1.

What are the three primary features of the Constitution?

a)

Statute Law, Common Law, Civil Code

b)

Division of Power, Creation of the Courts, Charter of Rights and Freedoms

c)

Federal Powers, Provincial Powers, Municipal Powers

d)

Legislative, Executive, Judicial

2.

What type of law is created by federal or provincial legislatures?

a)

Common Law

b)

Case Law

c)

Statute Law

d)

Administrative Law

3.

What are the three key features that make a contract enforceable?

a)

Voluntary Agreement, Consideration, Offer and Acceptance

b)

Performance, Payment, Approval

c)

Risk, Reward, Responsibility

d)

Consent, Condition, Capacity

4.

What is a construction lien?

a)

A legal claim placed on property to secure payment for labour or materials

b)

A document outlining payment terms between a client and contractor

c)

A form of permit issued by the municipality

d)

A voluntary waiver of rights

5.

What does it mean when a profession is “self-regulated”?

a)

The government directly manages professional conduct

b)

The profession governs itself through statutory authority

c)

Professionals can practice without regulation

d)

The courts control entry into the profession

6.

What does the Right to Title provide to professionals?

a)

The right to perform specific tasks

b)

The exclusive use of a professional title

c)

The ability to self-employ

d)

The right to open a professional association

7.

What Alberta act protects contractors’ and suppliers’ financial interests?

a)

Safety Codes Act

b)

Engineering and Geoscience Professions Act

c)

Prompt Payment & Construction Lien Act

d)

Municipal Government Act

8.

What is a letter of intent?

a)

A legally binding contract

b)

A document setting basic terms before a full contract is signed

c)

A schedule of payments

d)

A project scope statement

9.

What does it mean if a bid is irrevocable for 30 days?

a)

The contractor cannot withdraw the bid within that time frame

b)

The Owner must award the contract within 30 days

c)

The Consultant can revise the bid after closing

d)

The bid expires immediately after closing

10.

According to the Ron Engineering case, what happens when a bidder submits a bid?

a)

Contract B is formed immediately

b)

Contract A is formed between the Owner and Bidder

c)

No contract exists until construction begins

d)

The bid is only an invitation to treat

11.

What is the difference between Contract A and Contract B?

a)

Contract A = award of work, Contract B = bid submission

b)

Contract A = bid submission, Contract B = award of work

c)

Contract A = construction phase, Contract B = bidding phase

d)

Contract A and B are the same

12.

Under the CCDC 2, which party is responsible for coordinating the work and subcontractors on site?

a)

The Consultant

b)

The Contractor

c)

The Owner

d)

The Design-Builder

13.

Who is responsible for certifying payment to the Contractor under CCDC 2?

a)

The Owner

b)

The Consultant

c)

The Contractor

d)

The Quantity Surveyor

14.

Under the CCDC 2, the Contractor’s payment is based on what type of pricing structure?

a)

Cost Plus

b)

Unit Rate

c)

Stipulated (Lump Sum) Price

d)

Time and Material

15.

A contractor is working under a CCDC 2 contract for a project valued at $650,000. The project is 55 percent complete, and the required statutory holdback is 10 percent.

What amount is the holdback that must be retained by the Owner at this stage of the project?