How many PBN functionalities are there?
3
4
5
6
How many PBN functionalities are there?
4
5
6
7
In the safety assessment timeline, the project team setup project objectives scopes and timescales during:
A. Week 1 – 3
B. Week 3 – 7
C. Week 1 – 4
D. Week 4 – 7
In the safety assessment timeline, the design concept and qualitation analysis during:
Week 1 – 3
Week 3 – 7
Week 1 – 4
Week 4 – 7
RNP APCH operational requirements are defined in;
Doc 9613, Volume II, Part C, Chapter 4
Doc 9613, Volume II, Part C, Chapter 5
Doc 9613, Volume II, Part C, Chapter 6
Doc 9613, Volume II, Part C, Chapter 7
During the initial and intermediate approach segments, the lateral total system error accuracy for RNP APCH is:
1 NM, 95%
0.5 NM, 95%
0.3 NM, 95%
2 NM, 95%
During the initial and intermediate approach segments, the along – track error accuracy for RNP APCH is:
1 NM, 95%
0.5 NM, 95%
0.3 NM, 95%
2 NM, 95%
During the final approach segments, the lateral total system error and along – track error accuracy for RNP APCH is:
1 NM, 95%
0.5 NM, 95%
0.3 NM, 95%
2 NM, 95%
During the initial, intermediate and missed approach segments, the flight technical error accuracy for RNP APCH is:
<1 NM, 95%
<0.5 NM, 95%
<0.3 NM, 95%
<0.25 NM, 95%
During the final approach segments, the flight technical error accuracy for RNP APCH is:
<1 NM, 95%
<0.5 NM, 95%
<0.3 NM, 95%
<0.25 NM, 95%
The probability of major failure condition for RNP APCH is
1x10−5
<1x
<2x
<2x
For RNP APCH, during the initial, intermediate and missed approach segments, system shall alert when:
The probability that lateral TSE exceeds 2.0 NM greater than 1×10−5
The probability that lateral TSE exceeds 1.0 NM greater than 1x
The probability that lateral TSE exceeds 2.0 NM greater than 2x
The probability that lateral TSE exceeds 1.0 NM greater than 2x
For RNP APCH, during the final approach segments, system shall alert when:
The probability that lateral TSE exceeds 2.0 NM greater than 1x
The probability that lateral TSE exceeds 0.6 NM greater than 1×10−5
The probability that lateral TSE exceeds 2.0 NM greater than 2x
The probability that lateral TSE exceeds 0.6 NM greater than
Which of the following is a feature of RNP AR APCH?
Scalability
RF turns capabilities
Fixed radius transitions
Scalability and RF turns capabilities
RNP AR APCH vertical navigation performance is based upon
Barometric VNAV
SBAS
Barometric VNAV or SBAS
GBAS
RNP AR APCH operational requirements are defined in:
Doc 9613, Volume II, Part C, Chapter 4
Doc 9613, Volume II, Part C, Chapter 5
Doc 9613, Volume II, Part C, Chapter 6
Doc 9613, Volume II, Part C, Chapter 7
RNP AR APCH can have RF leg types in which segment?
En – route
Approach, arrival
Departure
All segments
In the terminal and missed approach segments, RNP AR APCH has lateral accuracy that can range below:
1
2
0.3
4
In the final approach segments, RNP AR APCH has lateral accuracy that can scale to:
RNP 1 or lower
RNP 2 or lower
RNP 4 or lower
RNP 0.3 or lower
The range of lateral accuracy values for RNP AR APCH is:
0.3 to 0.5 NM
0.5 to 1 NM
0.1 to 0.3 NM
0.25 to 0.5 NM
The vertical accuracy for RNP AR APCH defines:
99.5% of system error in vertical direction
99.6% of system error in vertical direction
99.7% of system error in vertical direction
99.8% of system error in vertical direction
The navigation infrastructure used in RNP AR APCH:
GNSS
GNSS, IRU, DME
GNSS, IRU
GNSS, IRU, DME, VOR
When missed approach for RNP AR APCH requires accuracy value <1.0 NM, aircraft must be able to couple autopilot/ flight director by
400 feet AGL
500 feet AGL
600 feet AGL
700 feet AGL
How many methods for the design of CDO are there?
1
2
3
4
How many main options for open path design are there?
1
2
3
4
The sensor(s) used for GPS NPA is (are):
GNSS
GNSS + Baro VNAV
GPS + SBAS
GPS + ABAS
The sensor(s) used for APV Baro is (are):
GNSS
GNSS + Baro VNAV
GPS + SBAS
GPS + ABAS
The sensor(s) used for APV SBAS is (are):
GNSS
GNSS + Baro VNAV
GPS + SBAS
GPS + ABAS
The chart minima for GPS NPA is called:
LNAV
LNAV/VNAV
The chart minima for APV Baro is called:
LNAV
LNAV/VNAV
LP
LPV
The chart minima for APV SBAS is called:
LNAV
LNAV/VNAV
LP
LPV