WorksheetsOil &Gas L3 Unit 13-Vocab
Total questions: 25
Worksheet time: 13mins
Name
Class
Date
1.
1. The amount of oil extracted daily from the rig is measured as its __________.
a)
output
b)
ventilation
c)
investment
d)
construction
2.
2. To keep the equipment from overheating, proper __________ is installed in the control room.
a)
ventilation
b)
buoy
c)
winch
d)
cabin
3.
3. The cooling system is designed to __________ the engine during operation.
a)
cool
b)
announce
c)
improve
d)
invest
4.
4. The rig supervisor will __________ the start of the drilling operation at 8 AM.
a)
announce
b)
winch
c)
invest
d)
ventilate
5.
5. The engineers stayed in the __________ near the platform for the duration of the project.
a)
cabin
b)
winch
c)
transformer
d)
improvement
6.
6. The team is focused on the __________ of the rig's safety measures to avoid accidents.
a)
improvement
b)
ventilation
c)
output
d)
buoy
7.
7. The company made a significant __________ in new drilling technology.
a)
investment
b)
console
c)
transformer
d)
buoy
8.
8. The equipment is stored in an __________ space to protect it from harsh weather.
a)
enclosed
b)
productive
c)
versatile
d)
constructed
9.
9. The team had a __________ day as they managed to drill several new wells.
a)
productive
b)
enclosed
c)
versatile
d)
ventilated
10.
10. The __________ was used to lower the drilling tools into the well.
a)
winch
b)
cabin
c)
console
d)
transformer
11.
11. The __________ is used to change the voltage of electricity needed for different operations on the rig.
a)
transformer
b)
cabin
c)
console
d)
output
12.
12. The __________ controls the power output and input in the electrical system.
a)
converter panel
b)
output
c)
winch
d)
improvement
13.
13. The __________ in the control room helps monitor and operate the drilling system.
a)
console
b)
cabin
c)
ventilation
d)
winch
14.
14. A __________ is used to mark the position of the rig at sea.
a)
buoy
b)
cabin
c)
console
d)
winch
15.
15. The new design is very __________, allowing it to be used in both deepwater and shallow water drilling.
a)
versatile
b)
enclosed
c)
productive
d)
ventilated
16.
16. The __________ of the new offshore platform took nearly two years.
a)
construction
b)
investment
c)
improvement
d)
output
17.
17. ___________ is the act of putting money, effort or time into something with the aim of making things better or making a bigger profit.
a)
investment
b)
construction
c)
improvement
d)
output
18.
18. The larger number or part of something / most, but not all is the __________.
a)
majority
b)
minority
c)
productivity
d)
availability
19.
19 Someone whose job is to use and control a machine or vehicle is a\an _________
a)
operator
b)
producer
c)
investor
d)
developer
20.
20 To _________ is to tell people about something officially.
a)
announce
b)
tell
c)
say
d)
speak
21.
21. _________ are things that are done to make something better than before.
a)
Improvements
b)
investment
c)
Drives
d)
Pulleys
22.
The ...........change the electricity from the direct current(DC) into the alternating current( Ac)
a)
converters
b)
transformers
c)
turbines
d)
fuel
23.
The ................make sure that the current is at the correct frequesncy.
a)
converter panels
b)
transforemers
c)
panels
d)
top drive
24.
The .................powers the drillstring.
a)
pit
b)
transformer
c)
converter panel
d)
top drive
25.
Modern machines need less maintenance and are more --------
a)
reliable
b)
reliability
c)
rely on
d)
rely
100 %
