)

Accommodation ladder

8.

When two stages are to be suspended over the ship’s side, they must be rigged:

a)

Adjacent to each other horizontally

b)

Stacked vertically on top of each other

c)

Separated horizontally

d)

Separated vertically

9.

While working overboard, team members must agree to communicate using:

a)

Signal flags

b)

Whistle signals

c)

Walkie-talkies

d)

Hand signals

10.

What defines an enclosed space on board a ship?

a)

Not illuminated

b)

Not frequently accessed

c)

Not adequately ventilated

d)

Without an entry point

11.

An example of an enclosed space on board is:

a)

Wheelhouse

b)

Galley

c)

Cabin

d)

Paint locker

12.

Before conducting any work in an enclosed space, it is necessary to:

a)

Hold a shipboard meeting

b)

Pump ballast water

c)

Vent inert gas

d)

Ventilate the space

13.

Before entering enclosed spaces, it is necessary to:

a)

Hold a shipboard meeting

b)

Measure oxygen concentration

c)

Notify the company

d)

Inform the Master

14.

The minimum oxygen concentration required for safe entry into an enclosed space is:

a)

20%

b)

22%

c)

23%

d)

Not less than 20%

15.

When taking air samples to test the atmosphere before entering an enclosed space, the sample should be taken from:

a)

Outside the enclosed space

b)

At the entrance of the enclosed space

c)

The furthest point inside the enclosed space

d)

The center of the enclosed space

16.

Before performing work at height or over the ship’s side, you must report to:

a)

Chief Engineer

b)

Second Mate

c)

Third Mate

d)

Duty Officer

17.

Ropes used for suspending stages and for safety harnesses when working aloft or overboard must be load-tested to how many times the allowable working load if the condition of the rope is in doubt?

a)

2–3 times

b)

3–4 times

c)

4–5 times

d)

5–6 times

18.

When painting on deck, the warning sign should be:

a)

Under Painting Work

b)

Painting

c)

Wet Paint

d)

Men at Work

19.

When painting a large area in an enclosed space, the painting should be done:

a)

From inside to outside

b)

From outside to inside

c)

From windward to leeward

d)

In a circular pattern

20.

When painting overboard or at height, the work should proceed in the following order:

a)

From top to bottom

b)

From right to left

c)

From bottom to top

d)

From inside to outside

21.

What are symptoms of oxygen deficiency?

a)

Drowsiness

b)

Dizziness and fainting

c)

Headache

d)

Muscle tension

22.

At what oxygen concentration may coma and respiratory arrest occur?

a)

From 16% to 20%

b)

From 9% to 14%

c)

From 6% to 10%

d)

Below 6%

23.

What flammable gas concentration prohibits entry into an enclosed space?

a)

Less than 2%

b)

Greater than 2%

c)

Greater than 21%

d)

Less than 21%

24.

What is the EEBD (Emergency Escape Breathing Device) primarily used for?

a)

Firefighting

b)

Rescue

c)

Escape

d)

Drill

25.

Which equipment must be prepared and placed at the entrance of an enclosed space?

a)

Life-saving appliances such as EPIRB and SART

b)

Gas mask and portable fire extinguisher

c)

Portable fire extinguisher and EEBD

d)

At least one breathing apparatus and resuscitation equipment

26.

What means of communication is used during entry into an enclosed space?

a)

Handheld UHF/VHF radio

b)

Signal light

c)

Whistle

d)

Semaphore flags

27.

If the standby person at the entrance detects a casualty inside the enclosed space, they must:

a)

Enter immediately

b)

Report to the Chief Mate

c)

Report to the Duty Officer

d)

Inform the Master

28.

During overboard work, a warning sign should be displayed at the working area:

a)

Under Maintenance

b)

Heavy Duty

c)

Men at Work

d)

Restricted Area

29.

The person assigned as the watchman during work aloft or overboard must be:

a)

Highly experienced

b)

Over 18 years old

c)

Have at least 12 months of seagoing experience

d)

No specific requirement

30.

During overboard work, the stage must be secured to:

a)

Ship’s railing

b)

Ship’s side

c)

Hatch cover

d)

Solid ship’s structure

31.

