Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

SEWERAGE

Total questions: 8

Worksheet time: 7mins

Name
Class
Date
1.

What is the organization that manages sewerage disposal in Malaysia?

a)

Sada

b)

TNB

c)

TM Point

d)

IWK

2.

What is the purpose of a sewage treatment plant?

a)

To recycle plastic waste

b)

The purpose of a sewage treatment plant is to treat wastewater to remove contaminants and protect public health and the environment.

c)

To store hazardous materials

d)

To generate electricity from waste

3.

Which of the followings materials can be use for sewer pipe

a)

Cast iron pipe

b)

Vitrified clay pipe

c)

Rubber pipe

d)

PVC pipe

4.

What are the main components of sewerage systems?

a)

Stormwater drains

b)

Water supply pipes

c)

Electrical conduits

d)

Sewer pipes, manholes, pumping stations, treatment plants, outfalls.

5.

The objects shown in the photo are ...

a)

Precast Manhole

b)

Precast Culvert

c)

Vertical Drain

d)

Soak away Pit

6.

Which factor use to estimate Population Equivalent for Semi Detached House

a)

4 per Bedroom

b)

1 per person

c)

5 per unit

d)

0.2 per person

7.

New shop lot with total area of 2500 sqm is under construction at Taman University Parit Raja,

calculate the PE for this building

a)

70PE

b)

75PE

c)

80PE

d)

85PE

8.

Calculate Population Equivalent for Hostel at KKTM Sri Gading with 1500 students on board

a)

750PE

b)

300PE

c)

7500PE

d)

1500PE