1.

Which of the following is an area that fire department examiners are MOST likely to be trained in? (652)

a)

Standpipes

b)

Building codes

c)

Sprinkler systems

d)

Fire and Life Safety Codes

e)

Fire Detection and Alarm Services

2.

Which is the BEST option for preventing owner/occupant from attempting to omit a requirement? (652)

a)

Require additional fees for inspections

b)

Ignore the requirement altogether

c)
Assume compliance without verification.
d)

Use a team approach

3.

Which of the following statements about an Inspector I is MOST accurate? (652)

a)

They are not expected to perform plans review, but must be familiar with the process.

b)

They are expected to conduct plans review on a regular basis.

c)

They are expected to calculate occupancy load and approve plans using a stamp

d)

They are expected to conduct all system testing with third party companies

4.

What is the main reason local governments require construction permits and plans review? (652)

a)

Community safety

b)

Building safety

c)

Fire safety

d)

Electrical safety

5.

Which statement about inspector site visits during construction is MOST accurate? (653)

a)
Inspector site visits are optional and not necessary.
b)
Inspector site visits only focus on aesthetic aspects of construction.
c)
Inspector site visits are primarily for contractor training purposes.
d)

Inspector site visits should be frequent for compliance and quality assurance.

6.

Which of the following makes inspector site visits more efficient and effective? (653)

a)
Utilizing technology like mobile inspection apps.
b)
Scheduling visits during peak hours for better access.
c)

Coordinating inspections with completion dates

d)
Conducting inspections without a checklist.
7.

At a construction site, what must the inspector comply with for the use of personal protective clothing and equipment? (654)

a)

Occupational Safety and Health Administration regulations (OSHA)

b)

NPFA 101

c)

US Labor Laws

d)

Local workers' unions

8.

If the owner or contractor fail to follow requirements of the building or fire code, records may be required for use in: (654)

a)

any legal action

b)

permitting process

c)

change orders

d)

life safety procedures

9.

Which type of view contains information about exterior components of a building such as the type of exterior finish? (668)

a)

Elevation

b)

Detailed

c)

Sectional

d)

Floor

10.

The inspector or plans examiner who reviews the plans may also be responsible for ____. (652)

a)

conducting flow tests

b)

field verification

c)

determining occupancy load

d)

completing architectural design

11.

The primary reason local governments require construction permits and plans review is ____. (652)

a)

community safety

b)

financial compensation

c)

compliance with building and fire codes

d)

job security

12.

Which statement about procedures for accepting field changes is MOST accurate? (652)

a)

The authority may rest with the fire marshal or building official

b)

The authority may rest with the fire inspector

c)

The authority may rest with the design professional or architect

d)

The authority may rest with the general contractor

13.

Conducting plans review enables plans examiners to ____. (653)

a)

discover any errors or omissions in a building plan

b)

increase financial compensation with fines and fees

c)

slow down the construction process

d)

build positive relationships with community members

14.

An inspector should visit the site often to ____. (653)

a)
review financial records
b)

verify each code requirement is being met based on the approved plan

c)

maintain positive communication the general contractor

d)

conduct fire watches

15.

Which of the following helps prevents firefighters and emergency responders from dealing with unknown and potentially dangerous structural conditions? (653)

a)

Building permits

b)

Input in design process

c)

Construction standards

d)

Field verification

16.

Which of the following is the BEST reason information about construction projects is useful? (653)

a)

Preincident planning

b)

Correcting errors

c)

Firefighter and emergency responder safety

d)

Construction standards

17.

To ensure that fire and life safety requirements are met during construction, an inspector must verify ____. (654)

a)

a reliable water supply

b)

completion dates with the general contractor

c)

site access

d)

temporary fire protection systems

e)

The fire watch schedule

18.

Which of the following establishes the basis for all future inspections of a building? (654)

a)

Accurate and complete record keeping during plans review and field verification

b)

The review of completion dates provided by the general contractor

c)

The professional relationship between the general contractor and fire inspector

d)

The presence of working fire protection systems and procedures

19.

Who should the inspector check-in with at construction sites? (654)

a)

General contractor/project manager/

superintendent

b)

Design professional

c)

Fire marshal

d)

Code enforcement

20.