When working overboard, in addition to personal protective equipment, seafarers must also wear:

a)

Safety net

b)

Safety shoes

c)

Safety harness

d)

Safety helmet

32.

When working overboard, tools must be placed:

a)

On the stage

b)

In the shirt pocket

c)

Held in hand

d)

In a bucket

33.

What height is considered working aloft?

a)

0.5 meters

b)

1 meter

c)

1.5 meters

d)

2 meters

34.

The warning sign for areas with personnel working aloft is:

a)

Men at work aloft

b)

Under maintenance

c)

Wet paint

d)

Men at work

35.

When painting inside holds, rooms, or enclosed areas, you must:

a)

Ventilate after painting

b)

Ventilate before painting

c)

No ventilation needed

d)

Ventilate throughout the painting process

36.

When working with rotating machinery such as drills or grinders, you need protective equipment including:

a)

Protective clothing, safety shoes, gloves, helmet, earplugs

b)

Protective clothing, safety shoes, gloves, goggles, apron

c)

Protective clothing, safety shoes, helmet, goggles

d)

Protective clothing, safety shoes, gloves, helmet, apron, goggles

37.

Hot work onboard (such as welding or cutting) while the vessel is in port requires permission from:

a)

The Master and responsible personnel on board

b)

The Master

c)

Port authority

d)

Both the Master and port authority

38.

Before performing welding, cutting, or any hot work, it is necessary to:

a)

Check the surrounding area to ensure no flammable or explosive materials are present

b)

Check the area below the workspace to ensure no flammable or explosive materials are present

c)

Check both the surrounding and below the workspace for flammable or explosive materials

d)

Ensure no flammable or explosive materials are present

39.

If welding or cutting is done near an open cargo hatch:

a)

Use tarpaulin to cover the entire hatch

b)

Place a shield to prevent sparks from falling into the hold

c)

Close the hatch before proceeding

d)

Stop work immediately and report to the Master

40.

When working near bulkheads, it is necessary to check:

a)

Whether pipes or cables on both sides of the bulkhead may be affected

b)

The surrounding area

c)

The surrounding area and area below the workspace

d)

Insulation panels

41.

To ensure safety during work that generates sparks, inspection of cargo tanks, fuel tanks, holds, or any tanks/enclosed areas that previously contained flammable materials must be conducted:

a)

Before welding and cutting work

b)

Before and during the welding and cutting work

c)

Before and after the welding and cutting work

d)

Before, during, and after the welding and cutting work

42.

The person assigned to supervise welding and cutting must be present regularly and be prepared with:

a)

Firefighting equipment

b)

Life-saving equipment

c)

Both life-saving and firefighting equipment

d)

Only supervision is required; the worker must prepare the equipment themselves

43.

What oxygen concentration level causes rapid pulse, shortness of breath, lack of concentration, fatigue, and headache?

a)

From 16% to 20%

b)

From 14% to 9%

c)

From 10% to 6%

d)

Below 6%

44.

What oxygen concentration level causes dullness, confusion, mental instability, intoxication-like state, increased body temperature, and pale skin?

a)

From 16% to 20%

b)

From 14% to 9%

c)

From 10% to 6%

d)

Below 6%

45.

What oxygen concentration level causes unconsciousness, central nervous system disorder, and pale skin?

a)

From 16% to 20%

b)

From 14% to 9%

c)

From 10% to 6%

d)

Below 6%

46.

The causes of oxygen deficiency include:

a)

Oxygen being consumed in the air

b)

Displacement of air by other gases

c)

Lack of proper ventilation

d)

All of the above (A, B, and C)

47.

The ventilation method for deep ballast tanks is:

a)

Pump out all the water and then ventilate

b)

Fill the tank with seawater and then pump it out

c)

Use high-capacity ventilation fans

d)

Ventilate while pumping out the water

48.

The English name for the safety checklist before entering enclosed spaces on board is:

a)

Hot work checklist

b)

Permition checklist

c)

Safety checklist

d)

Safety permition

49.

Safety considerations when using repair tools:

a)

Compact and easy to use

b)

Large and structurally strong

c)

Suitable and of correct size for use

d)

Matches human working strength

50.

