Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

12. Inspection & Testing

Total questions: 45

Worksheet time: 23mins

Name
Class
Date
1.

According to the Electricity at Work Regulations 1989, the person who may carry out an unsupervised inspection of electrical systems will have

a)

A good understanding of the Building Regulations

b)

An IET Wiring Regulations qualification

c)

Appropriate knowledge and experience of inspection work (Note: definition of a Competent person)

d)

Five years’ experience of a range of electrical installation work

2.

A person carrying out safe isolation is required to

a)

Only use a multimeter

b)

Assume labelling is correct

c)

Correctly identify the circuit

d)

Only isolate at the mains

3.

Proving units are used to ensure that

a)

Insulation resistance testers function correctly

b)

Multimeters function correctly

c)

Low resistance ohmmeters function correctly

d)

Approved voltage indicators function correctly

4.

For what reason might isolation of a circuit need to occur on a weekend?

a)

Avoids the need to notify a loss of supply

b)

So that apprentices can learn the trade

c)

Need to maintain overtime work

d)

Need to maintain productivity in a factory

5.

A new build project needs the supply to a socket outlet to be energised from a distribution board (DB) that has yet to be completed. Before energising the socket outlet the inspector should

a)

Test the circuit only

b)

Install the DB cover only

c)

Test the circuit and install the DB cover

d)

Inspect the circuit and install the DB cover

6.

Which document gives a tester the authority to open a live distribution board for testing purposes?

a)

Permit to work

b)

Risk assessment

c)

Method statement

d)

Schedule of inspections

7.

Which of these is not a purpose of initial verification as described by BS7671?

a)

The installation is fit for continued use

b)

The avoid danger to persons and livestock

c)

The requirements of the regulations have been met

d)

To avoid damage to property

8.

When should inspection and testing be carried out?

a)

After the installation is energised

b)

On completion of the installation only

c)

During erection of the installation only

d)

During erection and on completion of the installation

9.

Which of these documents is statutory?

a)

The Electricity at Work Regulations 1989

b)

IET Wiring Regulations

c)

IET Guidance Note 3

d)

NICEIC Guide to Inspecting and Testing

10.

To correctly assess whether a new installation complies with the regulations, certain information should be made available to the inspector. This requirement does not include:

a)

Installation maintainability

b)

Type of system earthing

c)

Nature of supply

d)

Maximum demand

11.

During an inspection, which checks are to prevent mutual detrimental influence between electrical and non-electrical installations?

a)

Checking functional switches are accessible

b)

Making sure that all bonding is in place

c)

Checking that steam or heat will not damage the electrical installation

d)

Making sure connections are correctly labelled

12.

Which diagram illustrates checking or nulling the test leads before starting a continuity test?

a)

The first diagram

b)

The second diagram

c)

The third diagram

d)

The fourth diagram

13.

A radial power circuit has been installed without any spurs, and is protected by a 32A type B circuit breaker. What is the minimum cross-sectional area (c.s.a) of the live conductors?

a)

2.5mm²

b)

4mm²

c)

6mm²

d)

1.5mm²

14.

When inspecting a bathroom, there was a space under the bath which was accessible without the use of a tool. This space is regarded as being:

a)

Within zone 1

b)

Within zone 0

c)

Outside of the prescribed zones

d)

Within zone 2

15.

What is the minimum IP rating for correctly rated and protected current, using equipment in zone 1 of a room containing a fixed bath if there are no water jets?

a)

IP 5X

b)

IP X5

c)

IP X4

d)

IP 4X

16.

An alternative method for this test that uses a long wander lead is often referred to as continuity test method. What is the number associated with this method?

a)

3

b)

4

c)

1

d)

2

17.

What is the correct scale for the measurement of insulation resistance?

a)

ms

b)

kA

c)

MΩ

d)

Ω

18.

Which diagram shows inadequate basic protection?

a)

(a)

b)

(b)

c)

(c)

d)

(d)

19.

When conducting testing of a premises which has been in service for 15 years, what is the appropriate action to take if a reading fails the test but there is no imminent danger present?

a)

Pass the circuit, record a good reading as there is no imminent danger and continue with the rest of the testing

b)

Record the result, issue the relevant classification code and inform the client

c)

Record the value, issue a code 1 and lock off the particular circuit breaker

d)

Record the value, no code needed but advise the client that work will need to be completed at the next test interval

20.

The sequence of testing as shown in GN3 is carried out during initial verification of new build because:

a)

This is the sequence laid down by the Electricity at Work Regulations and cannot be changed

b)

The result of a previous test may influence the next test

c)

GN3 is a statutory document and must be followed in that order

d)

This is the sequence laid down by the Building regulations and cannot be changed

21.

The reason to carry out the continuity of protective conductors’ test is to ensure that the conductor:

a)

Is broken

b)

Has no resistance

c)

Is not broken and is of low resistance

d)

Has a resistance

22.

