wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Electrical 1 Module 1

Total questions: 18

Worksheet time: 9mins

Name
Class
Date
1.

Phases of residential electrical wiring include

a)

Rough-in, trim-out, and finish

b)

Planning, installation, and inspection

c)

Design, build, and test

d)

Preparation, execution, and evaluation

2.

A major difference between residential and commercial wiring is that commercial wiring is usually installed in

a)

Plastic conduit

b)

Metal conduit

c)

Wooden frames

d)

Rubber tubing

3.

Industrial electricians are usually split into two groups: _______ and _______.

a)

Maintenance and construction

b)

Design and planning

c)

Testing and inspection

d)

Sales and marketing

4.

Your apprenticeship program requires _______ hours of OJL per year.

a)

1,000

b)

500

c)

2,000

d)

750

5.

OSHA requires that employers provide a safe and hazard-free job site. True or False?

a)

True

b)

False

6.

What is the federal government agency established to ensure a safe and healthy environment in the workplace?

a)

Electrical service

b)

Occupational Safety and Health Administration (OSHA)

c)

On-the-job learning (OJL)

d)

Raceway system

7.

Job-related learning acquired while working is known as what?

a)

Electrical service

b)

Occupational Safety and Health Administration (OSHA)

c)

On-the-job learning (OJL)

d)

Raceway system

8.

The main panelboard enclosure would probably be installed in which stage?

a)

Electrical service

b)

Rough-in

c)

Trim-out

d)

Raceway system

9.

What connects the serving utility to the premises wiring system?

a)

Electrical service

b)

Occupational Safety and Health Administration (OSHA)

c)

On-the-job learning (OJL)

d)

Raceway system

10.

An enclosure that houses conduit, boxes, and fittings in an electrical system is called what?

a)

Electrical service

b)

Occupational Safety and Health Administration (OSHA)

c)

Raceway system

d)

Trim-out

11.

Interior panels in residential wiring are typically installed during _____.

a)

rough-in

b)

trim-out

c)

service installation

d)

planning

12.

A residential wiring system typically uses _____.

a)

armored cable

b)

nonmetallic-sheathed cable

c)

tray cable

d)

medium-voltage cable

e)

flat conductor cable

13.

Commercial wiring is typically installed in _____.

a)

pairs

b)

air ducting

c)

metal raceways

d)

PVC raceways

14.

Which of the following would most likely require special knowledge of hazardous locations?

a)

Residential wiring

b)

Industrial wiring

c)

Commercial wiring

d)

Service work

15.

Minimum standards for apprentice training programs are established by _____.

a)

OSHA

b)

the DOL

c)

NCCER

d)

the employer

16.

Which type of cable is most commonly used for interior residential branch circuits?

a)

Armored cable

b)

Nonmetallic-sheathed cable

c)

Coaxial cable

d)

Fiber optic cable

17.

During which phase of electrical installation are outlets and switches typically installed?

a)

Planning

b)

Trim-out

c)

Inspection

d)

Rough-in

18.

Which organization sets safety standards specifically for electrical installations in the United States?

a)

National Fire Protection Association (NFPA)

b)

Occupational Safety and Health Administration (OSHA)

c)

Department of Labor (DOL)

d)

National Electrical Code (NEC)