The periodic dry-docking interval for ships is:

a)

Every 12 months or if engine/hull issues occur

b)

Every 24 months or if engine/hull issues occur

c)

Every 36 months or if engine/hull issues occur

d)

Every 48 months or if engine/hull issues occur

51.

Proper maintenance and storage of repair tools on board requires:

a)

Soaking in a preservative solution (lubricating oil)

b)

Experienced personnel in charge

c)

Leaving them at the worksite for next day's use

d)

Clean, neat, orderly, and easy to locate when needed

52.

To prevent theft during dry docking, all loose materials and equipment on deck should be collected, including removable equipment not needed during repairs such as:

a)

Lifeboats, life jackets

b)

Life rafts, radar antennas

c)

EPIRBs, lifebuoys

d)

Fire hoses, fire pumps

53.

Before the ship leaves dry dock, bottom drain holes must be:

a)

Replaced and stored carefully for the next dry docking

b)

Tightly fastened and welded to the hull

c)

Completely removed

d)

Tightly fastened and sealed with cement

54.

When the ship is about to enter low-temperature areas, deck pipelines should:

a)

Close water/oil supply valves and open drain valves to release all water or oil

b)

Fill with water or oil to prepare for immediate use

c)

Close supply valves and leave water/oil in the pipes

d)

Do nothing, leave them as normal

55.

During electric welding and cutting, besides wearing protective clothing (coveralls), one must also wear:

a)

Insulated shoes and gloves

b)

Electrically insulated safety boots, dry leather gloves, and protective clothing

c)

Electrically insulated leather gloves

d)

Electrically insulated leather gloves and a welding mask

56.

If a person conducting electric welding/cutting is electrocuted, you must immediately:

a)

Report to the duty officer, captain, and chief mate

b)

Cut the power and report to the duty officer

c)

Immediately turn off the power, perform first aid, and trigger emergency alarm

d)

Cut the power and take the victim to the sh

57.

When the ship is in low-temperature regions, attention when operating winch systems should be:

a)

Operate under load to warm up the system

b)

Add more oil to the system

c)

Run unloaded to warm up the system

d)

Drain some oil from the pipelines

58.

The most vulnerable part of the human body to microwave and ultraviolet radiation is the:

a)

Ears, nose, throat

b)

Ears, eyes

c)

Eyes, nose

d)

Eyes

59.

Some types of dry recorder paper emit harmful odors during use, so the area where the device is placed should be:

a)

Near the ship’s hospital

b)

Well ventilated

c)

Installed outdoors

d)

Equipped with first aid supplies

60.

When someone is working near the radar antenna or radio equipment, it is necessary to:

a)

Turn off the device and guard the area until the work is finished

b)

Notify the duty officer and stop the work immediately

c)

Keep it running normally for navigational safety

d)

Cut the main power and post a warning sign at both the device and the power source

61.

A pilot must not embark/disembark using only the pilot ladder when the ship's freeboard is:

a)

> 6 meters

b)

> 7 meters

c)

> 8 meters

d)

> 9 meters

62.

What is the most strictly prohibited issue concerning the pilot ladder?

a)

Connecting the ladder with shackles, knots, or splices

b)

Misaligning the distance between steps

c)

Allowing the ladder to shift or swing

d)

Steps not being parallel to the water surface

63.

A combination ladder is used when the ship's freeboard is:

a)

Greater than 9 meters

b)

Less than 9 meters

c)

Exactly 9 meters

d)

All of the above are incorrect

64.

When using a combination ladder:

a)

Man-ropes must be arranged in advance on deck

b)

Man-ropes are not required

c)

Man-ropes are optional

d)

All of the above are correct

65.

At night, when lighting the pilot ladder with a spotlight, the light should be directed:

a)

From the bow to the stern

b)

From the stern to the bow

c)

Vertically from the rail down to the water surface

d)

All of the above

66.

The officer in charge of pilot embarkation/disembarkation must:

a)

Supervise the securing of the pilot ladder

b)

Inspect the pilot ladder

c)

Stand by the ladder from the pilot's arrival until departure

d)

Report the pilot-related situation to the captain

67.