What should an inspector use for field verification? (654)

a)

Checklist

b)

iPad

c)

Safety Data Sheets

d)

Work orders

21.

Who should be notified if an inspector finds violations during a construction site visit? (654)

a)

General contractor

b)

Firefighters

c)

Fire Marshall

d)

Legal counsel

22.

When occupants remain in a building during construction, an inspector must verify ____. (654)

a)

all means of egress are clear

b)

there are working fire extinguishers

c)

plans are submitted on time

d)

there will be a reliable fire watch

23.

What should happen when occupants remain in a building during construction and a fire detection or alarm system will be nonfunctional for any length of time? (654)

a)

Stop work order

b)

Fire watch

c)

Sanction

d)

Fine

24.

True or false:

On construction drawings, plans reviewers should be familiar with some of the more commonly used abbreviations and symbols. (655)

a)

TRUE

b)

FALSE

25.

During which step of the plans review process do plans examiners from building and fire departments note corrections or alterations needed to meet code requirements? (656)

a)

Review

b)

Resubmittal

c)

Authorize

d)

Accept

26.

Which of the following are the final two steps in the plans review process? (656)

a)

Application and Submittal

b)

Review

c)

Resubmittal

d)

Accept

e)

Authorize

27.

Which of the following are the first three general steps in the plans review process? (656)

a)

Application and Submittal

b)

Review

c)

Resubmittal

d)

Acceptance

e)

Authorize

28.

During which step of the plans review process is the permit to begin the construction for the specific site and project issued? (656)

a)

Review

b)

Authorize

c)

Resubmittal

d)

Accept

29.

Many agencies use _______ to assist with construction document review. (656)

a)

insurance companies

b)

third party agencies

c)

design professionals

d)

local authorities

30.

The last set of plans must be kept at the construction site ___ (656)

a)

for field inspections

b)

until project is completed

c)

for 90 days

d)

forever

31.

Minor revisions to the plans made by the client are called ____. (657)

a)

change orders

b)

stop orders

c)

request orders

d)

construction orders

32.

The local jurisdiction may require that contractors be bonded and ____. (657)

a)
registered
b)
insured
c)
licensed
d)
certified
33.

Manufacturer's product submittal information sheets are also called _____. (658)

a)

site plans

b)

floor plans

c)

safety data sheets

d)

cut sheets

34.

Which of the following is the BEST reason why submitted plans need to have all the information necessary for review? (658)

a)

Helps inspectors know what to expect during construction

b)

Helps streamline the plans review process for code enforcement

c)

Generates more funding for local jurisdictions

d)

Creates a predictable schedule for building permits.

35.

During which step of the plans review process are the final set plans and documents stamped and signed to indicate official acceptance? (668)

a)

Review

b)

Resubmittal

c)

Accept

d)

Application

36.

Submitted plans need to have all the information necessary to _____. (658)

a)

evaluate compliance of locally adopted code

b)

determine appropriate hazard level

c)

determine correct occupancy load

d)

implement fire protection systems

37.

Who determines the manner in which plans are handled or routed through the review process? (658)

a)

Local jurisdictions

b)

Design professionals

c)

Legal counsel

d)

Fire inspectors

38.

Which of the following is the BEST reason for agencies to charge a few to review construction documents? (658)

a)
To provide free services to all clients.
b)

Defray administrative costs associated with the review

c)
To increase agency profits without justification.
d)
To avoid any responsibility for project outcomes.
39.

What are the other names for manufacturers' product submittal information sheets? (658)

a)

Cut sheets

b)

Catalog Sheets

c)

Manufacturers' cut sheets

d)

Safety data sheets

e)

Material specifications

40.

Ideally, all plans for a project are submitted to the reviewing authority ____. (658)

a)

at the same time

b)

at separate times

c)

before and after installation of

d)

during construction

41.

Working drawings on a commercial construction project are typically divided into groups by: ___. (662)

a)
budget
b)
materials
c)
timeline
d)

individual discipline

42.

Each working drawing should have a ____ that contains specific information about the project. (662)

a)
design notes
b)
project summary
c)
title block
d)
header section
43.

