wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

SSC Topic C011

Total questions: 6

Worksheet time: 3mins

Name
Class
Date
1.

What is the primary purpose of conducting on-going assessments on construction sites?

a)

To determine the cost of the project

b)

To evaluate the performance of workers

c)

To ensure the safety and proper equipment use

d)

To assess the architectural design

2.

Which of the following is NOT a type of personal protection equipment mentioned in the document?

a)

Hard hats

b)

Eye and face protection

c)

Hearing protection

d)

Fire extinguishers

3.

What should be checked for when scaffolds are used on a construction site?

a)

Proper lighting

b)

Fall protection and guardrails

c)

Color of the scaffold

d)

Number of workers on the scaffold

4.

Why is it important to have a written hazard communication program on a construction site?

a)

To ensure easy general access to MSDS/SDS information

b)

To keep track of employee attendance

c)

To manage the construction budget

d)

To design the layout of the site

5.

What should be done with temporary utilities, especially electrical ones, on a construction site?

a)

They should be painted

b)

They must be correctly installed

c)

They should be hidden from view

d)

They must be used only during the day

6.

What is the role of the site manager's office according to the document?

a)

To manage the financial aspects of the project

b)

To serve as the primary information hub of the project

c)

To design the construction layout

d)

To supervise the workers directly