WorksheetsSAP EAM Assessement_MCT
Total questions: 18
Worksheet time: 5mins
What is the maximum number of SAP sessions (screens) a user can open at the same time?
4
5
6
7
In scheduling, one month is equal to how many days in SAP system?
28
29
30
31
A single maintenance order can be assigned to multiple maintenance notifications.
True
False
Maintenance order can record cost.
True
False
Which of the following is a valid receiver of maintenance order cost?
Cost Center
Material
Order
All of the above
None of the above
Characterized by the fact that you plan required resources (work centers, materials, external companies, so on) in advance including scheduling
Breakdown
Corrective
Preventive
Condition-Based
A sub-order is a temporary cost collector, after the execution, the cost of the maintenance is typically to Asset's cost center.
True
False
It is possible to change the order type in a work order after creation?
True, all the time
False
True, if configured in the system
What is the purpose of using "/n" in the SAP command field?
To close the current session
To open a new SAP session
To log off from SAP
To log off from SAP
Which control key are you going to use for external service (with service entry)?
PM01
PM02
PM03
PM04
Describes a sequence of individual step of maintenance tasks (operations) and contains materials that are required during processing of activities.
Functional Location
Bill of Material
Task List
Maintenance Plan
It is a multi-level, hierarchal structure that is part of a technical structure. It also represents a system area at which an object can be installed.
Equipment
Functional Location
Task List
Maintenance Plan
Performing Work Center represents one person or a group of people who perform the maintenance work in the operations of an order.
True
False
It is used to represent the wear and tear of an object, consumption or reduction of an objects’ useful life
Measuring Point Counter
Measuring Point Non-Counter
Measurement Reading
Meter Reading
Breakdown maintenance is known in advance and the resources (work centers, materials, external services) cannot be planned
True
False
Used to formulate preventive maintenance and inspection tasks to be performed on technical objects. It also describes the dates and scope of the tasks
Maintenance Notification
Maintenance Order
Maintenance Task List
Maintenance Plan
Which of the following are the types of preventive maintenance?
Time-Based
Strategy
Condition-Based
Single Cycle
Performance-Based
It is the core, non-transactional, and critical information about key business entities.
Information System
Transactional Data
Master Data