A title block generally contains the following information: (663)

a)

Title of drawing

b)

Description of the project

c)

Project completion date

d)

Scale of the drawing

e)

North direction symbol

44.

One key part of a set of construction documents are the graphical representation of the project known as ____. (662)

a)
models
b)
specifications
c)

working drawings

d)
blueprints
45.

A _____ view provides information concerning the overall layout of the site or building. (663)

a)

plan

b)

site

c)

detail

d)

floor

46.

A _____ plan identifies conditions currently existing on the site and relates information needed to locate the building. (663)

a)

site

b)

floor

c)

sectional

d)

elevation

47.

What is often shown as a broken line with the dimensions expressed in feet and decimal fractions on a site plan? (663)

a)

north direction symbol

b)

lot dimensions

c)

utility lines

d)

contour lines

48.

Which type of plan of usually one of the first sheets of a set of construction drawings and relates information needed to locate the building? (663)

a)

Site plan

b)

Detailed plan

c)

Floor plan

d)

Elevation plan

49.

Which of the following are important for determining grade elevations for fire apparatus access to site? (664)

a)

Contour lines

b)

North dimension symbol

c)

Utility lines

d)

Lot dimensions

50.

Which of the following are usually shown as broken lines marked at intervals with a letter? (664)

a)

Utility lines

b)

Lot lines

c)

Contour lines

d)

Fire apparatus access

51.

A ____ plan is a horizontal drawing of a structure at a given level, such as the ground floor, basement, or roof. (665)

a)

site

b)

floor

c)

elevation

d)

sectional

52.

Which type of plan provides specific details about building components such as stairs, building services, and ceiling and roof joists or trusses? (665)

a)

Floor Plan

b)

Site Plan

c)

Evacuation Plan

d)

Emergency Plan

53.

Which type of plan provides specific details about building components such as external walls, internal walls and partitions, and fire separation walls? (665)

a)

Floor plan

b)

Site plan

c)

Sectional plan

d)

Elevation Plan

54.

A/an _____ is used to indicate a door's direction of swing. (666)

a)

arc

b)

parallel lines

c)

black triangle

d)

dotted line

55.

Which of the following is the usual symbol for exterior walls? (666)

a)

a pair of parallel lines

b)

dotted lines

c)

black triangle

d)

two black circles

56.

The labeling and _____ of the drawing on the elevation view are usually defined by the AHJ. (666)

a)
scale
b)
dimensions
c)

orientation

d)
description
57.

The _____ view is a two-dimensional view of a building as seen from the exterior. (666)

a)

sectional

b)

detailed

c)

elevation

d)

floor

58.

Which type of view has the purpose of showing the internal construction of each assembly? (668)

a)

Sectional view

b)

Elevation view

c)

Plan view

d)

Detailed View

59.

Which type of view provides additional information in a larger scale? (669)

a)

Detailed

b)

Sectional

c)

Elevation

d)

Emergency

60.

A _____ view will show the exact construction of the fire door and its activation mechanism. (669)

a)

elevation

b)

sectional

c)

detailed

d)

site

61.

Which building systems are MOST likely to spread fire and smoke? (670)

a)

Mechanical

b)

Electrical

c)

Plumbing

d)

Automatic sprinkler systems

62.

What should be designed by mechanical engineers or building systems engineers? (670)

a)

mechanical systems

b)

standpipe and hose systems

c)

electrical systems

d)

fire detection and alarm systems

63.

Which system plan will most likely indicate the location of fire and/or smoke dampers where the ductwork penetrates fire-resistive walls or floors? (670)

a)

Mechanical

b)

Fire Detection and Alarm Systems

c)

Plumbing

d)

Electrical

64.

For which building system must the inspector verify the location of exit signs and the means of egress lighting? (672)

a)

Electrical

b)

Mechanical

c)

Plumbing

d)

Special Agent Extinguishing Systems

65.

What should inspectors verify during a review of electrical systems? (672)

a)

Location of exit signs

b)

Means of egress lighting

c)

Emergency and standby power

d)

Power supply to fire detection and alarm systems

e)

Automatic fire suppression systems

66.

Which electrical system component has the location of the generator or fuel cell? (672)

a)

emergency or standby power systems

b)

hazardous location electrical equipment

c)

means of egress lighting

d)

power supply to fire detection and alarm systems

67.