To ensure absolute safety for the pilot during boarding/disembarking, the ship must:

a)

Inspect the pilot ladder beforehand

b)

Communicate with the pilot regarding time, side, and height for transfer

c)

Place the ladder on the lee side and provide appropriate lighting

d)

All of the above

68.

A pennant flag or windsock must be displayed in a clearly visible location for the helicopter (used for pilot transfer), and a light must shine toward the flag or windsock to:

a)

Indicate the ship’s position

b)

Show wind direction

c)

Help locate the helicopter landing area

d)

Act as a communication signal between ship and helicopter

69.

When receiving or disembarking a pilot via helicopter, how many crew members in “fireman outfit” with firefighting tools (fire axe, fire hook, etc.) must be present at minimum?

a)

1 crew member

b)

2 crew members

c)

3 crew members

d)

4 crew members

70.

To ensure ship safety when entering port, the steering system must be set to:

a)

Emergency steering

b)

Auto steering

c)

Manual steering

d)

Repetitive steering

71.

Safety checks in the bridge using the checklist to prepare for port arrival include:

a)

Synchronizing ship’s clocks, switching steering mode, and updating to port area charts

b)

Switching steering mode, updating to port charts, and testing mooring winches

c)

Checking satellite phone, and weather message receiver in the bridge

d)

All of the above are correct

72.

Safety checks in the bridge to prepare for port arrival include:

a)

Checking and agreeing on communication channels, testing the telegraph

b)

Testing the telegraph, testing mooring winches

c)

Testing mooring winches, testing the telegraph

d)

All of the above are incorrect

73.

Safety checks in the bridge using the checklist to prepare for port arrival include:

a)

Turning on and checking the echo sounder, calculating tide

b)

Checking the radar

c)

Correcting the chart for the port area

d)

All of the above are correct

74.

General safety checks before port arrival include:

a)

Removing lashing, testing mooring winches

b)

Opening cargo hold covers

c)

Ballasting

d)

Garbage disposal

75.

General safety checks before port arrival do not include:

a)

Arranging suitable pilot ladders

b)

Preparing firefighting systems

c)

Avoiding objects protruding outside the ship’s hull

d)

Checking and testing bilge pump

76.

For safe ship maneuvering into port, just before boarding a pilot or entering the anchorage area, which task must be performed:

a)

Testing generator

b)

Testing steering gear

c)

Testing main engine

d)

Testing side ladder deployment

77.

Safe port entry preparation should refer to:

a)

Checklist for port arrival/departure and bridge checklist

b)

The book 'Voyage Planning at Sea'

c)

Cargo hold inspection checklist

d)

All of the above

78.

When preparing mooring lines before berthing, attention should be paid to:

a)

Preparing lines on the berth side properly

b)

Repairing damaged lines

c)

Passing both wire and fiber ropes through the same fairlead

d)

All of the above are incorrect

79.

What is a strictly forbidden action when handling mooring lines during berthing?

a)

Standing outside a taut line; standing inside loops or splices

b)

Standing inside loops/splices; standing outside a taut line

c)

Standing outside a rope loop; standing inside a taut line

d)

All of the above are incorrect

80.

When handling mooring lines during berthing, always avoid:

a)

Using your foot to brake or hold the rope

b)

Letting the rope run freely during handling

c)

Allowing line turns to overlap on the winch drum

d)

All of the above are correct

81.

When making fast to the quay, which of the following should be avoided?

a)

The cable and rope passing through the same fairlead

b)

The rope is coiled on the winch drum and laid out on the deck at least 15 meters

c)

Preparing the fender towards the side of the quay

d)

All of the above are correct

82.

When making fast to the quay, which of the following should be avoided?

a)

Laying the rope on deck in a sinusoidal shape

b)

Forming a loop of rope on deck

c)

Storing unused rope in the locker

d)

Missing ropes placed near the fairlead

83.

When preparing to berth, right before bringing the mooring lines ashore, which action should be performed?

a)

Lower the line into the water when instructed

b)

Notify the people ashore before throwing the heaving line

c)

Coil the line on the bitts with 1.5 turns

d)

The mooring winch drum should be stowed

84.

