wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Technical Drawing Dimensions Review

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

If a part measures 3/4 inch on a scaled drawing but its actual size is 2 inches, what dimension should be shown on the drawing?

a)

0.75

b)

1.00

c)

2.00

d)

3.00

2.

Why is it important to show the actual size of an object on a technical drawing rather than the scaled size?

a)

To make the drawing look bigger

b)

To ensure accurate manufacturing of the part

c)

To save space on the paper

d)

To confuse the reader

3.

A student is dimensioning a rectangular block with a hole. They place the overall width, height, and depth dimensions farthest from the object, and the smaller, intermediate dimensions closer to the object. What principle are they applying?

a)

Placing all dimensions randomly

b)

Including overall dimensions in the three principal directions and nesting intermediate dimensions closer

c)

Only dimensioning the largest features

d)

Ignoring intermediate dimensions

4.

What is the main purpose of including all dimensions in a technical drawing?

a)

To make the drawing look more complex

b)

To ensure the part can be produced or inspected correctly

c)

To reduce the amount of information on the drawing

d)

To confuse the manufacturer

5.

According to the guidelines, what should you avoid when adding dimensions to a technical drawing?

a)

Including unnecessary chain dimensions that add up to a given overall dimension.

b)

Using only one method to show dimensions.

c)

Adding as many dimensions as possible.

d)

Ignoring overall dimensions.

6.

What is the main guideline mentioned in the image for creating technical drawings?

a)

Always use the largest possible dimensions

b)

Do not include unnecessary dimensions

c)

Add as many dimensions as possible

d)

Only use metric units

7.

Based on the diagram, which of the following best describes the correct way to dimension a technical drawing?

a)

Include every possible measurement, even if not needed

b)

Only include dimensions that are necessary for manufacturing or inspection

c)

Use random numbers for dimensions

d)

Add dimensions to every line in the drawing

8.

According to proper dimensioning practices, how many views should a dimension be attached to?

a)

Only one view

b)

Two views

c)

All available views

d)

It does not matter

9.

Based on the diagram, what is the main error shown in the dimensioning of the object?

a)

A dimension is attached to more than one view using extension lines

b)

The object is not fully dimensioned

c)

The views are not aligned properly

d)

The dimensions are written in the wrong units

10.

Given a technical drawing with three views, what is the best practice for attaching a dimension?

a)

Attach each dimension to only one view

b)

Attach each dimension to all views

c)

Attach dimensions randomly

d)

Do not use dimension lines

11.

Given a technical drawing with multiple views, what is the best practice for dimension placement?

a)

Place dimensions between adjacent views

b)

Place all dimensions on a single view

c)

Place dimensions outside the drawing border

d)

Place dimensions only on the isometric view

12.

According to the guideline shown, what should you avoid when dimensioning a technical drawing?

a)

Dimensioning to hidden lines

b)

Dimensioning to visible lines

c)

Using only metric units

d)

Adding too many dimensions

13.

What does the diagram illustrate about dimension placement in technical drawings?

a)

Dimensions should not be placed on the object unless necessary

b)

All dimensions must be placed on the object

c)

Dimensions are not needed in technical drawings

d)

Only vertical dimensions should be placed on the object

14.

Why is it important not to cross dimension lines with other dimension or extension lines in technical drawings?

a)

It helps keep the drawing clear and easy to read

b)

It makes the drawing look more colorful

c)

It allows for more dimensions to be added

d)

It reduces the number of lines needed

15.

Given a technical drawing, how would you check if the dimensioning follows the correct practice described in the image?

a)

Ensure that no dimension line crosses another dimension or extension line

b)

Check if all lines are the same length

c)

Make sure all dimensions are written in red ink

d)

Verify that all lines are parallel

16.

Why is it considered incorrect to cross dimension or extension lines with leader lines in technical drawings?

a)

It can cause confusion and reduce the clarity of the drawing.

b)

It makes the drawing look more detailed.

c)

It is required for all engineering drawings.

d)

It helps to highlight important dimensions.

17.

According to the guideline shown, what should you avoid when drawing leader lines in technical drawings?

a)

Crossing dimension or extension lines with leader lines

b)

Placing dimensions outside the drawing

c)

Using only straight lines for all features

d)

Adding unnecessary details to the drawing

18.

If a leader line must be added to a technical drawing, what is the best practice regarding its placement?

a)

Place it so it does not cross dimension or extension lines

b)

Place it wherever there is space

c)

Place it parallel to the longest edge

d)

Place it at the center of the drawing

19.

According to standard drafting practices, in which view should holes be located and sized?

a)

In the view that shows the feature as a circle.

b)

In the view that shows the feature as a rectangle.

c)

In any view, as long as the dimensions are clear.

d)

In the isometric view only.

20.

Given a technical drawing with a hole, what is the best practice for dimensioning the hole?

a)

Dimension the hole in the view where it appears as a circle.

b)

Dimension the hole in the side view only.

c)

Dimension the hole in the isometric view.

d)

Dimension the hole in all views.

21.
Current dimensioning practices require the DIAMETER symbol be:
a)
The abbreviation "DIA".
b)
The letter "D".
c)
A circle with a slash extending through it.
d)
Given AFTER the number representing its size.
22.
A dimension is a measurement written as a _____.
a)
range
b)
number
c)
letter
d)
symbol
23.

In technical drawing, what is the purpose of dimensions?

a)

To add colour to the drawing

b)

To provide measurements and sizes of objects

c)

To create a 3D effect

d)

To make the drawing more artistic

24.

Which of the following is a correct practice when placing dimension lines in a technical drawing?

a)

Draw dimension lines through the object

b)

Use different colors for each dimension line

c)

Keep dimension lines spaced evenly and avoid crossing other lines

d)

Place all dimension lines on top of each other

25.

What is the recommended way to indicate the radius of a rounded feature in a technical drawing?

a)

Write the word 'radius' after the number

b)

Use the letter 'R' before the dimension value

c)

Draw a square around the dimension

d)

Underline the dimension value