A long return lead is used to test the continuity of the protective conductor. Meter nulling is not available. Which calculation must be performed to find the resistance of the protective conductor?

a)

Multiply the resistance of the long lead with the reading taken at the test point

b)

Add the resistance of the long lead to the reading taken at the test point

c)

Subtract the resistance of the long lead from the reading taken at the test point

d)

Divide the resistance of the long lead by the reading taken at the test point

23.

A ring final circuit test is carried out. During step 1 of the test the resistance of the end to end loops at the consumer unit are r1: 0.8Ω, r2: 1Ω. If the circuit has no spurs, what is the expected value of R1 + R2?

a)

0.3Ω

b)

0.45Ω

c)

0.9Ω

d)

0.6Ω

24.

Which will decrease the resistance of a copper conductor?

a)

operate the conductor at a lower temperature (Note: Carbon brushes in motors has the opposite effect)

b)

replace the conductor with one of smaller csa

c)

increase the cable length

d)

add another cable in series

25.

Testing for insulation resistance may involve disconnecting or removing which of the following?

a)

Joint boxes

b)

Switches

c)

Electronic devices

d)

MCB’s

26.

What is the insulation resistance test voltage for a single-phase circuit?

a)

500V d.c

b)

500V a.c

c)

250V a.c

d)

250V d.c

27.

When a cable’s length is reduced, the effect on the insulation resistance will be to:

a)

Stay the same

b)

Reduce

c)

Increase

d)

Fluctuate

28.

Why is it necessary to check the polarity of the supply to an installation?

a)

The supply may have swapped live conductors (Note: Live meaning line and neutral)

b)

The installation wiring may be incorrectly connected

c)

The supply earth may be incorrect

d)

The supply voltage may have an incorrect value

29.

Which instrument is used to confirm the polarity of the incoming supply?

a)

An earth fault loop impedance tester

b)

A low resistance ohm meter

c)

An approved voltage indicator

d)

An insulation resistance meter

30.

The three results from an earth electrode tester on a TT system were 100Ω, 110Ω and 90Ω. What value is recorded on the schedule of test results?

a)

90Ω

b)

100Ω

c)

200Ω

d)

110Ω

31.

As part of a TN-C-S earthing system the supply uses

a)

A separate neutral and earth cable

b)

Isolation of the neutral from earth

c)

The earth as part of the earth fault loop

d)

A combined neutral and earth cable

32.

The value of Ze was enquired from the DNO and a value of 0.35Ω was given. The earthing arrangement is most likely to be

a)

TT

b)

TN-C-S

c)

IT

d)

TN-S

33.

If Ze is 0.35Ω and (R1 + R2) is 0.25Ω, the value of Zs will be

a)

0.35Ω

b)

0.25Ω

c)

0.6Ω

d)

0.0875Ω

34.

The measured value of prospective fault current for a single-phase installation can be checked by

a)

Looking in BS 7671 IET Wiring Regulations

b)

Voltage divided by the demand load

c)

Voltage divided by Ze

d)

Looking in BS 7671 On Site Guide

35.

What is the minimum permitted value to be found on a protective device at the origin of a 230V single phase circuit where Ze is 0.12Ω?

a)

6000

b)

1500

c)

3000

d)

10000

36.

An RCD is used for additional protection. When tested it will be subject to a maximum test current of at least

a)

300mA

b)

150mA

c)

100mA

d)

30mA

37.

The phase sequence should be checked at

a)

Each multiphase distribution circuit only

b)

Each multiphase final circuit only

c)

The origin and each multiphase distribution and multiphase final circuit

d)

The origin only

38.

A check for phase sequence at the main intake to a three-phase installation indicated a result of L1, L3, L2. The correct orientation at each subsequence distribution board is

a)

L2, L1, L3

b)

L2, L3, L1

c)

L3, L2, L1

d)

L1, L3, L2

39.

An RCD should have its test button checked to show that the

a)

Device will operate at a set current

b)

Device will operate

c)

Device will operate at a set current and time

d)

Device will operate within a set time

40.

On completion of an electrical installation and in addition to an Electrical Installation Certificate. The inspector should issue the person ordering the work with a

a)

Building Control Certificate and a schedule of inspections

b)

Schedule of test results and a schedule of inspection

c)

Schedule of test results only

d)

Schedule of inspections only

41.

Which certificate serves the purpose of confirming that a new circuit has been designed, constructed and inspected and tested to conform to BS 7671?

a)

Electrical Installation Certificate

b)

Electrical Installation Condition Report

c)

Minor Electrical Installation Works Certificate

d)

Landlords safety certificate

42.

On which document is the nature of supply parameters recorded?

a)

Electrical Installation Certificate

b)

Schedule of Inspections

c)

Minor Electrical Installation Work Certificate

d)

Schedule of test results

43.

After initial verification of a new build domestic house, under normal usage, what would be the expected time interval to the first inspection and test?

a)

20 years

b)

10 years

c)

15 years

d)

5 years

44.

How long should the documentation be kept after an initial verification?

a)

20 years

b)

For the working lifetime of the building

c)

Until the next inspection

d)

Until there is an alteration to the building

45.

Which is not allowed to be used as a protective conductor?

a)

A metal conduit

b)

Flexible conduit

c)

A conductor within a cable

d)

A single core cable