wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Decimal and Integer Operations Quiz

Total questions: 40

Worksheet time: 4hrs 45mins

Name
Class
Date
1.

Multiply: b) 0.07 × 1.4

a)
0.1
b)
0.05
c)
0.0987
d)
0.098
2.

Multiply: a) 4.5 × 2.3

a)
9.5
b)
11.2
c)
8.4
d)
10.35
3.

Multiply: c) 6.2 × 0.05

a)
0.32
b)
0.30
c)

0.31

d)

0.25

4.

Multiply: d) 3.86 × 4.2

a)
15.42
b)

16.212

c)
17.89
d)

16.265

5.

A pencil costs ₹4.75. What is the cost of 12 pencils?

a)
₹45.00
b)
₹60.50
c)
₹57.00
d)
₹50.25
6.

A car travels 8.6 km per litre of petrol. How far can it go on 4.5 litres?

a)
25.8 km
b)

38.7 km

c)
30.5 km
d)

37.7 km

7.

A book has 0.85 cm thickness. What is the total thickness of a stack of 18 books?

a)
12.5 cm
b)
15.3 cm
c)
20.1 cm
d)
10.8 cm
8.

Divide: a) 6.3 ÷ 0.3

a)
20
b)

21

c)
22
d)

29

9.

Divide: b) 4.5 ÷ 1.5

a)
4
b)
3
c)
2
d)
5.5
10.

Divide: c) 12.6 ÷ 0.6

a)
21
b)
19
c)
22
d)
20
11.

Divide: d) 0.81 ÷ 0.09

a)
8
b)
10
c)
9
d)
7
12.

A rope of 9.6 m is cut into pieces of 1.2 m each. How many pieces are there?

a)
8
b)
12
c)
6
d)
10
13.

A pack of rice weighing 5.4 kg is divided equally into 6 bags. What is the weight of each bag?

a)
1.2 kg
b)
0.5 kg
c)
1.0 kg
d)
0.9 kg
14.

A car travels 0.75 km in a minute. How many minutes will it take to travel 6 km?

a)
5 minutes
b)

8 minutes

c)
12 minutes
d)

9 minutes

15.

2.4 litres of juice is poured into glasses, each holding 0.3 litres. How many glasses can be filled?

a)
10
b)

8

c)
4
d)

9

16.

Add: a) 7 + (–5)

a)
12
b)
2
c)
-3
d)
1
17.

Add: b) –3 + (–6)

a)
-6
b)
-3
c)
0
d)
-9
18.

Add: c) –8 + 10

a)
2
b)
-10
c)
18
d)
-2
19.

Add: d) –12 + (–7)

a)
-19
b)
-5
c)
-10
d)
-15
20.

The temperature was –4°C in the morning and increased by 6°C. What is the new temperature?

a)
2°C
b)
4°C
c)
0°C
d)
-2°C
21.

A diver descends 10 meters and then ascends 4 meters. What is the final position relative to the starting point?

a)
The final position is 10 meters below the starting point.
b)
The final position is at the same level as the starting point.
c)
The final position is 6 meters below the starting point.
d)
The final position is 4 meters above the starting point.
22.

A bank account had a balance of ₹–250. A deposit of ₹500 was made. What is the new balance?

a)
₹0
b)
₹250
c)
₹–250
d)
₹500
23.

Subtract: a) 6 – (–4)

a)
0
b)
10
c)
-10
d)
2
24.

Subtract: b) –5 – (–9)

a)
-4
b)
4
c)
-5
d)
5
25.

Subtract: c) –7 – 3

a)
-5
b)
-8
c)
-12
d)
-10
26.

Subtract: d) 2 – (–6)

a)
-4
b)
4
c)
8
d)
-8
27.

The temperature dropped from 3°C to –4°C. What is the change in temperature?

a)
-1°C
b)
7°C
c)
2°C
d)
5°C
28.

Multiply: a) –4 × 6

a)
24
b)
-24
c)
-20
d)
-30
29.

Multiply: b) –7 × –3

a)
21
b)
7
c)
-10
d)
-21
30.

Multiply: c) 5 × –8

a)
-30
b)
40
c)
-50
d)
-40
31.

Multiply: d) –9 × 2

4 lines
32.

A penalty of ₹25 is charged for each missed assignment. If 4 assignments are missed, what’s the total penalty?

a)
₹200
b)
₹100
c)
₹50
d)
₹75
33.

A gain of ₹80 per sale is made. How much profit from 12 sales?

a)
₹960
b)
₹800
c)
₹1,200
d)
₹720
34.

Divide: a) –20 ÷ 4

a)
0
b)
-4
c)
5
d)
-5
35.

Divide: b) –36 ÷ –6

a)
6
b)
0
c)
-12
d)
-6
36.

Divide: c) 15 ÷ –3

a)
0
b)
-5
c)
-3
d)
5
37.

Divide: d) –45 ÷ 5

a)
-7
b)
-8
c)
-10
d)
-9
38.

A company suffered a total loss of ₹240 over 8 days. What was the daily loss?

a)
₹30
b)
₹20
c)
₹40
d)
₹50
39.

A mountain climber descended –600 m over 4 hours. What was the average descent per hour?

a)
-200 m/hour
b)
-100 m/hour
c)
-300 m/hour
d)
-150 m/hour
40.

A diver drops to –90 m in 3 minutes. How many meters per minute is the descent?

a)
-20 m/min
b)
-40 m/min
c)
-30 m/min
d)
-10 m/min