Font size
WorksheetsQuiz 3 - Division 2: Siteworks
Total questions: 15
Worksheet time: 12mins
These are horizontal boards set to support the string outlining the building plan
(a)
A string with an attached weight on the end to check vertical alignment
(a)
It is the refilling of an excavated area after the desired construction activity is done.
(a)
It is any activity done in order to “prepare” a site for the actual building construction.
(a)
It is the earthwork activity that tackles on the deliberate changing of a site’s elevation or topographical features
(a)
It means the excavation of soil to a desired level and usage of such excavated soil as fill to level or increase the grade of another area.
(a)
It is done to assess both the surface and sub-surface conditions of the site.
(a)
This is a type of an excavation support usually used between Wide spaces using metal braces.
(a)
A type of bracing that consists of tendons attached to a rock or a soil anchored and prevents lateral movement of an installed retaining wall or any excavation support.
(a)
It holds organic and inorganic materials that was washed up along the water preventing it from clogging the sewer line.
(a)
It is a surface drain designed for collecting water runoffs in an open area.
(a)
Slopes are stabilized through covering it with a layer of broken stones.
(a)
Commonly used to establish the lines and points of references of the building.
(a)
This refers to the elevation of the ground at a specific point.
(a)
Is a method that uses temporary types of support to the soil.
(a)
