IER 2009 Regulations and Procedures Worksheet

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

Regulation 1 of IER 2009 states:

a)

A. Title and citation of the regulation

b)

B. Duties of DOE officers

c)

C. Enforcement procedure

d)

D. Monitoring requirements

2.

Which regulation defines key terms such as “industrial effluent”, “mixed effluent”, and “sludge”?

a)

Regulation 2

b)

Regulation 3

c)

Regulation 4

d)

Regulation 5

3.

Regulation 3 explains that IER 2009 applies to premises that:

a)

Discharge air pollutants

b)

Discharge or release industrial effluent or mixed effluent

c)

Generate municipal solid waste

d)

Operate landfills

4.

Which parameter threshold automatically subjects a factory to IER 2009?

a)

A. BOD > 1 kg/day

b)

B. BOD or SS > 6 kg/day

c)

C. O&G < 5 mg/L

d)

D. COD > 10 mg/L

5.

Which regulation requires written notification to DOE before constructing or upgrading IETS?

a)

Regulation 3

b)

Regulation 4

c)

Regulation 6

d)

Regulation 10

6.

Notification to DOE under Regulation 4 must be made using:

a)

Second Schedule form

b)

Fifth Schedule form

c)

Tenth Schedule form

d)

Seventh Schedule form

7.

The Industrial Effluent Characterization Study (IECS) supports industries by:

a)

Identifying sources and characteristics of raw effluent

b)

Measuring air pollutants

c)

Calculating chemical inventory

d)

Estimating labor needs

8.

The written declaration certifying IETS design compliance must be submitted using:

a)

Second Schedule

b)

Third Schedule

c)

Fifth Schedule

9.

The monthly Online Environmental Report (OER) submission deadline is:

a)

7 days after month-end

b)

14 days after month-end

c)

30 days after month-end

d)

60 days after month-end

10.

Regulation 8 emphasizes:

a)

Proper operation and maintenance of IETS

b)

COD testing

c)

Air quality control

d)

Waste storage labeling

11.

The term performance monitoring means:

a)

Measuring pollutant levels at the river

b)

Routine check of treatment efficiency to ensure process functionality

c)

DOE auditing of design documents

d)

Effluent tax calculation

12.

Under Regulation 10, each IETS must be supervised by:

a)

Any factory worker

b)

A DOE inspector

c)

A certified competent person (CePIETSO)

d)

An environmental lawyer

13.

The competent person requirement is enforced by which body?

a)

DOE

b)

DOSH

c)

CIDB

d)

MITI

14.

The number of competent persons required depends on:

a)

Factory size only

b)

Operation type and number of shifts per day

c)

Chemical storage volume

d)

Water source distance

15.

Regulation 11 specifies acceptable discharge limits for parameters other than COD in:

a)

Fifth Schedule

b)

Sixth Schedule

16.

Under Regulation 11, what is the maximum pH range for Standard A discharge?

a)

5–9

b)

6.0–9.0

c)

6.5–8.5

d)

7–8

17.

Standard A applies when discharge point is:

a)

Downstream of water intake

b)

Upstream of water abstraction point

c)

Into marine outfall

d)

Into sanitary sewer

18.

COD discharge limits for each industry type are stated in:

a)

Fifth Schedule

b)

Sixth Schedule

c)

Seventh Schedule

d)

Ninth Schedule

19.

For “other industries,” what is the Standard B COD limit under Regulation 12?

a)

100 mg/L

b)

200 mg/L

c)

250 mg/L

d)

400 mg/L

20.

Regulation 28 concerns:

a)

Training of all employees involved in IETS operation

b)

Emergency evacuation drills

c)

Financial auditing

d)

Safety helmet compliance