wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

2nd Quarter ASNC1 Exam

Total questions: 60

Worksheet time: 38mins

Name
Class
Date
1.

What is the first step in preparing a job estimate?

a)

Ordering spare parts

b)

Inspecting vehicle condition

c)

Preparing an invoice

d)

Asking for payment

2.

A job estimate must include all of the following EXCEPT:

a)

Labor cost

b)

Materials needed

c)

Customer's insurance history

d)

Estimated time of completion

3.

Which document serves as the customer's written approval for repair work?

a)

Job order form

b)

Purchase order

c)

Service report

d)

Delivery receipt

4.

What is the main purpose of job estimation in automotive servicing?

a)

To delay repair time

b)

To identify defective parts only

c)

To determine the cost and time required

d)

To create a sales quotation

5.

When preparing estimates, labor cost is often computed based on:

a)

Vehicle color

b)

Time spent and rate per hour

c)

Shop rental

d)

Technician preference

6.

What is the standard symbol used for a ground connection in electrical drawings?

a)

Triangle

b)

Zigzag line

c)

Horizontal line with three decreasing lines below

d)

Circle with cross

7.

Which instrument is commonly used to draw straight lines in technical drawings?

a)

Compass

b)

Ruler or T-square

c)

Divider

d)

French curve

8.

Technical drawings are used in automotive servicing to:

a)

Entertain clients

b)

Record timekeeping

c)

Communicate exact specifications and dimensions

d)

Serve as warranty forms

9.

What is the correct meaning of the acronym "BOM" in technical drawing?

a)

Bill of Materials

b)

Base of Measurements

c)

Basic Object Map

d)

Blueprint of Machine

10.

In interpreting technical drawings, solid lines usually represent:

a)

Hidden parts

b)

Visible edges

c)

Center lines

d)

Dimensions

11.

What color of safety sign indicates "Mandatory Action"?

a)

Blue

b)

Green

c)

Yellow

d)

Red

12.

Which of the following PPE should be worn when grinding metal parts?

a)

Ear plugs only

b)

Gloves and safety goggles

c)

Cap and apron

d)

Face mask only

13.

Waste oil should be:

a)

Poured into the drainage

b)

Disposed in any open field

c)

Collected in sealed containers for recycling

d)

Mixed with coolant

14.

Fire extinguisher labeled "ABC" is suitable for:

a)

Paper, liquids, and electrical fires

b)

Paper only

c)

Oil only

d)

Electrical only

15.

The most important rule in maintaining workplace safety is:

a)

Work faster

b)

Ignore minor injuries

c)

Follow safety procedures at all times

d)

Wear new clothes daily

16.

What should be done after completing a repair job?

a)

Immediately release the car

b)

Conduct a quality inspection

c)

Ask for customer feedback only

d)

Record expenses

17.

The purpose of quality inspection is to:

a)

Ensure repairs meet specifications

b)

Delay work delivery

c)

Increase production cost

d)

Ignore minor defects

18.

Which of the following best describes "defect"?

a)

Any deviation from standard requirement

b)

A complete repair job

c)

Customer satisfaction

d)

Vehicle cleanliness

19.

In automotive quality control, a checklist is used to:

a)

Record attendance

b)

Monitor materials

c)

Verify completion of specific tasks

d)

Compute total cost

20.

Non-conformance report (NCR) is prepared when:

a)

A product meets all standards

b)

Work fails to meet required quality

c)

Customer pays early

d)

Tools are complete

21.

Quality system in the workshop ensures:

a)

Consistency and customer satisfaction

b)

Delay of repair jobs

c)

Higher pricing

d)

More paperwork only

22.

Which document records quality procedures in the workshop?

a)

Quality manual

b)

Invoice

c)

Purchase order

d)

Time card

23.

Continuous improvement means:

a)

Repeating the same process

b)

Making small, ongoing enhancements in quality

c)

Reducing staff

d)

Working longer hours

24.

ISO 9001 is related to:

a)

Environmental protection

b)

Quality management system

c)

Automotive fuel rating

d)

Product design

25.

Which of the following is an example of a quality tool?

a)

Check sheet

b)

Hammer

c)

Wrench

d)

Socket

26.

The first step in providing work instruction is:

a)

Evaluate trainee’s skills

b)

Dismiss the trainee

27.

Demonstration should be followed by:

a)

Trainee practice

b)

Immediate assessment

c)

Written exam

d)

Verbal report

28.

Good work instruction must be:

a)

Complex and lengthy

b)

Clear, accurate, and complete

c)

Verbal only

d)

Recorded without feedback

29.

When instructing, the trainer should:

a)

Show the correct method step-by-step

b)

Let trainees guess the process

c)

Focus on paperwork

d)

Avoid questions

30.

Effective feedback should be:

a)

Criticizing the trainee

b)

Timely, constructive, and specific

c)

General and delayed

d)

Ignored

31.

Proper housekeeping helps prevent accidents in the workshop.

a)

True

b)

False

32.

Technical drawings are unnecessary in identifying components.

a)

True

b)

False

33.

Wearing PPE is optional when performing repair work.

a)

True

b)

False

34.

Quality inspection should only be done for major repairs.

a)

True

b)

False

35.

Fire extinguishers should be checked regularly for pressure and expiry date.

a)

True

b)

False

36.

Continuous improvement involves evaluating and updating work processes.

a)

True

b)

False

37.

Oil spills should be cleaned immediately using absorbent materials.

a)

True

b)

False

38.

Environmental safety is part of automotive workshop responsibility.

a)

True

b)

False

39.

A quality manual outlines the company’s commitment to standards.

a)

True

b)

False

40.

Only the supervisor is responsible for maintaining quality.

a)

True

b)

False

41.

Work instructions should be delivered in a confusing manner to test the trainee’s attention.

a)

True

b)

False

42.

Feedback should focus on performance, not personality.

a)

True

b)

False

43.

Inspection records are essential for traceability of repair work.

a)

True

b)

False

44.

Waste segregation has no impact on workshop safety.

a)

True

b)

False

45.

The goal of a quality system is to achieve consistent output that meets customer expectations.

a)

True

b)

False

46.

A detailed list of tasks, materials, and costs for a repair job.

(a)  

47.

A standardized drawing that shows dimensions and structure of components.

(a)  

48.

Protective equipment worn to prevent injury.

(a)  

49.

A process that ensures a product meets established standards.

(a)  

50.

The process of ensuring repairs are done correctly before releasing the vehicle.

(a)  

51.

The international standard for quality management systems.

(a)  

52.

A written record of step-by-step procedures for performing a task.

(a)  

53.

The act of showing and explaining a job process to a trainee.

(a)  

54.

A document that shows deviation or non-compliance with quality standards.

(a)  

55.

The practice of continually making small improvements to systems or processes.

(a)  

56.

Component designed and manufactured by the vehicle's original company.

(a)  

57.

This type of drawing shows the relationship of different electrical components.

(a)  

58.

A type of hazard that can cause injury due to flying debris or particles.

(a)  

59.

The process of estimating total job cost including labor, materials, and time.

(a)  

60.

A form of workshop documentation used to track inspection results.

(a)