WorksheetsERP Package Selection and Implementation
Total questions: 15
Worksheet time: 8mins
What is the main objective of ERP package selection?
Choose the cheapest system
Find a flexible package that meets company needs
Select the most popular vendor
Avoid all customization
Which of the following is a best practice in ERP software selection?
Avoid demos to save time
Only consider on-premise ERP
Insist on demos with test data
Skip user involvement
What is the Big Bang implementation strategy?
Implementing ERP in one go across the organization
Implementing one module at a time
Running old and new systems in parallel
Implementing ERP only in small departments
Which strategy keeps both legacy and new ERP systems active at the same time?
Big Bang
Parallel
Phased
Hybrid
Why is cost usually considered later in ERP selection?
Because it is less important than functionality and fit
Because vendors set the price later
Because ERP is always free
Because cost is unpredictable
Which criteria evaluates the vendor's experience, support, and training commitment?
Cost Criteria
Vendor Criteria
Package Criteria
Transition Criteria
Which transition strategy combines multiple approaches (Big Bang, Phased, Process Line)?
Hybrid
Parallel
Mini Big Bang
Suite Rollout
What is a benefit of SaaS ERP solutions?
On-premise deployment only
Scalability and flexibility
Requires more hardware
No need for internet
What is the purpose of including end users in ERP demos?
To negotiate the price
To test usability for actual users
To speed up implementation
To reduce vendor costs
Which ERP implementation strategy has the lowest risk but higher cost and time?
Parallel
Big Bang
Hybrid
Process Line
Which ERP transition approach is also called modular implementation?
Big Bang
Phased
Parallel
Hybrid
What is a key risk of Parallel implementation?
No backup system
Higher cost to run two systems
Slower system speed
Reduced reporting accuracy
Which implementation strategy requires the most careful preparation?
Big Bang
Parallel
Hybrid
Phased
Which transition strategy can break a Big Bang into smaller suites?
Mini Big Bang
Parallel
Phased
Hybrid
What is the main disadvantage of Phased implementation?
Longer time and higher overall cost
No fallback system
No vendor involvement
Requires Big Bang