Safety Management in Civil Works

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

What is the first safety step before starting any civil work on-site?

a)
Start construction without a plan.
b)
Begin with material procurement.
c)
Assign tasks to workers immediately.
d)
Conduct a site assessment for hazards.
2.

Which PPEs are mandatory during rebar cutting and bending activities?

a)
Safety glasses, gloves, steel-toed boots, hard hats.
b)
Dust masks, aprons, flip-flops, safety harnesses
c)
Face shields, knee pads, reflective vests, respirators
d)
Safety goggles, sandals, regular shoes, earplugs
3.

Which component is NOT part of a safe scaffold setup?

a)
Ladder
b)
Guardrails
c)
Safety harness
d)
Scaffold planks
4.

What is the primary purpose of using safety harnesses on construction sites?

a)

To protect against electrical hazards.

b)

To improve worker comfort.

c)

To enhance visibility in low light.

d)

To prevent falls from heights.

5.

Which of the following is essential for ensuring proper ventilation in confined spaces?

a)

Implementing a ventilation plan.

b)

Closing all doors and windows.

c)

Installing ceiling fans.

d)

Using air fresheners.

6.

What should be done if a worker notices a safety hazard on-site?

a)

Document it for future reference.

b)

Try to fix it themselves.

c)

Report it to a supervisor immediately.

d)

Ignore it and continue working.

7.

Fall protection is required when working at heights above

a)
4 feet
b)
10 feet
c)
12 feet
d)
6 feet
8.

Which document outlines emergency contacts and assembly points?

a)
Safety manual
b)
Emergency response plan
c)
Fire evacuation plan
d)
Incident report
9.

What is the minimum distance a scaffold should be from power lines?

a)

20 feet

b)

15 feet

c)

10 feet

d)

3 feet

10.

Which of the following is a common cause of slips and falls on construction sites?

a)

Good lighting

b)

Clear walkways

c)

Proper footwear

d)

Wet surfaces

11.

What is the primary hazard while maintaining electrical panels in a warehouse?

a)
Electric shock or electrocution
b)
Heavy lifting injuries from equipment
c)
Chemical spills from nearby storage
d)
Fire hazards from faulty wiring
12.

Which fire extinguisher is suitable for electrical fire?

a)
Class C fire extinguisher (CO2 or dry chemical)
b)
Class A fire extinguisher (water)
c)
Class B fire extinguisher (foam)
d)
Class D fire extinguisher (dry powder)
13.

Who should be notified first after a safety incident during civil maintenance?

a)
Site supervisor or safety officer
b)
Maintenance crew
c)
Local authorities
d)
Project manager
14.

What is the purpose of barricading civil work areas?

a)
To increase the speed of construction work.
b)
To enhance the aesthetic appeal of the site.
c)
To provide a space for public gatherings.
d)

To prevent unauthorized access and accidents.

15.

During mezzanine repair, what must be ensured first?

a)

Nearby material is cleared and structure is supported

b)
Verify equipment availability.
c)
Check for aesthetic improvements.
d)
Ensure proper lighting conditions.