WorksheetsFactors Influencing Good Design in Construction
Total questions: 42
Worksheet time: 21mins
Fill in the blank: One of the factors that can influence good design is the benefits of good design and the potential implications of ________ design.
poor
modern
expensive
colorful
Fill in the blank: The different ________ affected in the construction chain is a factor that can influence good design.
parties
materials
machines
colors
Fill in the blank: Factors that can impact on the profitability of projects include over specification leading to higher costs, difficulty of assembly leading to increased timescales and increased ________.
budgets
profits
deadlines
resources
What is the term used to describe the principles of art and beauty that make something pleasing and attractive to look at?
Aesthetics
Dynamics
Syntax
Pragmatics
In construction terms, which of the following might aesthetics include?
Materials used
The shape and style of a building
Sense of space and light
All of the above
The scale of the building compared to the site
Different people may like different styles of building because:
personal preferences and cultural backgrounds influence their tastes
all buildings are designed the same way
people do not notice building styles
there is only one correct style of building
The image of the buildings most clearly demonstrates which aspect of aesthetics?
Symmetry
Color contrast
Minimalism
Ornamentation
What is a main factor that affects design?
Location
Budget
Materials
Weather
Why does a developer need to be confident the new building will sell at a profit?
So value for money is very important.
Because it will increase the city's population.
To ensure the building is environmentally friendly.
Because it will reduce construction time.
The development must meet the client’s brief while also meeting all current _________
Building Regulations
Financial Statements
Marketing Strategies
Interior Designs
Sustainability is a popular concern. New developments need to be fuel efficient, have a small carbon footprint, yet still offer improved _________
quality of life
traffic congestion
noise pollution
waste production
Good design is about how a building looks and functions; if it is efficient; how it contributes to wellbeing, quality of life and the community; if it is environmentally sustainable; and on budget offering value for money. Which of the following is NOT mentioned as a benefit of good design?
Efficient use of resources
Contribution to community
High construction cost
Value for money
According to the passage, why is it important for a new building to fit in with its surroundings?
It makes the building more expensive to construct.
It ensures the building improves the local area and community, and increases its resale value.
It reduces the need for planning permission.
It allows for more creative architectural styles.
Fill in the blank: Commercial buildings should be in locations and styles __________ to surrounding areas.
sympathetic
contradictory
isolated
irrelevant
Poundbury is designed to achieve which of the following?
A model for sustainable urban development
A center for advanced technology research
A major industrial hub
A tourist attraction focused on entertainment
According to Building Regulations Approved document L, what must any new build be efficient in?
Use of water
Use of energy
Use of materials
Use of space
Fill in the blank: Reasonable provision shall be made for the conservation of ______ and power in buildings by limiting heat gains and losses through thermal elements and other parts of the building fabric.
fuel
water
air
light
Fixed building services in new builds should be energy efficient and have effective controls to ensure no more fuel and power is used than is reasonable in the circumstances.
True
False
According to the passage, what is one way poor building design can impact saleability?
It makes properties easier to sell
It makes properties harder to sell as they don’t visually appeal to buyers or fail to meet their needs
It increases the value of properties
It has no effect on saleability
Fill in the blank: Poor building design can reduce ________, for example, if the available land is not used efficiently or the building is sited incorrectly on the land.
efficiencies
expenses
colors
heights
Poor building design can have a negative impact on the local community, such as blocking light, affecting wellbeing, or reducing the desirability of surrounding property.
True
False
Fill in the blank: The end user (from an individual buying a home, to a large business premises – and everything in-between) in the construction chain is called the _________?
client
contractor
supplier
architect
Fill in the blank: A person or group providing support or resources for the project and accountable for enabling success is known as the _________.
project sponsor
project manager
stakeholder
team member
Fill in the blank: Specialists within certain areas whose services are used at key stages throughout the project are called __________.
consultants
contractors
vendors
managers
Fill in the blank: Those who are often nominated and contracted to supply required materials at set stages throughout the building process are called __________.
suppliers
contractors
architects
inspectors
Fill in the blank: The construction and building services tradespeople who physically build and install services are called __________ and sub-contractors.
contractors
engineers
inspectors
designers
Which member of the construction project team defines aesthetic and functional needs and may also define the product requirements?
Consultant
Client
Architect
Engineer
Who in the construction project team assesses needs and risks and defines performance requirement?
Consultant
Sub-contractor
Contractor
Client
Which role in the construction project team takes advice from consultants and sub-contractors and may define performance requirements and list products?
Engineer
Architect
Contractor
Client
Who makes product selections based on specification and installation factors, may be responsible for design, and selects suppliers based on locality, delivery, and price factors?
Sub-contractor
Consultant
Engineer
Contractor
Which member of the construction project team interprets requirement of design team, may influence product selection, and selects sub-contractors based on capability, availability, and price factors?
Contractor
Client
Architect
Engineer
Who defines specialist requirements in the construction project team?
Engineer
Consultant
Sub-contractor
Client
During the design stage, it is important to have effective coordination between all ________.
disciplines
colors
seasons
machines
Which of the following is NOT an outcome of effective coordination between all disciplines during the design stage?
Timescales for completion of projects can be managed effectively.
Unexpected increases in project costs are avoided.
The building delivers on aesthetic, usability and efficiency goals.
The building becomes more expensive to maintain.
The building meets sustainability goals.
Effective coordination between all disciplines during the design stage ensures that timescales for completion of projects can be managed effectively.
True
False
Effective coordination between all disciplines during the design stage helps avoid unexpected increases in project costs.
True
False
Effective coordination between all disciplines during the design stage ensures the building delivers on aesthetic, usability and efficiency goals.
True
False
Effective coordination between all disciplines during the design stage ensures the building meets sustainability goals.
True
False
The difference in price between these two tap styles might be:
One tap style may be more expensive than the other due to design or material.
Both tap styles are always the same price.
The price difference is always more than $100.
There is never any price difference between tap styles.
According to the passage, what can poor planning in construction lead to?
Increased timescales
Projects overrunning
Spiraling costs
All of the above
Fill in the blank: Problems with contractors, sub-contractors and labour will also result in _______ and additional costs.
project overrun
early completion
reduced quality
increased safety
Poor planning can create gaps in the programme of work, late/incorrect deliveries, and difficulties in assembly.
True
False