1.
Which of the following does not represent an activity?
a)
Site located
b)
Foundation is being dug
c)
The office area is being cleaned
d)
The invitations are being sent
2.
Critical path method
a)
Is an improvement upon bar chart method
b)
Provides a realistic approach to daily problems
c)
Avoids delays which are very common in bar charts
d)
All the above
3.
Which of the following is not a PERT event?
a)
Site investigation started
b)
Sessional work completed
c)
Bus starts from Jaipur
d)
Class is being attended
4.
The first method invented for planning projects, was
a)
Bar chart method
b)
Milestone chart
c)
Critical path method (CPM)
d)
Programme Evaluation and Review Technique (PERT)
5.
The difference between the time avail-to do a job and the time required to do the job, is known as
a)
Event
b)
Float
c)
Duration
d)
Activity
6.
A dummy activity
a)
Is artificially introduced
b)
Is represented by a dotted line
c)
Does not consume time
d)
All the above
7.
The area under the Beta distribution curve is divided into two equal parts by
a)
Most likely time
b)
Optimistic time
c)
Pessimistic time
d)
Expected time
8.
Interfering float is the difference between
a)
Total float and free float
b)
free float and independent float
c)
total float and independent float
d)
none of the above
9.
Updating may result in
a)
change of critical path
b)
decrease of project completion time
c)
increase of project completion time
d)
all of the above
10.
Write a synonym of:
assess =
(a)
11.
Write a synonym of:
postpone
(a)
12.
Choose all the possible answers:
Do you think ________________ when people are having an argument is a good idea?
a)
intervening
b)
intervene
c)
stepping in
d)
bounce back
13.
Choose all the possible answers:
Have you __________ what you are doing to be a better person?
a)
assess
b)
assessed
c)
sized up
d)
intervened