When making fast to the quay and the port uses a line-throwing boat, you should:

a)

Store the heaving line away

b)

Pay out the line freely to reduce risk before the boat arrives

c)

Control the speed of the line payout by coiling 1.5 turns on the bitts

d)

All of the above are correct

85.

When hauling in the tail rope for making fast to the tug (tail rope), you should:

a)

Use your hands to haul in the mooring line if enough personnel are available

b)

Use a winch to haul in the mooring line

c)

Secure the tail rope to the bollard before hauling it in

d)

All of the above are correct

86.

Find the correct order when completing the berthing process:

a)

Pay out the mooring line, haul in the line, release the chafing gear, tighten the line, coil the line

b)

Pay out the mooring line, tighten the line, haul in the line, coil the line, release the chafing gear

c)

Pay out the mooring line, release the chafing gear, haul in the line, coil the line, tighten the line

d)

Pay out the mooring line, haul in the line, tighten the line, coil the line, release the chafing gear

87.

As soon as the gangway is brought ashore, you must:

a)

Lubricate the roller at the end of the gangway

b)

Attach safety nets along the entire length of the gangway

c)

Hang a sign warning outsiders from boarding the ship

d)

Lower the man-rope to the bottom of the gangway

88.

To ensure safety during ship anchoring, you must pay attention to:

a)

The depth of the anchorage area

b)

The nature of the seabed and the duration of anchoring

c)

The current speed and direction

d)

All of the above are correct

89.

When anchoring, be cautious of:

a)

Only reporting once the anchor has been fully deployed

b)

Continuously reporting the anchor status during deployment

c)

Pulling the anchor up when it touches the seabed

d)

Releasing the anchor while the ship is backing only when the ship’s speed is below 2 knots

90.

What should be noted when checking the anchor windlass system?

a)

Open the lashings

b)

Before operating the hydraulic pump, ensure the brake is set, the stops are engaged, and the clutch is applied

c)

Carefully cover the anchor hawsepipe

d)

All of the above are correct

91.

When preparing to go to the bow area to drop the anchor, which tools or equipment should you bring?

a)

Hammer and crowbar

b)

Personal protective equipment (shoes, helmet, glasses, gloves)

c)

Flashlight (if it's dark)

d)

All of the above

92.

What depth is considered too deep for free anchoring?

a)

≥ 60m

b)

≥ 80m

c)

≥ 100m

d)

≥ 120m

93.

When making fast to a buoy using ropes, which detail should be paid attention to?

a)

The number and type of ropes are correct

b)

Coiling the ropes into a pile

c)

Paying out the ropes to the boat directly from the coils or piles

d)

All of the above

94.

The safety measures for preparing the anchor line to make fast to a buoy (using the anchor line) should be:

a)

Keep the anchor line intact and only hang the anchor

b)

Lash the anchor, remove the link of the first anchor line

c)

Coiling the anchor line into a pile on the deck

d)

No need to tie the fiber rope with the anchor line and buoy

95.

When leaving port, the safety checks in the bridge will include:

a)

Checking the crew, testing the order bell, and testing the steering gear

b)

Checking the watertight integrity of the bridge

c)

Checking the ventilation panel in the cargo hold on the bridge

d)

All of the above

96.

When leaving port, after the safety checks on the bridge have been completed, you must:

a)

Check the order bell

b)

Check the fire-fighting system

c)

Record the checks in the logbook and checklist as required

d)

All of the above

97.

The safety checks on the bridge to prepare for departure from port will be based on:

a)

“Bridge checklist” and “departure checklist”

b)

“Guide to port entry”, “port entry checklist”

c)

Only the “bridge checklist”

d)

All of the above are incorrect

98.

Who is responsible for lashing and securing the ship before departure from the dock?

a)

Bosun

b)

Chief Officer

c)

Second Officer

d)

Watchkeeping Officer

99.

Which equipment could shift on deck if not properly lashed?

a)

Crane

b)

Hatch cover

c)

Mooring lines on deck

d)

All of the above

100.

Before leaving the dock, the safety check and cleanup on deck will include:

a)

Checking for stowaways

b)

Cleaning up chafing gear

c)

Cleaning up used materials

d)

All of the above