wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Building, Sitework and Layout, and Foundation Quiz

Total questions: 25

Worksheet time: 19mins

Name
Class
Date
1.

Part of the Building above ground.

a)

Superstructure

b)

Sub-structure

c)

Foundation

d)

None of the above

2.

A building with 5-10 storeys and has elevators.

a)

Mid Rise

b)

Low Rise

c)

High Rise

d)

None of the above

3.

What are the components under Shelter Systems.

a)

Roof systems and Moisture and Thermal protection

b)

Doors and windows, and Wall systems

c)

Special construction, and Finish work

d)

All of the above

4.

A main building system that covers drains, pipes and sewers.

a)

Waste Disposal

b)

Water Supply

c)

Conveying Systems

d)

Cooling, Heating, Vent

5.

The geographic location of a construction project, usually defined by legal boundaries.

a)

Site

b)

Setback

c)

Layout

d)

Property Line

6.

The minimum required distance from every structure to the properly lines of a lot, established by a zoning ordinance to provide, air, light, solar access and privacy.

a)

Site

b)

Setback

c)

Layout

d)

Property Line

7.

The process of transferring the initial key points of an architectural design into the site for the purpose of constructing it.

a)

Layout

b)

Planning

c)

Designing

d)

Visit

8.

TCT stand for…

4 lines
9.

The strength of soil is called…

a)

Soil Bearing Capacity

b)

Solid Board Calculation

c)

Sand Bare Capacity

d)

Soil Bound Calculation

10.

A rigid, relatively slender structural member designed primarily to support axial, compressive loads.

a)

Column

b)

Beams

c)

Joist

d)

Foundation

11.

What does “RC” in RC Column stands for.

a)

Reinforced Concrete

b)

Rigid Concrete

c)

Raided Compost

d)

Reinforced Compost

12.

Stone columns aren’t straight… they have (a)   .

13.

The golden mean ration is…

a)

1.6180

b)

1.8160

c)

1.6081

d)

1.6810

14.

These are columns with longitudinal bars and lateral ties.

a)

Tied Column

b)

Spiral Column

c)

Composite Column

d)

Lally Column

15.

A structural steel column is embedded into the concrete core of a spiral column.

a)

Tied Column

b)

Spiral Column

c)

Composite Column

d)

Lally Column

16.

They are made up of channels or angles connected by lattice bars.

a)

Latticed Columns

b)

Starred Column

c)

Rolled H-Columns

d)

Built-up Columns

17.

Serves as a formwork for an RC slab

a)

Form Decking

b)

Composite Decking

c)

Cellular Decking

d)

Acoustical Decking

18.

Made by welding a corrugated sheet to a flat steel sheet.

a)

Form Decking

b)

Composite Decking

c)

Cellular Decking

d)

Acoustical Decking

19.

Moving or transient loads such as occupants, furnishing, rain, snow and ice.

a)

Live Loads

b)

Dead Loads

c)

Wind Loads

d)

Other Loads

20.

The part of the foundation bearing directly upon the supporting soil.

a)

Footing

b)

Column

c)

Structure

d)

Loads

21.

The loads of the building/structure are __________________, vertically through the columns.

4 lines
22.

The column, connected to a (a)   which spreads the load over a wide enough area of soil provided that the bearing capacity of the soil is not exceeded.

23.

A type of foundation constructed by manually or mechanically excavating the site until the desired depth of the footing is reached.

a)

Shallow Foundation

b)

Deep Foundation

c)

Mid Foundation

d)

Rear Foundation

24.

A thick, slab-like footing of reinforced concrete supporting a number of columns or an entire building.

a)

Mat Footing

b)

Strip Footing

c)

Isolated Footing

d)

Ribbed Mat

25.

Foundation driven into place instead of being drilled or poured.

a)

Pile Foundations

b)

Caisson Foundation

c)

Field Foundation

d)

Cushion Foundation