Which building system should be inspected to determine whether the water supply is adequate to support the fire protection systems in the structure? (672)

a)

Electrical

b)

Plumbing

c)

Mechanical

d)

Automatic Sprinkler Systems

68.

Before the sprinkler system plans review begins, the plans reviewer verifies that the design professional ______. (673)

a)

has applied the proper NFPA standard

b)

calculated the correct occupancy load

c)

included essential fire protection systems

d)

explained the purpose of each compartment

69.

What is required to determine the appropriate automatic sprinkler system plan? (674)

a)

Classifying the hazard by occupancy (light, ordinary, or extra hazard)

b)

Storage commodity (shelf, high-piled, rack, or warehouse)

c)

Field inspection

d)

Completed safety data sheet

70.

The size of each sprinkler system is based on the _____. (675)

a)

total floor area

b)

size of the system

c)

pipe sizes and length

d)

type of system

71.

Which system plan includes information of the FDC location and water supply main location and capacity? (677)

a)

Standpipe and hose

b)

Plumbing

c)

Mechanical

d)

Automatic sprinkler systems

72.

Fire detection and alarm systems are designed to meet requirements found in NFPA ___. (677)

a)

72

b)

80

c)

25

d)

20

73.

For special-agent fire extinguishing systems, what additional information should be included in the documentation: (677)

a)

Definition of the area or equipment to be protected

b)

Type of extinguishing agent being used

c)

Amount of agent required

d)

Type of expellant gas

e)

Duration of flow

74.

All fire detection alarm equipment must be listed by ____. (678)

a)

a nationally recognized testing agency

b)

local authorities

c)

insurance companies

d)

general contractors

75.

All fire detection and alarm systems must have _____ supervision. (678)

a)

electrical

b)

mechanical

c)

manual

d)

automatic

76.

What should be included in the construction documents? (678)

a)

Battery load and voltage drop calculations

b)

Manufacturers' cut sheets

c)

Point-to-point wiring diagrams

d)

Methods of supervision

e)

Sequence of operation

77.

Which of the following are general elements that should be reviewed in systematic plans review? (679-680)

a)

Occupancy classification

b)

Means of egress

c)

Fire extinguishers

d)

Plumbing

78.

Which of the following is the first step in evaluating documents? (679-680)

a)

Review the overall size of the building in terms of height and area

b)

Occupancy classification

c)

Occupant load

d)

Means of egress

79.

The first step in evaluating documents is to review the overall size of the building in terms of _____ and _____. (680)

a)

height, area

b)

fire safety, hazards

c)

occupancy load, fuel load

d)

inches, feet

80.

Each means of egress must provide a _____. (681)

a)

continuous path of travel to the level of exit discharge

b)

manual pull station

c)

audible voice emergency signal

d)

detailed map next to each door

81.

When does the plans examiner evaluate occupant load? (681)

a)

As a final step in the plans review process

b)

After evaluating the life safety and fire protection features

c)

Before evaluating the life safety protection features

d)

After the building is occupied

82.

When does the plans examiner evaluate the means of egress? (681)

a)

As a final step in the plans review process

b)

After verifying the occupant load of the space or building

c)

Before verifying the occupant load of the space or building

d)

After the building is occupied

83.

Which of the following determines the occupancy classification for the proposed building? (680)

a)

fire inspector

b)

design professional

c)

general contractor

d)

code enforcement

84.

Which of the following has the responsibility of identifying the intended use of each room or section of a building? (680)

a)

Design professional

b)

General contractor

c)

Construction Crew

d)

Fire Inspector

85.

Who verifies occupancy classification is consistent with the intended use of the structure? (680)

a)

Design professional

b)

Fire marshal

c)

Code enforcement

d)

Inspector or Plans Examiner

86.

Who is required to provide occupant load calculations for verification? (681)

a)

Design professional

b)

Fire inspector

c)

General contractor

d)

Insurance companies

87.

Atriums and open shafts connecting two or more stories are permitted if they are provided with adequate smoke control, an automatic sprinkler system protection, and _____. (682)

a)

fire barriers

b)

fire doors

c)

fire alarms

d)

fire resistance

88.

Plans examiners must evaluate the exit capacity according to ____ (682)

a)

the manufacturer's recommendations

b)

the local building code

c)

the specifications of the appropriates codes

d)

recommendations from the fire marshal

89.

The theory behind building compartmentation is to limit any fire and resulting products of combustion to ____. (682)

a)

one area of the building

b)

the entire building

c)

the elevator shafts and hoistways

d)

fire and smoke dampers

90.

Which of the following must be considered during the plans review activities when reviewing special hazards? (683)

a)

Contents and processes

b)

Occupancy load

c)

Portable fire extinguishers

d)

Furnishings and decorations

91.

When do codes often permit less stringent requirements for interior finishes? (683)

a)

When automatic sprinkler systems are installed

b)

When there are sufficient number of fire extinguishers

c)

When the interior finishes are fire-rated

d)

When the interior finishes have third party testing

92.

Which of the following is MOST likely to contribute to the fire spread or smoke development? (683)

a)

Interior finishes

b)

Furnishings and decorations

c)

Insulation materials

d)

Special hazards

93.

Which architectural and fire safety symbol is this?

a)

Brick wall

b)

Concrete wall

c)

Concrete block wall

d)

Wall

94.

Which architectural and fire safety symbol is this?

a)

Building line

b)

Point of Beginning

c)

Utility Meter

d)

Electric Service

95.

Which architectural and fire safety symbol is this?

a)

Concrete wall

b)

Brick wall

c)

Concrete block wall

d)

Wall

96.

Which architectural and fire safety symbol is this?

a)

Concrete wall

b)

Concrete block wall

c)

Brick wall

d)

Wall

97.

Which architectural and fire safety symbol is this?

a)

Electrical Service

b)

Natural Gas Line

c)

Electrical Organ

d)

Fluorescent Light

98.

Which architectural and fire safety symbol is this?

a)

Door

b)

Double door

c)

Bifold Door

d)

Pocket door

99.

Which architectural and fire safety symbol is this?

a)

Fire hydrant

b)

Rebars

c)

Utility Meter

d)

Point of Beginning

100.

Which architectural and fire safety symbol is this?

a)

Bifold door

b)

Double door

c)

Pocket door

d)

Sliding door

101.

Which architectural and fire safety symbol is this?

a)

Fluorescent light

b)

Rebars

c)

Wall

d)

Natural Gas Line

102.

Which architectural and fire safety symbol is this?

a)

Point of Beginning

b)

Rebars

c)

Fire hydrant

d)

Utility Meter

103.

Which architectural and fire safety symbol is this?

a)

Rebars

b)

Building Line

c)

Utility Meter

d)

Fire Hydrant

104.

Which architectural and fire safety symbol is this?

a)

Wall

b)

Concrete block wall

c)

Concrete wall

d)

Brick wall

105.

Which architectural and fire safety symbol is this?

a)

Utility Meter or Valve

b)

Fire Hydrant

c)

Rebars

d)

Natural Gas Line

106.

Which common architectural and fire safety symbol is this?

a)

Bifold door

b)

Double door

c)

Pocket door

d)

Sliding door

107.

Which common architectural and fire safety symbol is this?

a)

Double casement window

b)

Double fixed window

c)

Fixed center casement window

d)

Double door

108.

Which common architectural and fire safety symbol is this?

a)

Double fixed window

b)

Double doors

c)

Fixed center casement window

d)

Double casement window

109.

Which common architectural and fire safety symbol is this?

a)

Fixed center casement window

b)

Double casement window

c)

Double fixed window

d)

Double door

110.

Which common architectural and fire safety symbol is this?

a)

Pocket door

b)

Sliding door

c)

Double door

d)

Bifold door

111.

Which common architectural and fire safety symbol is this?

a)

Stairs

b)

Double casement window

c)

Rebar

d)

Bifold door

112.

Which common architectural and fire safety symbol is this?

a)

Sliding door

b)

Pocket door

c)

Double door

d)

Bifold door

113.

Which common architectural and fire safety symbol is this?

a)

Natural gas line

b)

Electric Service

c)

Utility Meter

d)

Point of Beginning